TENDER SCHEDULE<br />

CONSTRUCTION OF PROPOSED TESTING TRACK AND TRACK PERIPHERY ROAD OF<br />

M.V.I OFFICE AT CHANDRASEKHARPUR FOR R.T.O BHUBANESWAR<br />

Sl.<br />

Description of items of work Qnty. Unit Rate in Fig. Rate in Words Amount<br />

No.<br />

1 2 3 4 5 6 7<br />

A1 Earth work in excavation in hard soil or 693.30 Cum<br />

gravelly soil in foundation/drain/berm<br />

including dressing the sides & levelling<br />

the bed and laying in layers in road not<br />

exceeding 0.3 mtr in depth and breaking<br />

clods to maximum 5cm to 7cm within<br />

initial lead of 50mt. and initial lift of<br />

1.5mt. with all labour,T&P etc complete<br />

and in accordance to clause 301.of<br />

Specification for Road & Bridge work of<br />

MORT&H (4th Revision) & direction of<br />

Engineer in charge.<br />

A2<br />

Providing & laying drainage layer not<br />

exceeding 150mm thick using coarse<br />

river sand including watering,<br />

compacting in PRR in layers including<br />

cost, conveyance, royalties, taxes of all<br />

materials, cost of labour, T&P, hire &<br />

running charges of PRR etc. complete<br />

and in accordance to clause 404.3.2 of<br />

Specification for Road & Bridge work of<br />

MORT&H (4th Revision) & direction of<br />

Engineer in charge.<br />

346.65 Cum<br />

A3 Providing & laying sub-base not<br />

exceeding 100mm thick using stone<br />

screened dust of approved quality &<br />

from approved quarry including<br />

watering & compacting to required<br />

density in OMC, rolling with PRR<br />

including cost, conveyance, royalties, tax<br />

of all materials, cost of labour,<br />

T&P,hire & running charges of PRR etc.<br />

complete and in accordance with clause<br />

404.3.2 of Specification for Road &<br />

Bridge work of MORT&H (4th Revision)<br />

& direction of Engineer in charge.<br />

346.65 Cum<br />

80