9. All centering/ shuttering and scaffolding shall be of steel materials of approved quality and confirming to<br />

relevant BIS specification. Use of timber in the Centering/ shuttering shall not be permitted except where<br />

essentially required and unavoidable.<br />

In any case the centering, shuttering work shall be rigid smooth and leak proof so that the resulting concrete<br />

members are free from undulations, honey combs and are true to size.<br />

10. All concrete structure will be exposed smooth. However, where the columns, beams, ceilings and RC walls<br />

are actually plastered, the same shall be done in approved proportion of cement mortar and payment shall be<br />

made for such plastering actually done at the quoted rate for such item in the contract.<br />

11. It is the Contractor’s responsibility to correctly demarcate the layout and orientation of the building and<br />

fixation of the level pillars at site by his own technical staff as directed by Corporation.<br />

All expenditure in connection with tool and plants instrument materials etc., required in connection with<br />

demarcation of layout including minor levelling the ground, fixation of level, bench marks and centre line etc.,<br />

shall be borne by the Contractor.<br />

12. The Contractor before any casting of RCC works/ plastering works/ flooring work shall obtain the services/<br />

clearance from the Officer authorized by the Corporation.<br />

13. Dewatering of foundations where necessary shall be borne by the Contractor.<br />

14. As regards extra items of work, extra quantity of any item in excess of the schedule, order must be obtained<br />

from the Corporation and in such cases; the matter shall be dealt as per provision of Clause-11 of the<br />

Contract.<br />

15. The Contractor shall be responsible for any accident to any person and shall have to bear the cost of all<br />

litigation arising out of any such accident and also for the payment of any money, damages or compensation<br />

payable in respect of such accident to any person, employed by him for the work in any capacity whatsoever.<br />

16. The Contractor shall submit to the Authorized Officer of the Corporation monthly return of labour both skilled<br />

and unskilled employed by him on the work.<br />

17. No monetary compensation shall be entertained on account of natural calamities like cyclone, earthquake<br />

and flood etc., but suitable extension of time may be granted by the Corporation on consideration of the<br />

application of the Contractor.<br />

18. Provisional deduction towards Sales Tax and Income Tax shall be made from each and every bill of the<br />

Contractor.<br />

19. The rates quoted by the Contractor shall be inclusive of transportation, carriage, lead, loading, unloading al<br />

taxes, levy, octroi etc. including contract of the State Government and Excise duties. In the event of variation<br />

on the above taxes, levies, duties etc. rates shall not be changed.<br />

20. If the Contractor removes any Corporation materials or stock supplied to him from the site of work with a<br />

view to dispose off the same dishonestly, he shall, in addition to any other liabilities Civil or Criminal arising<br />

out of the contract be liable to pay a penalty equivalent to five times the price of the materials on stock,<br />

accounting to the stipulated rate and the penalty so imposed shall be recovered from any sum that may then<br />

or at any time thereafter become due to the Contractor or from his security deposit or the proceeds of sale<br />

thereof<br />

74