Sl.<br />

Description of items of work Qnty. Unit Rate in Fig. Rate in Words Amount<br />

No.<br />

1 2 3 4 5 6 7<br />

A9 Scraping, brushing and cleaning the 2310.99 Sqm<br />

metalled surface and laying 20mm thick<br />

premix carpet using 0.27 cum of<br />

13.2mm to 5.6mm size crusher broken<br />

hard granite stone chips of approved<br />

quality & from approved quarry and<br />

14.60 Kg of penetration grade bitumen<br />

(60/70) for 10 sqm, conveying chips<br />

from stacks, and feeding into Hot Mix<br />

Plant, heating bitumen, conveying hot<br />

binder for precoated chips of required<br />

quantities to ensure thorough precoating,<br />

conveying pre-coated chips<br />

from the mixer and laying the same on<br />

the road surface including hand packing<br />

to proper grade, camber / super<br />

elevation and rolling with PRR including<br />

hire & running charges of PRR, Hot Mix<br />

Plant and Tar boiler, cost, conveyance,<br />

royalties, taxes of all material,cost of<br />

labour, T&P ,Sundries etc. complete and<br />

in accordance with clause 511 of<br />

Specification for Road &Bridge work of<br />

MORT&H (4th Revision) & direction of<br />

Engineer in charge.<br />

A10 Providing 6mm thick pre-coated seal 2310.99 Sqm<br />

coat Type-B after scraping, cleaning,<br />

removing dust and other foreign<br />

materials from the road surface, using<br />

0.06 cum of 6.7mm size crusher broken<br />

hard granite stone chips and down<br />

graded as per sieve analysis and 6.80 Kg.<br />

of penetration grade (60/70) bitumen<br />

for 10 sqm area of road surface including<br />

conveying chips from stacks ,feeding<br />

into tar boiler in required quantities<br />

heating bitumen, conveying hot binder<br />

for precoated chips in required<br />

quantities to ensure thorough sealcoating,<br />

conveying precoated chips<br />

from the mixer , laying the same on the<br />

road including hand packing to proper<br />

grade, camber and rolling with P.R.R<br />

and sand blinding 6mm thick including<br />

hire, running charges of P.R.R, Tar<br />

boiler, Hot Mix Plant, cost, conveyance,<br />

royalties, taxes of all material, cost of<br />

labour, T&P ,Sundries etc. complete and<br />

in accordance with clause 513 of<br />

Specification for Road & Bridge work of<br />

MORT&H (4th Revision) & direction of<br />

Engineer in charge.<br />