NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) NORTH – SOUTH CORRIDOR PROJECT CONTRACT PACKAGE NO – 29 (MH) CONSTRUCTION OF FOUR LANE ROAD OVER BRIDGE (Km.22.850 to Km.24.650) INCLUDING APPROACHES AT BUTIBORI ON NAGPUR – HYDERABAD SECTION OF NH-7 IN LIEU OF EXISTING LEVEL CROSSING NO. 113 IN THE STATE OF MAHARASHTRA BID DOCUMENT - ITEM RATE CONTRACT NATIONAL COMPETITIVE BIDDING VOLUME -III G-5 & 6, Sector-10, Dwarka New Delhi-1100045
- Page 2 and 3: September 2002 NATIONAL HIGHWAYS AU
- Page 4 and 5: SECTION - 6 CONTRACTOR’S BID
- Page 6 and 7: 2. We undertake, if our Bid is acce
- Page 8 and 9: 9. Errors will be corrected by the
- Page 10: SECTION - 7 BILL OF QUANTITIES
- Page 13 and 14: FORM OF BANK GUARANTEE FOR BID SECU
- Page 15 and 16: New Delhi - 110045. Gentlemen: In a
- Page 17 and 18: Issue of Notice to proceed with the
- Page 19: i) Letter of Acceptance; ii) Notice
NATIONAL HIGHWAYS AUTHORITY OF INDIA<br />
(Ministry <strong>of</strong> Road Transport & <strong>Highways</strong>)<br />
NORTH – SOUTH CORRIDOR PROJECT<br />
CONTRACT PACKAGE NO – 29 (MH)<br />
CONSTRUCTION OF FOUR LANE ROAD OVER BRIDGE<br />
(Km.22.850 to Km.24.650) INCLUDING APPROACHES<br />
AT BUTIBORI ON NAGPUR – HYDERABAD SECTION OF<br />
NH-7 IN LIEU OF EXISTING LEVEL CROSSING NO. 113 IN THE<br />
STATE OF MAHARASHTRA<br />
BID DOCUMENT - ITEM RATE CONTRACT<br />
NATIONAL COMPETITIVE BIDDING<br />
VOLUME -<strong>III</strong><br />
G-5 & 6, Sector-10, Dwarka<br />
New Delhi-1100045
September 2002<br />
NATIONAL HIGHWAYS AUTHORITY OF INDIA<br />
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS)<br />
NORTH – SOUTH CORRIDOR PROJECT<br />
CONTRACT PACKAGE NO – 29 (MH)<br />
CONSTRUCTION OF FOUR LANE ROAD OVER BRIDGE<br />
(Km.22.850 to Km.24.650) INCLUDING APPROACHES<br />
AT BUTIBORI ON NAGPUR – HYDERABAD SECTION OF<br />
NH-7 IN LIEU OF EXISTING LEVEL CROSSING NO. 113 IN THE<br />
STATE OF MAHARASHTRA<br />
BID DOCUMENT - ITEM RATE CONTRACT<br />
VOLUME -<strong>III</strong><br />
CONTENTS<br />
NO.<br />
SECTION PARTICULARS PAGE<br />
6. CONTRACTOR’S BID 6-1<br />
7. BILL OF QUANTITIES 7-1 to 7-<br />
31
8. FORMS 8-1 to 8-8
SECTION - 6<br />
CONTRACTOR’S BID
CONTRACTOR’S BID<br />
To<br />
Chairman<br />
<strong>National</strong> Highway <strong>Authority</strong> <strong>of</strong> <strong>India</strong><br />
NHAI, G-5, G-6, Sector – 10, Dwarka<br />
New Delhi – 110045<br />
Dear Sir,<br />
Having examined the Bid Documents including Invitation for Bid, Instruction <strong>of</strong> Bidders,<br />
Conditions <strong>of</strong> Contracts, Contract Data, Technical Specifications, Bill <strong>of</strong> Quantities, Drawings,<br />
Forms and Annexes for the execution <strong>of</strong> the above named works, we the undersigned, <strong>of</strong>fer to<br />
execute and complete such works and remedy any defects therein in conformity with the said<br />
Bid Documents for the sum <strong>of</strong> <strong>India</strong>n Rs. ___________________ (Rupe7es<br />
___________________) or such other sum as may be ascertained in accordance with the said<br />
Bid Docume nts.
