November 7, 2011<br />

1


• Goals/Mission statement<br />

• Dynamic Traffic Assignment (DTA) <strong>Subcommittee</strong><br />

created by the MTF in May, 2010<br />

• Merger of DTA and Toll Modeling <strong>Subcommittee</strong>s;<br />

Advanced Traffic Assignment<br />

Sub-committee formed in October, 2011<br />

• <strong>ATA</strong> webpage<br />

2


By Neelam Fatima<br />

<strong>ATA</strong> Sub-Committee Chair<br />

3


• Workshop/Survey<br />

• Development of the requirements (testing<br />

criteria)<br />

• Testing based on selected networks<br />

• Running the network in Static and dynamic<br />

environments<br />

• Development of ISSTA tool<br />

• Started calibration of I-95 network<br />

• Time line<br />

4


A. Hypothetical Networks<br />

B. Jacksonville Regional Network<br />

C. I-95 between Golden Glades and SR 836<br />

with Parallel Arterial Sub-area Network in<br />

Miami-Dade County<br />

5


• Selected by the DTA Sub-committee<br />

• Extracted from Statewide Model<br />

• 151 sq. mile<br />

• 1294 number of nodes<br />

• 2805 number of links<br />

• 143 number of zones<br />

• Running time of Static Assignment VS<br />

Dynamic Assignment (Cube Avenue, Transim<br />

and DynusT)<br />

6


• Static Model SERPM 7.0<br />

• 29 sq. mile<br />

• 1193 number of nodes<br />

• 2573 number of links<br />

• 247 number of zones<br />

• Comparison of run time but also used as case<br />

study in the use of ISSTA and calibration<br />

7


• General Hardware<br />

• General Software<br />

• Shortest Path and Path Choice<br />

• Traffic Flow Model<br />

• Network Demand Specification<br />

• Modeling of Advanced Strategies<br />

• Transit Modeling<br />

8


• Static Environments<br />

• Cube Voyager<br />

• Dynamic Environments<br />

• Cube Avenue<br />

• Transims<br />

• DynusT<br />

9


• Signal control modeling<br />

• Traffic measures<br />

• TAZ representation for DTA modeling<br />

• Fine grained OD estimation<br />

• Calibration<br />

• Convergence<br />

• Running Time<br />

10


13<br />

ITS Modeling and Dynamic Traffic Assignment<br />

By<br />

Mohammed Hadi, Ph.D., PE<br />

Florida International University<br />

Presented at the Advanced Traffic Assignment Meeting<br />

November 7, 2011


14<br />

Background<br />

• Need to assess the benefits and costs of ITS for<br />

operations and planning in Florida<br />

• FITSEVAL developed in 2007-2008<br />

• Funded by FDOT Research Center<br />

• A joint FDOT System Planning Office and FDOT ITS Section<br />

effort<br />

• Based on static assignment and analytical models<br />

• Being extended to include DTA and analysis based on<br />

real-world data


15<br />

FITSEVAL Overview<br />

• A tool developed as part of the FSUTMS environment<br />

• FSUTMS is the approved demand modeling environment in Florida<br />

• No need for file conversion<br />

• Use calibrated regional models<br />

• Flexible and extendable evaluation environment<br />

• Up-to-date methods and parameters<br />

• Powerful data management, modeling, and interfaces


16<br />

FITSEVAL Utilization<br />

• FITSEVAL can support FDOT and MPO decisions<br />

• Benefits of ITS versus other alternatives such as geometry<br />

improvements as part of the long range and short range plans<br />

• It can also be used to assess ITS agency operation benefits<br />

• The original FITSEVAL is a sketch planning evaluation<br />

tool but has some advanced modeling capabilities<br />

• For example it utilizes queuing theory and allow the users to<br />

enter the incident management attributes in the region<br />

• More detailed operational and data analysis being<br />

introduced for design and operation purposes


17<br />

Evaluated ITS Deployment<br />

• Ramp Metering<br />

• Incident Management Systems<br />

• Highway Advisory Radio (HAR) and Dynamic Message Signs (DMS)<br />

• Advanced Travel Information Systems<br />

• Managed Lanes (HOT and tool lanes)<br />

• Smart Work Zones<br />

• Road Weather Information Systems<br />

• Signal Control<br />

• Transit Vehicle Signal Priority<br />

• Emergency Vehicle Signal Priority<br />

• Monitoring and Management of Fixed Route Transit<br />

• Transit Information Systems<br />

• Transit Security Systems<br />

• Transit Electronic Payment Systems


18<br />

