INTERNAL CIRCULARS/ GUIDELINES OF E&M DEPARTMENT CCL A small leak can sink a great ship." - Benjamin Franklin

WIRELESS DT: 01.7.2002 FOR : SO(E&M) ALL AREAS RPT : GM, CWS BARKAKANA RPT : PO RWS BHURKUNDA RPT : DY CE(E&M) GIRIDIH FROM: KK JHA, GM(E&M) INCHARGE, CCL, RANCHI INDSUTRIAL ENGG.DEPTT. HAS DONE A WORK STUDY OF ELECTRICAL REPAIR SHOP CWS BARKAKANA WHEREIN THEY HAVE FOUND THAT THE CAPACITY OF ELECTRICAL REPAIRL SHOP OF CWS BARKAKANA IS AS FOLLOWS: MOTORS - 375 Nos. TRANSFORMERS - 400 KVA & ABOVE – 30 Nos. AC Motors - 90KW & ABOVE - 85 Nos. ALL THE ELECTRICAL REPAIRS OF AREA’S MOTOR AND TRANSFORMERS BELOW 90 KW & BELOW 400 KVA RESPECTIVELY ARE TO BE TAKEN UP BY RWS BHURKUNDA (.) PO RWS WILL ASSESS THE TOTAL CAPACITY WHICH HE CAN UNDERTAKE FOR REPAIR OF TRANSFORMERS AND A.C. MOTORS OF AREAS (.) DY CHIEF ENGINEER(E&M) GIRIDIH WORKSHOP WILL ALSO ASSESS THE ANNUAL CAPACITY OF DIFFERENT WORKS WHICH CAN BE UNDERTAKEN BY THE GIRIDIH WORKSHOP AND PREPARE AN ESTIMATE FOR SUCH REPAIR REGARDING MATERILAS REQUIREMENT ETC. (.) NTT GM(E&M)/Repairing at Trans/02/5355-69 dt 3.7.02 Post confirmation copy to: Sd/- (KK Jha) General Manager(E&M) Incharge 1. SO(E&M), All areas. 2. GM, CWS, Barkakana. 3. PO, RWS, Bhurkunda. 4. Dy CE(E&M), Giridih.

WIRELESS DT: 01.7.2002<br />

FOR : SO(E&M) ALL AREAS<br />

RPT : GM, CWS BARKAKANA<br />

RPT : PO RWS BHURKUNDA<br />

RPT : DY CE(E&M) GIRIDIH<br />

FROM: KK JHA, GM(E&M) INCHARGE, <strong>CCL</strong>, RANCHI<br />

INDSUTRIAL ENGG.DEPTT. HAS DONE A WORK STUDY OF ELECTRICAL REPAIR<br />

SHOP CWS BARKAKANA WHEREIN THEY HAVE FOUND THAT THE CAPACITY<br />

OF ELECTRICAL REPAIRL SHOP OF CWS BARKAKANA IS AS FOLLOWS:<br />

MOTORS - 375 Nos.<br />

TRANSFORMERS - 400 KVA & ABOVE – 30 Nos.<br />

AC Motors - 90KW & ABOVE - 85 Nos.<br />

ALL THE ELECTRICAL REPAIRS OF AREA’S MOTOR AND TRANSFORMERS<br />

BELOW 90 KW & BELOW 400 KVA RESPECTIVELY ARE TO BE TAKEN UP BY<br />

RWS BHURKUNDA (.) PO RWS WILL ASSESS THE TOTAL CAPACITY WHICH HE<br />

CAN UNDERTAKE FOR REPAIR OF TRANSFORMERS AND A.C. MOTORS OF<br />

AREAS (.)<br />

DY CHIEF ENGINEER(E&M) GIRIDIH WORKSHOP WILL ALSO ASSESS THE<br />

ANNUAL CAPACITY OF DIFFERENT WORKS WHICH CAN BE UNDERTAKEN BY<br />

THE GIRIDIH WORKSHOP AND PREPARE AN ESTIMATE FOR SUCH REPAIR<br />

REGARDING MATERILAS REQUIREMENT ETC. (.)<br />

NTT<br />

GM(E&M)/Repairing at Trans/02/5355-69 dt 3.7.02<br />

Post confirmation copy to:<br />

Sd/-<br />

(KK Jha)<br />

General Manager(E&M) Incharge<br />

1. SO(E&M), All areas.<br />

2. GM, CWS, Barkakana.<br />

3. PO, RWS, Bhurkunda.<br />

4. Dy CE(E&M), Giridih.