Vigilance Compedium - CCL

Vigilance Compedium - CCL Vigilance Compedium - CCL

15.07.2014 Views

Annexure - II DIP REGISTER Date------------------ Colliery ------------------------ Stores------------------------ Position of Daily Physical Measurement Pump No. Totaliser Meter Reading Dip Factor Litres 1. 2. 3. -------------------------- ----------------------------- Ground Balance(Physical) Kardex Balance --------------------- Litres -------------------- Litres ---------------------------- Difference -------------------------- Dip was taken by me today at ……………………. and physical balance of ………………. Litres found in Underground Storage Tanker(s). II. Receipts of Tankers i. ………………………………. ii.………………………………. ( Signatures ) 1 Tanker no……………………………………. 1.Tanker refilled by Oil Comp. on--------- at------ 2 Challan-cum-invoice………………………………………………………………………………………………….. 3 Dated ……………………………………………… 2. Tanker arrived on …………………. at …………… 4 Qnty. as per challan ………………………. 3. Tanker decanted on …………….. at …………….. 5 Quantity as per actual measurement 6 Difference …………………………………………………………………………………………………….. 7 Oil Comp. intimated by letter no……………………………………………………… dt. …………….. Decantation of Tanker Dip as per challan Dip Factor Litres ----------------------- ------------------- ------------------------- --------------------- Actual Challan Difference --------------------- -------------------------- --------------------------- ---------------------------Shortage--------------------------- III. Group Balance …………………………… litres Received today …………………… litres Total ………………….. Litres *Less Kardex Balance …………………… litres Issued during the day ………………………. Litres *This portion should be filled up next day morning with reference to stores records. Signature

CENTRAL COALFIELDS LIMITED DARBHANGA HOUSE:RANCHI No.DIR/OPNS/2010/11/1142 Dated 10.05.2010 To The Area CGM/General Manager, Barka-Saya/Argada/NK/Rajhara/Piparwar/ Rajrappa/Kuju/Hazaribagh/(B&K)/Dhori /Kathara/ BCW Kathara/CRS, Barkakana Dear Sir, Sub: Procedures to be followed at Diesel Dispensing Units in respect of receipt, issue and consumption of diesel. In continuation to this office letter No.Dir(Tech/Opn)/23/04/91 dated 17.01.2004 (copy enclosed for ready reference), on the above subject, it is to further inform that in some of the DDU, some deviations were noticed. It is, therefore, once again advised to implement the guidelines fully circulated vide above referred letter so that following violations are not repeated in future:- 1. Procedure lay down in the store manual concerning receipt and issue of diesel must be followed. 2. There must be entry in the security register in respect of incoming and outgoing tankers. 3. Difference in the issue of diesel as per flow meter and dip reading must be examined and reviewed every day by an authorized executive. 4. Diesel should not be issued without proper requisition. 5. Calibration of dispensing unit pump and metering units as required under statute/store manual must be done as per schedule. 6. Copy of the entries made in the dip register maintained must be submitted daily to Engineer Incharge as well as Project Officer. 7. Committee must be constituted in the areas, if not done earlier, to conduct quarterly check at the DDU and copy of quarterly check report must be sent to the undersigned by Area CGM/GM concerned.

Annexure - II<br />

DIP REGISTER<br />

Date------------------ Colliery ------------------------<br />

Stores------------------------<br />

Position of Daily Physical Measurement<br />

Pump No. Totaliser Meter Reading Dip Factor Litres<br />

1.<br />

2.<br />

3.<br />

-------------------------- -----------------------------<br />

Ground Balance(Physical)<br />

Kardex Balance<br />

--------------------- Litres<br />

-------------------- Litres<br />

----------------------------<br />

Difference --------------------------<br />

Dip was taken by me today at ……………………. and physical balance of ………………. Litres found in<br />

Underground Storage Tanker(s).<br />

II. Receipts of Tankers<br />

i. ……………………………….<br />

ii.……………………………….<br />

( Signatures )<br />

1 Tanker no……………………………………. 1.Tanker refilled by Oil Comp. on--------- at------<br />

2 Challan-cum-invoice…………………………………………………………………………………………………..<br />

3 Dated ……………………………………………… 2. Tanker arrived on …………………. at ……………<br />

4 Qnty. as per challan ………………………. 3. Tanker decanted on …………….. at ……………..<br />

5 Quantity as per actual measurement<br />

6 Difference ……………………………………………………………………………………………………..<br />

7 Oil Comp. intimated by letter no……………………………………………………… dt. ……………..<br />

Decantation of Tanker<br />

Dip as per challan Dip Factor Litres<br />

----------------------- ------------------- ------------------------- ---------------------<br />

Actual<br />

Challan<br />

Difference --------------------- -------------------------- ---------------------------<br />

---------------------------Shortage---------------------------<br />

III. Group Balance …………………………… litres<br />

Received today …………………… litres<br />

Total ………………….. Litres<br />

*Less Kardex Balance …………………… litres<br />

Issued during the day ………………………. Litres<br />

*This portion should be filled up next day morning with reference to stores records.<br />

Signature

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!