The contractor shall provide at his own expense for any temporary access he may require from the<br />

existing road to the work and for the adjacent storage and working areas.<br />

The contractor shall make his own arrangement for the use of private roads or for way leave across<br />

private land and shall indemnify the owner against any claims arising from his use of these access roads.<br />

The contractor shall ensure that no unnecessary inconvenience is caused to the public or the users of<br />

any roads during the progress of the works.<br />

The contractor shall arrange for the conveyance of material plant etc. so as to cause a minimum of<br />

damage to existing roads. The contractor shall be responsible for any damage caused by his lorries or workmen<br />

to any existing roads culverts etc. from whatsoever original conditions to the satisfaction of the Engineer or<br />

alternatively shall bear the cost such maintenance and restoration as a deduction from money due or to become<br />

due to the contractor under this contract.<br />

WATCHING AND LIGHTING<br />

The contractor shall provide and maintain all notices, fencing by C.I. sheet or other approved means watching<br />

and lighting necessary to ensure security of the works the materials and tools stored on site and to protect from<br />

injury all persons who have access to the site.<br />

BOUNDARY STONES AND EXISTING UNDERGROUND SERVICES.<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

The contractor’s attention is specially drawn to the following responsibilities.<br />

Before commencing any excavations for the purpose of carrying out work under this contract the<br />

contractor or his representative shall accompany the engineer on a site inspection in order to consider any<br />

circumstances which may indicate the presence of boundary stones survey works underground cables water or<br />

other services pipes at or ion the vicinity of such excavations in such manner and sequence as the Engineer<br />

directs.<br />

If during excavations the contractor workmen uncover any cable water or other service pipes he report<br />

the matter to the engineer and all excavation which might endanger the service concerned shall be stopped<br />

until the engineer’s instructions are received as to the manner in which the work shall be continued.<br />

The cost of deviating or realigning these services shall not be borne by the contractor but he shall provide<br />

and maintain at his own cost any temporary works necessary to support or protect the services affected by his<br />

excavations to the satisfaction of the authorities concerned.<br />

The contractor shall attend upon the authorities concerned and afford them all facilities necessary to<br />

enable them to undertake any work required to deviate these services or to prevent interruption of such services<br />

during the progress of the contract.<br />

TEMPORARY BUILDING<br />

(a)<br />

(b)<br />

(c)<br />

The contractor shall construct and maintain temporary building to the satisfaction of the engineer and<br />

shall comply with the requirements of the Local Authorities. Moreover the building shall be protected against<br />

weather dust insects’ noise and other nuisance to the satisfaction of the Engineer.<br />

The building should be 10” brickwork C.I. sheet roofing and protective ceiling made of hardboard and<br />

timber as per approval of the engineer. The floor finish will be a layer brick patent stone and neat cement finish.<br />

Foundation of the building shall be to the approval of the Engineer.<br />

WATER SUPPLY<br />

The contractor shall keep the site clean and free from rubbish at all times.<br />

The contractor shall provide at his own cost pumps storage tanks and or everything necessary for an adequate<br />

supply of water from an approved source on the site for concreting and general use.<br />

PERMISSION FROM LOCAL AUTHORITIES<br />

The contractor shall be responsible for obtaining all the necessary permits from the local authorities for any of<br />

the work to be carried out under this contract. The contractor shall also be responsible for observing the<br />

current immigration regulations and for obtaining work permits for his staff where required. All costs incurred<br />

in this connection shall be included in the tendered rate.<br />