Trajectory-Based Operations (TBO) - Joint Planning and ...
Trajectory-Based Operations (TBO) - Joint Planning and ...
Trajectory-Based Operations (TBO) - Joint Planning and ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Trajectory</strong>-<strong>Based</strong> <strong>Operations</strong> (<strong>TBO</strong>)<br />
Study Team Report<br />
OI-0366 Dynamic Airspace Performance Designation<br />
OI-0382 Strategic User Requests<br />
OI-0406 NAS Wide Sector Dem<strong>and</strong> Prediction <strong>and</strong> Resource <strong>Planning</strong><br />
OI-2021 Net-Enabled Common Weather Information - Level 2 Adaptive Control/Enhanced<br />
Forecast<br />
17.3 Pre-flight <strong>Planning</strong><br />
This is the phase where the flight object is built for negotiation with the ANSP. During pre-negotiation,<br />
next-day or same-day information is available in multiple planning horizons (time-based information is<br />
available). In pre-negotiation, the objective is to compare user preferences to constraints, flow<br />
contingencies, airspace changes, etc., to generate 4DT choices. These choices become the basis of<br />
building the flight object that now contains the flight plan, preferences, aircraft performance,<br />
constraints to the business trajectory, <strong>and</strong> a rank ordering of these choices.<br />
This automation can be either ANSP provided or commercially provided. The output is a set of flight<br />
objects acceptable to the pilot/operator for each flight segment that can be submitted to the ANSP for<br />
negotiation.<br />
OI-0306 Provide Interactive Flight <strong>Planning</strong> from Anywhere<br />
OI-0346 Improved Management of Airspace for Special Use<br />
OI-0360 Automation-Assisted <strong>Trajectory</strong> Negotiation <strong>and</strong> Conflict Resolution OI-0366 Dynamic<br />
Airspace Performance Designation<br />
OI-0382 Strategic User Requests<br />
OI-0406 NAS Wide Sector Dem<strong>and</strong> Prediction <strong>and</strong> Resource <strong>Planning</strong><br />
OI-0408 Provide Full Flight Plan Constraint Evaluation with Feedback<br />
OI-2021 Net-Enabled Common Weather Information - Level 2 Adaptive Control/Enhanced<br />
Forecast<br />
17.4 ANSP Strategic <strong>TBO</strong> Evaluation<br />
Once choices are submitted to the ANSP, each choice must be compared to all other choices for flights<br />
<strong>and</strong> constraints the ANSP has identified. The ANSP must first examine downstream conflicts, where<br />
one or more choices overlap with each other, where merges would be difficult, or where dem<strong>and</strong><br />
exceeds capacity. Choices are in priority for the individual flight <strong>and</strong> in priority for a group of flights<br />
from a specific airline. Priorities are set up by the airline for that day’s operations <strong>and</strong> aspects of each<br />
operation. The ANSP is looking for a clear path amongst the choices submitted. In absence of a clear<br />
path, recommendations come back to the pilot/operator as to the constraints <strong>and</strong> alternatives.<br />
In the comparison of priorities within an airline for multiple aircraft, the first priority aircraft would be<br />
expected to get its first choice. When there is a conflict with another airline’s first priority, the ANSP<br />
applies an equity algorithm to distribute selections against multiple sets of priorities.<br />
Priorities can change as the day progresses, so there is always a need for multiple evaluations as the<br />
day progresses, but once the aircraft pushes back, fuel loading precludes wholesale changes between<br />
desired business trajectories.<br />
<strong>Joint</strong> <strong>Planning</strong> <strong>and</strong> Development Office<br />
78