7. All the measurement shall be jointly taken by Contractor’s representative and Engineer-in-charge of the<br />
work at site and they shall be jointly signed. Any dispute arising out of this shall be referred to the<br />
Authorized Officer’s of the Corporation and his decision shall be binding on both the parties.<br />
8. Purchase vouchers of materials in original shall be produced for verification on demand by the Authorized<br />
Officer of the Corporation. Carriage or transport charges shall not be considered for the purpose of this<br />
payment.<br />
9. Any deviation between specifications, schedule of quantities and drawings found by the Contractor, the<br />
same shall be brought to the notice of the Authorized Officer of the Corporation immediately.<br />
10. Rates shall be quoted both in figures and in words in clear legible writing. No overwriting is allowed. All<br />
scoring and cancellation should be countersigned by the Tenderer. In case of illegibility, the interpretation,<br />
the decision of the Engineer-in-charge of work shall be final. All entries shall be in English Language. In<br />
case if on check there are differences between the rates given by the bidder in words and figures or in the<br />
amounts worked out by him, the following procedure should be followed.<br />
(iv)<br />
(v)<br />
(vi)<br />
When there is difference between the rates in figures and in words, the rates which correspond to the<br />
amount worked out by the bidder shall be taken as correct.<br />
When the amount of an item is not worked out by the bidder or it does not correspond with the rate<br />
retain either in figures or words, then rate quoted by the bidder in words shall be taken as correct.<br />
When the rate quoted by the bidder in figures and in words tallies but the amount is not worked out<br />
correctly, the rates quoted by the bidder shall be taken as correct and not the amount.<br />
11. In case of doubt regarding the meaning and scope of specifications of different items of works and in case<br />
of variation in the provisions of IS Specification, National Building Code and Orissa Details Standard<br />
Specification and I.R.C., MOS&T specification, the decision of the Managing Director, <strong>IDCO</strong> will be final and<br />
binding, and no extra claim over and above the accepted agreement, rules will be payable to the Contractor<br />
on this account.<br />
12. The Contractor shall carry out the electrical, sanitary and water supply through the agency as approved by<br />
the Corporation whose name shall be submitted to the authorized officer for approval. All works carried out<br />
shall comply with Rules, Bye-laws, regulations in force. All testing fees for materials as required shall be<br />
borne by the Contractor only.<br />
13. All formalities such as obtaining approvals for water supply, drainage and fire fighting installations, getting<br />
the works inspected or tested in the presence of concerned officials obtaining completion certificates for the<br />
installation and final connection of water supply and drainage for the building shall be the responsibility of<br />
the Contractor and no extra payment shall be payable to the Contractor on this account.<br />