SPECIAL TERMS & CONDITIONS FOR SAFETY MEASURES<br />
1. The Contractor shall barricade all openings near his work place properly.<br />
2. The Contractor should use sand materials for staging and shuttering work. It should be strong enough to<br />
take the load. If staging and shuttering work are to be executed on filled up area, care should be taken to<br />
see that the filed up earth/sand are properly rammed.<br />
3. The Contractor shall provide temporary handrails to al staircases for use by the workers and supervising<br />
officers.<br />
4. The temporary staircases made during concreting should be strong enough for movement of workers with<br />
materials.<br />
5. During de-shuttering operation suitable care should be taken so that the shuttering materials will not fall on<br />
any body.<br />
6. All external and internal scaffolding works for plastering, painting etc. are to be done properly. Safety belts<br />
should be used by the worker while working.<br />
7. Any other safety measures that may be required during construction should also be taken in addition to the<br />
measures mentioned above.<br />
8. The Contractor should have one First Aid Box at the site to provide First Aid to the workers.<br />
9. Suitable steps should be taken for any fire during execution of work either from direct fire or from electric<br />
fire.<br />
10. Suitable lighting arrangement should be made during execution of the work.<br />
11. Reinforcement and other materials should be properly kept so that they do not interfere in execution of<br />
work.<br />
12. The Contractor shall not keep any labour inside the incomplete building during construction.<br />
13. Temporary electric lines should be properly drawn and all labour should be instructed to be careful while<br />
using the same.<br />
14. Safety helmets should be used by the worker and supervision during execution of the work.<br />
15. No overhead lines should be erected while doing reinforcement on concreting works.<br />
16. Before locking of any room it should be checked by the watchman if any workers are inside.<br />
17. ESI insurance should be obtained for the labourers by the Contractor against any accident.<br />
18. Special Pre-caution for operational control for the construction sites as per functional procedure of ISO-<br />
14001.<br />
(a) The approach to the construction site is accessible and relatively free for plying of materials,<br />
transport vehicles as well as vehicle of workers/ supervisors and inspecting officials.<br />
(b) During dry weather, regular sprinkling of water is done in the construction areas to ensure control of<br />
suspended particles like dust etc.<br />
(c) The construction materials like bricks/ laterite stone/ metal/ chips/ steel rods/ sand etc. are stacked/<br />
stored in proper manner in identified locations. Cement is stored in a proper shed as per BIS Code.<br />
(d) Construction water/ seepage water is properly drained out to avoid water logging in the construction<br />
areas.<br />