11.07.2014 Views

Dr. P. K. Sikdar ICT, India - IRF India chapter

Dr. P. K. Sikdar ICT, India - IRF India chapter

Dr. P. K. Sikdar ICT, India - IRF India chapter

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4<br />

DEFUSE THE TIME BOMB<br />

RSA right from planning<br />

exercise is a must for road<br />

projects. The audit must be<br />

done at different stages,<br />

Feasibility stage<br />

<br />

<br />

<br />

<br />

<br />

Preliminary design<br />

Detailed design<br />

During construction<br />

Constructed (Pre-opening)<br />

Existing roads (monitoring)<br />

Concept<br />

<strong>Dr</strong>aft<br />

Details<br />

Build<br />

Open to Traffic<br />

Feasibility Audit<br />

Preliminary Design<br />

Audit<br />

Detail Design Audit<br />

Construction stage<br />

Audit<br />

Pre-opening Audit<br />

Monitoring Audit<br />

42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!