12.07.2014 Views

BID DOCUMENT - IDCO

BID DOCUMENT - IDCO

BID DOCUMENT - IDCO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

14. The work of plumbing and drainage shall be carried out by skilled plumbers in line and level as instructed<br />

and as per good engineering practice.<br />

15. The holes in walls, RCC members, etc. shall be made very carefully after prior permission of the authorized<br />

officer of the Corporation before laying necessary pipe lines and the same shall be made good as per the<br />

surrounding surface without any extra cost, as per the satisfaction of the authorized officer.<br />

16. The Corporation can omit or add item. Any extra item of to be carried out, the rate for the same shall be<br />

decided by the Authorized Officer of the Corporation.<br />

17. All the fittings of external pipes and sanitary ware shall be fitted in such a way that they shall be absolutely<br />

watertight.<br />

18. All the fittings and fixtures shall be of I.S.I/ Approved make.<br />

Authorized Officer<br />

<strong>IDCO</strong><br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!