2. We undertake, if our Bid is accepted, to commence the works within twenty one days <strong>of</strong> receipt<br />
<strong>of</strong> the Engineer’s order to commence, and to complete and deliver the sections and whole <strong>of</strong> the<br />
works comprised in the Contract within the period stated in the Contract Data.<br />
3. If our Bid is accepted we will furnish a Performance Security in the form <strong>of</strong> bank guarantee to be<br />
bound on us, in accordance with the Conditions <strong>of</strong> Contract.<br />
4. We agree to abide by this Bid for the period <strong>of</strong> sixty (60) days from the date <strong>of</strong> Bid Opening, as<br />
prescribed in Clause 15 <strong>of</strong> the Instruction to Bidders, and it shall remain binding upon us and may<br />
be accepted at any time before the expiry <strong>of</strong> that period.<br />
5. Unless and unit an Agreement is prepared and executed, this Bid, together with your written<br />
acceptance there<strong>of</strong>, shall constitute a binding Contract between us but without prejudice to your<br />
right to withdraw such Acceptance under the provisions <strong>of</strong> the Conditions <strong>of</strong> Contract.<br />
6. We understand that you are not bound to accept to lowest or any Bid you may receive.<br />
Dated this __________________ day <strong>of</strong> _______________ 2001.<br />
Signature _________________ in the capacity <strong>of</strong> ** ____________ duly authorised to sign Bid for<br />
and<br />
on behalf <strong>of</strong> _______________________________<br />
(in block capitals)<br />
Address ____________________________________________________________________<br />
Address <strong>of</strong> Witness ___________________________________________________________<br />
Signature <strong>of</strong> Witness ______________________________<br />
** Certified copy <strong>of</strong> the Power <strong>of</strong> Attorney / authorisation for signature shall be furnished by the<br />
Contractor, in accordance with Clause 4.2 (iv) <strong>of</strong> Instruction to Bidders.<br />
6 - 1
SECTION 7<br />
BILL OF QUANTITIES<br />
A.PREAMBLE<br />
1. The Bill <strong>of</strong> Quantities shall be read in conjunction with the Instruction to Bidders,<br />
Conditions <strong>of</strong> Contract, Technical Specification, Drawings, Schedule, Annexure and<br />
Addendums.<br />
2. The quantities given in the Bill <strong>of</strong> Quantities are estimated and provisional and are given<br />
to provide a common basis for bidding. The basis payment will be actual quantities <strong>of</strong><br />
work ordered and carried out, a measure by the Contractor and verified by the Engineer<br />
and valued at the rates and pries bid in the priced Bill <strong>of</strong> Quantities, where applicable,<br />
and otherwise at such rates and prices as the Engineer may fix within the terms <strong>of</strong> the<br />
Contract.<br />
3. The rates and prices Bid in the priced Bill <strong>of</strong> Quantities, except in so far as it is otherwise,<br />
provided under the Contract include all constructional plant, labor, supervision, materials,<br />
all temporary works and false works, erection, maintenance, establishment and overhead<br />
charges pr<strong>of</strong>it taxation and levels and other charges together with all general risks,<br />
liabilities and obligations set out or implied in the Contract and including remedy <strong>of</strong> the<br />
any defects during the Defects Liability Period.<br />
4. The rates prices shall be quoted entirely in <strong>India</strong>n Rupees Currency.<br />
5. The rate <strong>of</strong> price shall be entered both in figures and words against those items in the Bill<br />
<strong>of</strong> Quantities are given. The cost <strong>of</strong> items against which the Contractor has failed to enter<br />
a rate or price shall be have been covered by other rats and prices entered in the Bill <strong>of</strong><br />
Quantities. However rates are not to be quoted against those items those items for which<br />
quantities are not given.<br />
6. The whole cost <strong>of</strong> complying with the provision <strong>of</strong> the contract shall be deemed to have<br />
been included in the items provided in the priced Bill <strong>of</strong> Quantities.<br />
7. General directions and description <strong>of</strong> work and materials are not necessarily repeated or<br />
summarized in the Bill <strong>of</strong> Quantities. Reference to the relevant section <strong>of</strong> the contract<br />
documentation shall be made before rates or prices against each item in the Bill <strong>of</strong><br />
Quantities.<br />
8. The method <strong>of</strong> measurement <strong>of</strong> completed for payment shall be in accordance with the<br />
requirements are stated in the individual sections <strong>of</strong> the Technical Specifications.
