Vigilance Compedium - CCL
Vigilance Compedium - CCL
Vigilance Compedium - CCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8. A committee must be constituted by the Project Officer, who will determine<br />
periodically the average hourly consumption of diesel in different machines and the<br />
committee must submit report to the Project Officer with copies marked to Area<br />
CGM/GM, SO(Excv)/SO(E&M), for corrective measures. A copy of the ATR in this<br />
regard must be submitted to CGM(Excv).<br />
9. An excavation engineer must be authorized by the Project Officer to examine and<br />
analyze daily consumption of diesel by each HEMM based on quantity of diesel<br />
issued, working hours, trips made and to compare with average consumption as<br />
determined by the committee constituted for the purpose.<br />
You are advised to streamline the procedure, so that the guidelines circulated in this regard<br />
are strictly adhered to.<br />
Encl: As above.<br />
Yours faithfully,<br />
Sd/-<br />
Copy to:-<br />
(T.K. Nag)<br />
Director(Tech/Opns<br />
CMD, <strong>CCL</strong>, Ranchi.<br />
CGM(MM)/CGM(Opns)/CGM(Excv)/GM(E&M)/All Area Depot Officers.<br />
c.c. to:-<br />
Chief <strong>Vigilance</strong> Officer, <strong>CCL</strong>, Ranchi.