PROCEDURE TO BE ADOPTED FOR REPAIRING OF MOTOR AND TRANSFORMER REQIRED FOR APPROVAL OF COMPETENT AUTHORITY 1. A departmental estimate shall be prepared and forwarded to HQ only when the repairing cost of transformer and motor exceeds 15% of the current equipment cost with reason/justification for getting the job done through outside agency. 2. The estimate shall be prepared as per the format given below with complete technical specification of wire, insulation and all other required material. a) Cost of copper winding/strip for Total weight (size of wire shall be given). b) Insulating material cost in % of the cost component of the copper wire/strip c) Labour charges with other incidental charges for small items etc of the cost component of the copper wire/strip d) Less scrap value in % of the cost component of copper wire/strip e) Any other major items The detailed technical specification item wise and reasonability of rates adopted in the estimate with supporting documents may be linked specifically.) Weight (Kg) Rate Rs/Kg Total Value N.B. I. As per the prevailing norms the rates for item (b) & (c) should be taken as 15% of the cost of new copper wire while the scrap value should be taken as 60% of the new copper cost instead of 43.5% as prevailed earlier. II. The rate of new copper wire shall be as per RC for the same prevailing at the time of processing. 3. N.O. certificate from CWS, Barkakana/RWS Bhurkunda having Sl.No. of transformer/motor, showing their inability with reasons for not undertaking the job departmentally. 4. Check list duly signed by all the concerned officials and filled in item wise. 5. The proposal with note sheet shall be submitted for concurrence of Dy CFM(O) and approval of D(T)(O) with full following details: a) Reasonability of rates item wise specifically. b) Percentage repairing cost against the current replacement value. c) Urgency certificate for proposed repairing d) Post expected repaired life of the equipments in years specifically.
e) The fund for repairing shall be suggested by area. If not available in the area, the proposal may be processed with comments that no fund is available at area level and same may be certified by AFM of concerned area. f) The proposal along with estimated amount shall be concurred in by AFM and recommended/approved by CGM of the respective area. g) The rates of the items may be taken uniformally and if there is any variation, the same shall be indicated specifically with reasons of variation in rates. 6. After obtaining the administrative approval from competent authority, the proposal may be processed for other tender formalities as deemed fit at area level as per the contract manual for carrying out such contractual repair jobs, observing all required formalities as per rules and procedures.”
- Page 63 and 64: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Te
- Page 65 and 66: No.OFF-1-CTE-1(Pt) V Government of
- Page 67 and 68: No.005/MSC/25 Government of India C
- Page 69 and 70: No.005/VGL/66 Government of India C
- Page 71 and 72: (iv) (v) As regards the splitting o
- Page 73 and 74: No.005/CRD/19 Government of India C
- Page 75 and 76: No.004/VGL/90 Government of India C
- Page 77 and 78: No.005/VGL/4 Government of India Ce
- Page 79 and 80: No.005/CRD/012 Government of India
- Page 81 and 82: Annexure-1 Check list for examinati
- Page 83 and 84: No.005/CRD/19 Government of India C
- Page 85 and 86: No.02-07-01-CTE-30 Government of In
- Page 87 and 88: No.007/VGL/033 Government of India
- Page 89 and 90: and approval by the Commission as I
- Page 91 and 92: INTERNAL CIRCULARS/ GUIDELINES OF C
- Page 93 and 94: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 95 and 96: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 97 and 98: INTERNAL CIRCULARS/ GUIDELINES OF C
- Page 99 and 100: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 101 and 102: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 103 and 104: Encl: as above. Copy to: 1. DT(O),C
- Page 105 and 106: Coal India Limited VIGILANCE DIVISI
- Page 107 and 108: WIRELESS DT: 01.7.2002 FOR : SO(E&M
- Page 109 and 110: PROCEDURE TO BE ADOPTED FOR REPAIR
- Page 111 and 112: 1. Name of the Project/Colliery 2.
- Page 113: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 117 and 118: 7. At the opening and close of the
- Page 119 and 120: Annexure-I HSD Issue statement with
- Page 121 and 122: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 123 and 124: INTERNAL CIRCULARS/ GUIDELINES OF F
- Page 125 and 126: INTERNAL CIRCULARS/ GUIDELINES OF M
- Page 127 and 128: Government of India Ministry of Coa
- Page 129 and 130: INTERNAL CIRCULARS/ GUIDELINES OF P
- Page 131 and 132: from SC/ST, the roster points to be
- Page 133 and 134: Government of India Ministry of Coa
- Page 135 and 136: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 137 and 138: CENTRAL COALFIELDS LIMITED A Minira
- Page 139 and 140: INTERNAL CIRCULARS/ GUIDELINES OF S
- Page 141 and 142: Proposal seeking approval of draft
- Page 143 and 144: In line with the above, based on th
- Page 145 and 146: are extended on request of the cons
- Page 147 and 148: (d)Sale orders received at the coll
- Page 149 and 150: (o)The party wise/sale order wise
- Page 151 and 152: h) CSC will send a list of un close
- Page 153 and 154: Case Study -01 BRIEF OF ALLEGATION
- Page 155 and 156: Case Study -02 BRIEF OF ALLEGATION
- Page 157 and 158: 2.2 Deficient work order, which was
- Page 159 and 160: • Payment of contractually transp
- Page 161 and 162: Case Study -05 Sub: Purchase of gum
- Page 163 and 164: Case Study -06 Lapses in conduction
e) The fund for repairing shall be suggested by area. If not available in the area, the<br />
proposal may be processed with comments that no fund is available at area level<br />
and same may be certified by AFM of concerned area.<br />
f) The proposal along with estimated amount shall be concurred in by AFM and<br />
recommended/approved by CGM of the respective area.<br />
g) The rates of the items may be taken uniformally and if there is any variation, the<br />
same shall be indicated specifically with reasons of variation in rates.<br />
6. After obtaining the administrative approval from competent authority, the proposal<br />
may be processed for other tender formalities as deemed fit at area level as per the<br />
contract manual for carrying out such contractual repair jobs, observing all required<br />
formalities as per rules and procedures.”