9. Errors will be corrected by the Employer for any arithmetical errors pursuant to Clause<br />
27 <strong>of</strong> the instruction <strong>of</strong> Bidder.<br />
7-1<br />
B. Abbreviations<br />
Abbreviations<br />
Rs.<br />
LS or SUM<br />
Nr. or No.<br />
KM or km.<br />
hct.<br />
m or sq.m.<br />
m or cu.m.<br />
cc, c 3 or cucum<br />
cum.km<br />
KG or kg.<br />
mt<br />
HP<br />
PS<br />
IRC<br />
For<br />
<strong>India</strong>n Rupees<br />
Lump Sum<br />
Number<br />
Kilometre<br />
Hectare<br />
Sqaure metre<br />
Cubic metre<br />
cuibic metre<br />
cuibic meter kilometre<br />
Kilogram<br />
Metric tonne<br />
Horse Power<br />
Provisional Sum<br />
<strong>India</strong>n Roads Congress
MORT & H Specification<br />
issued<br />
(Formerly known as MOST<br />
<strong>Highways</strong>,<br />
revision.)<br />
BIS<br />
Prov.<br />
P.O.L.<br />
Veh. month<br />
Specifications for Road and Bridge Works<br />
by the Ministry <strong>of</strong> Road Transport &<br />
Government <strong>of</strong> <strong>India</strong> 2001Edition (Fourth<br />
Bureau <strong>of</strong> <strong>India</strong>n Standards<br />
Provisional<br />
Petrol, Oil and Lubricants<br />
Vehicle Month<br />
7-2
SECTION - 7<br />
BILL OF QUANTITIES
SECTION - 8<br />
SECTION – 8<br />
FORMS<br />
FORMS<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
Bid Security (Bank Guarantee)<br />
Performance Security (Bank Guarantee)<br />
Bank Guarantee for Advance Payment<br />
Letter <strong>of</strong> Acceptance<br />
Letter <strong>of</strong> Proceed<br />
Agreement
FORM OF BANK GUARANTEE FOR BID SECURITY<br />
WHEREAS _____________________________________________________(Name <strong>of</strong> Bidder)<br />
(hereinafter called “the Bidder”) wishes to submit his bid for the construction <strong>of</strong> (Name <strong>of</strong><br />
work)_____________________________________________________hereinafter called “the<br />
Bid”, KNOW ALL MEN by these presents that we __________________________ (Name <strong>of</strong><br />
Bank) <strong>of</strong> __________________________ (Name <strong>of</strong> Country) having our registered <strong>of</strong>fice at<br />
____________________________________ (hereinafter called “the Bank) are bound unto<br />
(name <strong>of</strong> Employer) _____________________________(hereinafter called “the Employer”) in<br />
the sum <strong>of</strong> Rs. ____________________________<br />
(Rupees_____________________________________)* for which payment can truly be made to<br />
the said Employer. The Bank bind themselves, their successors and assigns by these presents.<br />
Sealed with the Common Seal <strong>of</strong> the Bank this _______________ day <strong>of</strong> _________ 2001.<br />
We have undertaken to pay the amount <strong>of</strong> Rs. _________________________ (Rupees<br />
____________________________________________(in words) to the employer upon receipt<br />
<strong>of</strong> his first written demand without the employer upon receipt <strong>of</strong> his first written demand<br />
without the employer having to substantiate his demand.<br />
This Guarantee will remain in force up to and including the date forty five (45) days after the<br />
date <strong>of</strong> expiry <strong>of</strong> the period <strong>of</strong> bid validity as stated in the Instructions to Bidders or as<br />
extended by the Employer at any time prior to the closing date for submission <strong>of</strong> the bids,<br />
notice <strong>of</strong> which extension (s) to the Bank being hereby waived and any demand in respect<br />
there<strong>of</strong> should reach the Bank not later than the date <strong>of</strong> expiry <strong>of</strong> this guarantee.<br />
Signature <strong>of</strong> the Witness_______________________<br />
Name <strong>of</strong> the Witness __________________________<br />
Address <strong>of</strong> the Witness ________________________<br />
Signature <strong>of</strong> Authorised<br />
Representative <strong>of</strong> the Bank________________<br />
Name and Designation____________________<br />
Seal <strong>of</strong> the Bank_________________________<br />
