1. Validity of Offer :<br />

2. Scope of Supply :<br />

3. Measurement of<br />

reinforcement steel<br />

4. Testing<br />

:<br />

GENERAL CONDITION<br />

The tender submitted by the tenderer shall remain valid for<br />

acceptance for a period of 120days (One hundred twenty) days from<br />

the date of opening of tender.<br />

Supply of Cement, Steel and Bitumen shall be the responsibility of<br />

the contractor and the same will be used in the construction after<br />

getting the test certificate, approval by the Divisional Head, <strong>IDCO</strong>.<br />

Measurement of reinforcement steel will be done as per ISI standard<br />

weight. Nothing extra will be paid for rolling margin.<br />

All cost of mandatory testing of bricks, chips, sand, concrete cubes,<br />

metals compaction, Moorum compaction, GSB compaction, WMM<br />

compaction, Mix Seal Surfacing testing and other construction<br />

materials etc will be borne by the Contractor.<br />

5. Agreement On acceptance of tender, the successful tenderer will have to<br />

6.<br />

7.<br />

8.<br />

9.<br />

10<br />

(Total ten numbers)<br />

execute agreement with latest addition and alternation made till the<br />

date of opening of the tender paper in non-judicial stamp paper of<br />

Rs.100.00 (Rupees one hundred) only and six cartridge papers,<br />

which is to be given by the tenderer to the Divisional Head of <strong>IDCO</strong>.<br />

The Contractor shall have to arrange water and power him self so as<br />

to execute the work as per time schedule. Nothing extra will be paid<br />

on this account.<br />

The Contractor has to make his own arrangement for approach road<br />

to the work site.<br />

The consumption of cement will be calculated as per Government of<br />

Orissa Analysis of Rate.<br />

The Contractor has to make his own arrangement for keeping<br />

cement in his store. Watch and ward is to be maintained by the<br />

Contractor.<br />

The Engineer-in-charge or his representative reserves the right to<br />

check the store at any time. The Contractor has to maintain a proper<br />

stock book showing daily consumption and balance etc.<br />

15