(d)Sale orders received at the colliery end should be entered in Coal Dispatch register<br />

serially on seniority basis.<br />

(e)Customer-wise & sale order wise ‘Road sale Register is to be maintained at colliery<br />

/weighbridge. All sale orders received at the Project/colliery are to be entered in the<br />

said ‘Road Sale Register’. Particulars of sale order number, category of customer,<br />

quantity & size of coal to be lifted, basic price, sales tax percentage, C Form number if<br />

submitted, coal value paid, validity period etc. should be recorded in that ‘Road Sale<br />

Register’. Thereafter, lifted quantity and balance quantity / amount is to be updated on<br />

day-to-day basis.<br />

(f)The allotment chart prepared by the concerned project officer and duly signed by<br />

committee constituted by concerned Area General Manager consisting of Area Sales<br />

Manager or his representative, Project Officer as its members on weekly / fortnightly<br />

basis and the same should be displayed on the notice board on respective colliery<br />

weighbridge at least one day before the commencement of loading. The allotment<br />

should be limited to coal availability and loadability in the colliery. The liquidation of<br />

coal as per allotment will be the sole responsibility of the Project Officer within the<br />

validity period.<br />

(g)Area Sales Manager should time inspect the weighbridges to ensure proper<br />

maintenance of dispatch register, loading & weighment register, Road Sale challan,<br />

road permit, weighment card / slip etc. The committee should ensure proper adherence<br />

of allotment chart by weighbridges. Maintenance of weighbridge will the job of E&M<br />

Department of the project/Area.<br />

(h)Entry of empty trucks or weighment/loading will commence from 6 AM and continue<br />

upto 2 PM. Trucks reporting for tare weighment will carry loading slip issued by<br />

customer’s authorized representative mentioning the customer’s name, sale order<br />

details, quantity with size/grade, registration number of trucks quantity of coal to be<br />

carried. After checking the loading programme, the truck will be allowed for tare<br />

weighment.<br />

(i)After tare weighment the truck will proceed to colliery along with tare weighment slip<br />

duly signed by authorized weighbridge staff and security personal responsible for<br />

verifying the empty truck, after which the Coal Dispatch supervisor / Clerk will issue<br />

loading slip and thereafter the trucks will be allowed for loading. In case some of the<br />

trucks entered into the colliery premises as per the allotment in a day remains<br />

empty/partially loaded or get breakdown can be allowed to stay in the colliery premises