* The bidder should insert the amount <strong>of</strong> guarantee in words and figures denominated in<br />
<strong>India</strong>n rupees.<br />
PERFORMANCE BANK GUARANTEE
To<br />
Chairman<br />
<strong>National</strong> <strong>Highways</strong> <strong>Authority</strong> <strong>of</strong> <strong>India</strong><br />
NHAI, G-5, G-6, Sector – 10, DWARKA,<br />
New Delhi – 110045.<br />
WHEREAS------------------------------------------*(name and address <strong>of</strong> Contractor) (hereinafter called<br />
“the Contractor”) has undertaken, in pursuance <strong>of</strong> Contract No.------------------- dated --------------------<br />
----------- to execute ----------------------- (name <strong>of</strong> Contract and brief description <strong>of</strong> Works)<br />
(hereinafter called “the Contract”);<br />
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish<br />
you with a bank Guarantee by a <strong>National</strong>ized/Scheduled bank <strong>of</strong> <strong>India</strong> for the sum specified therein as<br />
security for compliance with his obligations in accordance with the Contract;<br />
AND WHEREAS we have agreed to give the Contractor such a Bank Guarantee;<br />
NOW THEREFORE we hereby affirm that we are the guarantor and responsible to you on behalf <strong>of</strong><br />
the Contractor, up to a total <strong>of</strong> Rs.-------------------------------------(amount <strong>of</strong> guarantee)’ (Rupees ------<br />
-----------------------------------------------------------------(in words), such sum being payable in the types<br />
and proportions <strong>of</strong> currencies in which the Contract. Price is payable, and we undertake to pay you,<br />
upon your first written demand and without cavil or argument, any sum or sums within the limits <strong>of</strong> --<br />
--------------------------------------(amount <strong>of</strong> guarantee) as aforesaid without your needing to prove or<br />
to show grounds or reasons for your demand for the sum specified therein.<br />
We hereby waive the necessity <strong>of</strong> your demanding the said debt from the Contractor before presenting<br />
us with the demand.<br />
We further agree that no change or addition to or other modification <strong>of</strong> the terms <strong>of</strong> the Contract or <strong>of</strong><br />
the Works to be performed thereunder or <strong>of</strong> any <strong>of</strong> the Contract documents which may be made<br />
between you and the Contractor shall in any way release us from any liability under this guarantee,<br />
and we hereby waive notice <strong>of</strong> any such change, addit ion or modification.<br />
This guarantee shall be valid until 28 days after the date <strong>of</strong> expiry <strong>of</strong> Defects Liability Period.<br />
Signature and Seal <strong>of</strong> the Guarantor ......................................................<br />
Name and Designation------------------------------------------------------------<br />
Name <strong>of</strong> the Bank-----------------------------------------------------------------<br />
Address------------------------------------------------------------------------------<br />
Date ----------------------------------------------------------------------------------<br />
1. An amount shall be inserted by the Guarantor, representing the percentage <strong>of</strong> the Contract<br />
Price specified in the Contract including additional security for unbalance Bids, if any and<br />
denominated in <strong>India</strong>n Rupees.<br />
2. Bidders are not required to complete this form at the time <strong>of</strong> submission <strong>of</strong> Bid.<br />
BANK GUARANTEE FOR ADVANCE PAYMENT<br />
To<br />
Chairman<br />
<strong>National</strong> <strong>Highways</strong> <strong>Authority</strong> <strong>of</strong> <strong>India</strong><br />
NHAI, G-5, G-6, SECTOR – 10, DWARKA,
New Delhi – 110045.<br />
Gentlemen:<br />
In accordance with the provisions <strong>of</strong> the Conditions <strong>of</strong> contract, sub-clause 51.1 (“Advance<br />
Payment”) <strong>of</strong> the above-mentioned Contract, _______________(name and address <strong>of</strong><br />
