Trajectory-Based Operations (TBO) - Joint Planning and ...
Trajectory-Based Operations (TBO) - Joint Planning and ...
Trajectory-Based Operations (TBO) - Joint Planning and ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Trajectory</strong>-<strong>Based</strong> <strong>Operations</strong> (<strong>TBO</strong>)<br />
Study Team Report<br />
Figure 9. DTW Surface Layout<br />
14.2 Detroit Takeoff <strong>and</strong> Climb<br />
Transcon 1324 is departing on RWY 4R <strong>and</strong> will be conducting an RNP 0.3 dynamic OPC. This will<br />
be negotiated between DTW Departure <strong>and</strong> Transcon dispatch after pushback, when the aircraft’s<br />
actual takeoff weight (final PAX <strong>and</strong> fuel on board) <strong>and</strong> performance is confirmed. Departure/Arrival<br />
<strong>TBO</strong> automation provides OPCs that are separated from arrival <strong>and</strong> other departure flows, <strong>and</strong><br />
provides an efficient climb for Transcon directed towards its destination. Most importantly, knowledge<br />
of the actual aircraft weight <strong>and</strong> climb trajectory allows the time-to-climb to be calculated so the<br />
takeoff time can be set to allow the aircraft entry into congested en route flow towards IAD. Since<br />
DTW’s airspace is very congested at peak times of day, climb <strong>and</strong> descent profiles for even the most<br />
equipped aircraft remain within the airspace reserved for one of the published procedures, <strong>and</strong> tailored<br />
procedures outside the boundaries of a published procedure are permitted only during off-peak times.<br />
However, Transcon’s dispatch has requested priority h<strong>and</strong>ling at DTW to meet “turn” requirements at<br />
IAD for a continuing flight on to Europe, <strong>and</strong> has agreed to perform an in-trail following application<br />
<strong>Joint</strong> <strong>Planning</strong> <strong>and</strong> Development Office<br />
51