13.07.2014 Views

Trajectory-Based Operations (TBO) - Joint Planning and ...

Trajectory-Based Operations (TBO) - Joint Planning and ...

Trajectory-Based Operations (TBO) - Joint Planning and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Trajectory</strong>-<strong>Based</strong> <strong>Operations</strong> (<strong>TBO</strong>)<br />

Study Team Report<br />

13.5 Surface Movement – Taxi In<br />

Upon completion of its PHX-MIA leg, the last revision of the taxi plan is uplinked to Sunset 42 just<br />

before touchdown. Northeast 416 touches down on RWY 9 <strong>and</strong> then Winds Air 134 touches down.<br />

Both aircraft elect to use their onboard automatic braking systems. Each aircraft slows <strong>and</strong> takes its<br />

assigned high-speed runway exit. At touchdown, the navigation display for both Northeast 416 <strong>and</strong><br />

Winds Air 134 automatically changes to a taxi-map surface display, showing the assigned runway exit.<br />

Sunset 42 then touches down on RWY 9 <strong>and</strong> follows surface guidance to the gate. The <strong>TBO</strong> surface<br />

movement system updates the taxi route on exit for Sunset 42.<br />

14.0 Detroit To Dulles Scenario<br />

Figure 8. MIA Surface Layout<br />

14.1 Surface Movement<br />

The Surface Automation monitors <strong>and</strong> updates schedules as events occur, including late or missed<br />

events 18 . The Flight Data (FD) <strong>and</strong> Clearance Delivery (CD) function then sends the departure<br />

18<br />

The sequence of departure is continuously updated as information becomes available on the readiness<br />

of aircraft to leave the gate, any delays being experienced in taxi, <strong>and</strong> special h<strong>and</strong>ling <strong>and</strong> priority<br />

information. In the far-term, surface radar will be replaced at ASDE sites with a multilateration/ADS-B<br />

system referred to as the Airport Surface Surveillance Capability (ASSC) <strong>and</strong> will be renamed the<br />

Terminal Surface Multilateration System (TSMS).<br />

<strong>Joint</strong> <strong>Planning</strong> <strong>and</strong> Development Office<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!