(b) The length width and depths of all excavations shall be sufficient to provide for the necessary working<br />
space shuttering and any other temporary structures required during construction of all excavations shall be<br />
measured net and neither allowance shall made for the extra space for working etc. nor for the increase in bulk<br />
after excavation.<br />
(c) Any excavation including excavation in rock made in error below the level shown on the drawings or below<br />
the levels ordered by the engineer will not be paid for and shall be brought back to the specified levels with<br />
mass concrete at the contractor’s own expense.<br />
(d)<br />
(e)<br />
Where indicated the excavation shall be out to slopes the cost of which be included in the rates.<br />
No concrete or screed shall be placed in any excavation without the prior approval of the Engineer.<br />
(f) Mechanical excavation shall not be carried down to within less than 15 cm. above the required formation<br />
level the last 15cm will be removed by hand. If required by the engineer this 15 cm. shall not be removed until<br />
immediately before concreting takes place.<br />
1.02 REMOVAL OF UNSUITABLE MATERIALS<br />
Where unsuitable materials in encountered at the exposed formation level in excavations or immediately there<br />
under it shall be excavated to such levels as the engineer shall direct. The resultant excavations shall be back<br />
filled with selected materials deposited and compacted in layers of 15 cm as directed by the engineer. Such<br />
excavations shall be measured in accordance with the relevant item in the bill.<br />
1.03 TEMPORARY DRAINAGE AND TIMBERING<br />
(a) During the whole time that the excavations are open they shall be kept dry. The contractor shall construct<br />
temporary drains and bunds to prevent the entry of surface water excavate and maintain all drains bunds and<br />
provide and operated all pumps necessary to collect and remove all water, which enters into the excavations.<br />
(b) The contractors shall be solely responsible for the safety and stability of the excavations. He shall at his<br />
own cost slope the sides of the excavations or provide timber supports built and secured to the satisfaction of<br />
the engineer in order to prevent the occurrence of subsidence or slips.<br />
(c) The contractor shall at his own cost promptly provide and maintain any temporary drainage or other<br />
protective measures required by the engineer. Compliance with the engineer’s instructions in this respect shall<br />
not however relieve him of his sole responsibility for the stability of the excavations on site.<br />
1.03.1 DISPOSAL OF SOIL<br />
(a)<br />
Spoils from the site shall be disposed off within the areas as directed by the engineer.<br />
(b) Under no circumstances shall the spoils from the site be sold or given away to any unauthorized party for<br />
any consideration.<br />
1.04 EARTH FILLING IN PLINTH<br />
Fill material should be well-graded natural inorganic soil approved by the engineer and meeting the following<br />
requirements<br />
(a) It shall be free of organic or other weak or compressible materials and be of such nature and character<br />
that it can be compacted to the specified density on a reasonable length of time.<br />
(b) It shall be free of highly plastic clay or all materials subject to decay, decomposition or dissolution and<br />
corrosion etc.<br />
(c)<br />
It shall have a maximum dry density of not less than 1590 Kg. Per cubic meters<br />
(d) It should have liquid limit of 35 to 40% and P.I. value of 5 to 7<br />
(e)<br />
Earth available from trench cutting any also be utilized for filling plinth if it meets the above requirements.<br />
(f) The work under plinth or any places to make up level with sand having FM not less than 0.8<br />
(g) Earth shall be filled in plinth in 15cm. Layers and in each shall be compacted to the entire satisfaction of<br />
the engineer by vibration roller/power hammer at optimum moisture contents. The contractor shall be very<br />
careful regarding foundation walls/columns so that no harm is done during ramming.<br />