contractor)* (hereinafter called “the Contractor”) shall deposit with ________________<br />
(name <strong>of</strong> Employer) a bank guarantee to guarantee his proper and faithful performance under<br />
the said Clause <strong>of</strong> the Contract in an amount <strong>of</strong> ------------------------------------- (amount <strong>of</strong><br />
guarantee) 1 ................................................ (in words).<br />
We, the ------------------------ (bank <strong>of</strong> financial institution), as instructed by the Contractor,<br />
agree unconditionally and irrevocably to guarantee as primary obligator and not as Surety<br />
merely, the payment to ------------------- (name <strong>of</strong> Employer) on his first demand without<br />
whatsoever right <strong>of</strong> objection on our part and without his first claim to the Contractor, in the<br />
amount not exceeding --------------------------------------------------------- (amount <strong>of</strong> guarantee)<br />
----------------------------------------------------------------------- (in word).<br />
We further agree that no change or addition to or other modification <strong>of</strong> the terms <strong>of</strong> the<br />
Contract or <strong>of</strong> Works to be performed thereunder or <strong>of</strong> any <strong>of</strong> the contract documents which<br />
may be made between the -------------------- (name <strong>of</strong> Employer) and the Contractor, shall in<br />
any way release us from any liability under this guarantee, and we hereby waive notice <strong>of</strong> any<br />
such change, addition or modification.<br />
This guarantee shall remain valid and in full effect from the date <strong>of</strong> the advance payment<br />
under the Contract until ----------------- (name <strong>of</strong> Employer) receives full repayment <strong>of</strong> the<br />
same amount from the Contractor.<br />
Yours truly,<br />
Signature and seal:_________________________________<br />
Name and Designation______________________________<br />
Name <strong>of</strong> Bank/Financial Institution ___________________<br />
Address: _________________________________________<br />
Date:___________________________<br />
1. An amount shall be inserted by the bank or financial institution representing the amount<br />
<strong>of</strong> the Advance Payment and denominated in <strong>India</strong>n Rupees<br />
Letter <strong>of</strong> Acceptance<br />
(Letter Head paper <strong>of</strong> the Employer)<br />
To<br />
(name and address <strong>of</strong> the Contractor)
Dear Sirs,<br />
This is to notify that you Bid dated ___________ for e xecution, completion and maintenance <strong>of</strong><br />
the project <strong>of</strong> four / six laning <strong>of</strong> km ______ to km _________ <strong>of</strong> _______________ section <strong>of</strong><br />
NH - _____ in the State ___________________ (Contract package no. ____________) as<br />
prescribed in the bidding document, for the Contract Price <strong>of</strong> Rs. _______________ (Rupees<br />
__________________________________________ ) is hereby accepted by NHAI.<br />
You are hereby requested to furnish Performance Security equal to 5 percent <strong>of</strong> Contract<br />
price within 10 days <strong>of</strong> the receipt <strong>of</strong> this letter <strong>of</strong> acceptance in accordance with clause 34.1<br />
<strong>of</strong> “Instruction <strong>of</strong> Bidders” (Section – 1) valid upto 28 days from date <strong>of</strong> expiry <strong>of</strong> the<br />
Defects Liability Period and sign the contract, failing which action as stated in the clause 34.3<br />
<strong>of</strong> “Instruction to Bidders” will be taken.<br />
Please acknowledge receipt <strong>of</strong> this letter.<br />
Yours faithfully,<br />
Authorised signatory<br />
(Name & title <strong>of</strong> signatory)<br />
(Name <strong>of</strong> Agency)
Issue <strong>of</strong> Notice to proceed with the Work<br />
(letterhead paper <strong>of</strong> the Employer)<br />
_________ (date)<br />
To :<br />
