13.07.2014 Views

Trajectory-Based Operations (TBO) - Joint Planning and ...

Trajectory-Based Operations (TBO) - Joint Planning and ...

Trajectory-Based Operations (TBO) - Joint Planning and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Trajectory</strong>-<strong>Based</strong> <strong>Operations</strong> (<strong>TBO</strong>)<br />

Study Team Report<br />

Figure 10: IAD Arrivals<br />

As Sunset 123 approaches the arrival meter point, the ANSP assigns airborne merging <strong>and</strong> spacing<br />

responsibility behind Ariba 122. Transcon 1324 is assigned responsibility for airborne merging <strong>and</strong><br />

spacing with respect to Sunset 123 to arrive with appropriate spacing at the initial coupling point for<br />

the VCSPR operation.<br />

<strong>Joint</strong> <strong>Planning</strong> <strong>and</strong> Development Office<br />

56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!