Sl.<br />
Description of items of work Qnty. Unit Rate in Fig. Rate in Words Amount<br />
No.<br />
1 2 3 4 5 6 7<br />
A9 Scraping, brushing and cleaning the 2310.99 Sqm<br />
metalled surface and laying 20mm thick<br />
premix carpet using 0.27 cum of<br />
13.2mm to 5.6mm size crusher broken<br />
hard granite stone chips of approved<br />
quality & from approved quarry and<br />
14.60 Kg of penetration grade bitumen<br />
(60/70) for 10 sqm, conveying chips<br />
from stacks, and feeding into Hot Mix<br />
Plant, heating bitumen, conveying hot<br />
binder for precoated chips of required<br />
quantities to ensure thorough precoating,<br />
conveying pre-coated chips<br />
from the mixer and laying the same on<br />
the road surface including hand packing<br />
to proper grade, camber / super<br />
elevation and rolling with PRR including<br />
hire & running charges of PRR, Hot Mix<br />
Plant and Tar boiler, cost, conveyance,<br />
royalties, taxes of all material,cost of<br />
labour, T&P ,Sundries etc. complete and<br />
in accordance with clause 511 of<br />
Specification for Road &Bridge work of<br />
MORT&H (4th Revision) & direction of<br />
Engineer in charge.<br />
A10 Providing 6mm thick pre-coated seal 2310.99 Sqm<br />
coat Type-B after scraping, cleaning,<br />
removing dust and other foreign<br />
materials from the road surface, using<br />
0.06 cum of 6.7mm size crusher broken<br />
hard granite stone chips and down<br />
graded as per sieve analysis and 6.80 Kg.<br />
of penetration grade (60/70) bitumen<br />
for 10 sqm area of road surface including<br />
conveying chips from stacks ,feeding<br />
into tar boiler in required quantities<br />
heating bitumen, conveying hot binder<br />
for precoated chips in required<br />
quantities to ensure thorough sealcoating,<br />
conveying precoated chips<br />
from the mixer , laying the same on the<br />
road including hand packing to proper<br />
grade, camber and rolling with P.R.R<br />
and sand blinding 6mm thick including<br />
hire, running charges of P.R.R, Tar<br />
boiler, Hot Mix Plant, cost, conveyance,<br />
royalties, taxes of all material, cost of<br />
labour, T&P ,Sundries etc. complete and<br />
in accordance with clause 513 of<br />
Specification for Road & Bridge work of<br />
MORT&H (4th Revision) & direction of<br />
Engineer in charge.<br />
83