__________________________ (name and address <strong>of</strong> the Contractor)<br />
__________________________<br />
__________________________<br />
__________________________<br />
__________________________<br />
Dear Sirs,<br />
Pursuant to your furnishing the requisite performance security as stipulated in ITB clause<br />
34.1 and signing <strong>of</strong> the contract for the construction <strong>of</strong> _____________ at a Contact Price <strong>of</strong><br />
Rs. ___________________ you are hereby instructed to proceed with the execution <strong>of</strong> the<br />
said works in accordance with the contract documents.<br />
Yours faithfully,<br />
(Signature, name & title <strong>of</strong><br />
signatory authorised to sign<br />
on behalf <strong>of</strong> Employer)
AGREEMENT FORM<br />
AGREEMENT<br />
This agreement, made the .............................. day ....................... <strong>of</strong> ................... 2001<br />
between ___________________________________________________________________<br />
________________________________________________[name and address <strong>of</strong> Employer]<br />
(hereinafter called “the Employer”) and__________________________________<br />
___________________________________________________________________________<br />
___________________________________________________________________________<br />
_________________ [name and address <strong>of</strong> contractor] (hereinafter called “the Contractor” <strong>of</strong><br />
the other part).<br />
Whereas the Employer is desirous that the Contractor execute _________________________<br />
___________________________________________________________________________<br />
_________ [name and identification number <strong>of</strong> Contract] (hereinafter called “the Works”) and the<br />
Employer has accepted the Bid by the Contractor for the execution and completion <strong>of</strong> such<br />
Works and the remedying <strong>of</strong> any defects therein, at a contract price <strong>of</strong><br />
Rs……………………………………….<br />
NOW THIS AGREEMENT WITNESSETH as follows:<br />
1. In this Agreement, words and expression shall have the same meanings as are<br />
respectively assigned to them in the Conditions <strong>of</strong> Contract hereinafter referred to and<br />
they shall be deemed to form and be read and construed as part <strong>of</strong> this agreement.<br />
2. In consideration <strong>of</strong> the payments to be made by the Employer to the contractor as<br />
hereinafter mentioned, the Contractor hereby covenants with the Employer to execute<br />
and complete the Works and remedy any defects therein in conformity in all aspects<br />
with the provisions <strong>of</strong> the Contract.<br />
3. The Employer hereby covenants to pay the Contractor in consideration <strong>of</strong> the<br />
execution and completion <strong>of</strong> the Works and the remedying the defects wherein the<br />
Contract Price or such other sum as may become payable under the provisions <strong>of</strong> the<br />
Contract at the times and in the manner prescribed by the Contract.<br />
4. The following documents shall be deemed to form and be read and construed as part<br />
<strong>of</strong> this Agreement, viz.:
i) Letter <strong>of</strong> Acceptance;<br />
ii) Notice to Proceed with the Works;<br />
iii) Contractor’s Bid;<br />
iv) Contract Data;<br />
v) Conditions <strong>of</strong> Contract (including Special Conditions <strong>of</strong> Contract);<br />
vi) Technical Specifications’<br />
vii) Drawings;<br />
viii) Bill <strong>of</strong> Quantities and<br />
ix) Any other document listed in the Contract Data as forming part <strong>of</strong> the<br />
contract.<br />
In witness where<strong>of</strong> the parties thereto have caused this Agreement to be executed the day and year<br />
first before written.<br />
The Common Seal <strong>of</strong><br />
Was hereunto affixed in the presence <strong>of</strong> :<br />
Signed, Sealed and Delivered by the said<br />
In the presence <strong>of</strong> :<br />
Binding Signature <strong>of</strong> Employer<br />
Binding Signature <strong>of</strong> Contractor<br />
(Attach Power <strong>of</strong> Attorney)