Performance Measures<br />

• Vehicle miles of travel (VMT)<br />

• Vehicle hours of travel (VHT)<br />

• Average speed<br />

• Number of accidents<br />

• Fatality<br />

• Injury<br />

• Property damage only<br />

• Fuel consumption (gallons)<br />

• Monetary benefits to users and/or agency, as appropriate<br />

• Emission (gm)<br />

• Hydrocarbon<br />

• Carbon monoxide<br />

• Oxides of nitrogen


19<br />

Evaluation Methods<br />

• A method developed for each component based on<br />

review and assessment of methods used in the past<br />

• Default ITS impact parameters derived based on a<br />

review of previous evaluation studies, USDOT benefit<br />

database and the values used in existing ITS planning<br />

tools<br />

• Costs were obtained based on surveys of agencies in<br />

Florida<br />

• The user can change the default ITS impact<br />

parameters and perform sensitivity analysis


User Interface<br />

20


Visualization of Performance<br />

21


22<br />

Original Development Status<br />

• Project completed in December 2008<br />

• <strong>Presentation</strong>s, webinars, and four day workshop<br />

completed. A second workshop planned for 2012<br />

• Integrated with the SERPM model – the largest model<br />

in Florida<br />

• Integration with other regional models is being<br />

automated by FDOT


23<br />

Recent Application<br />

• FDOT D4 required B/C analysis for information<br />

sharing with FHP and arterial DMS<br />

• Other components of FDOT D4 had already been evaluated<br />

• The two components were not originally coded in<br />

FITSEVAL<br />

• The tool was easily modified to allow the evaluation<br />

• Additional information of the use of information was gathered<br />

from FHP<br />

• The tool allowed very effective and efficient evaluation


24<br />

Extended FITSEVAL<br />

• On-going effort<br />

• Utilization of archived data combined with<br />

simulation/DTA to estimate the performance of the<br />

transportation systems with and without ITS<br />

• Extension initially only applied Freeway ITS modules<br />

• Inclusion of EPA MOVE model parameters for environmental<br />

impact estimations<br />

• Expected completion: Summer 2012


25<br />

Data Capture Tool<br />

• ITSDCAP – ITS Data Capture and Performance<br />

Management Tool<br />

• Capture, archive, and analyze data from multiple sources<br />

• Provide support of FITSEVAL and model calibration and<br />

validation<br />

• Estimate parameters based on ITS data<br />

• Incident management parameters<br />

• Managed lane parameters<br />

• Ramp metering benefits<br />

• Work zone and weather impacts<br />

• DMS benefits


26<br />

Data from Multiple Sources<br />

• SunGuide data (TSS, TVT data, incident, DMS, etc.)<br />

• Central data warehouse<br />

• Statistics office data<br />

• Weather data D4 RWIS, road weather agencies<br />

• Managed lane dynamic congestion pricing rates<br />

• Work zones<br />

• Crash data/CAR System<br />

• 511 data


27<br />

DTA/Simulation Support<br />

• Currently investigating replacing static assignment<br />

with Dynamic Traffic assignment in some ITS<br />

applications<br />

• Allows more detailed analysis and decision support of<br />

traffic operations


28<br />

ITSDCAP<br />

Data (Future)<br />

· Transit<br />

· Arterial<br />

· IntelliDrive<br />

· Private Sector Data<br />

Evaluated ITS and<br />

Benefit-Cost<br />

Enhanced<br />

FITSEVAL<br />

Traffic Models<br />

Demand<br />

· Macro<br />

· Meso<br />

· Micro<br />

Data (Current Project)<br />

· ITS Traffic Detectors<br />

· Statistic Office<br />

· Pricing Data<br />

· Work Zone Data<br />

· Events<br />

· Weather<br />

· Incident Data<br />

· Crash Data<br />

· DMS/HAR Activation<br />

· 511 Data<br />

· RCI Data<br />

ITSDCAP<br />

FITSEVAL<br />

Support<br />

Data<br />

Capture<br />

DSS<br />

Support<br />

Traffic Modelling<br />

Support<br />

Visulization<br />

Performance<br />

Measures<br />

· Delay<br />

· Travel Time<br />

· Travel Time Reliability<br />

· Safety<br />

· Environment<br />

· Others<br />

Strategies<br />

· Toll Lane<br />

· Incident Management<br />

· Traveler Information<br />

· Smart Workzone<br />

· Ramp Metering<br />

· RWIS<br />

· Special Events<br />

· Future<br />

- Transit<br />

- Arterial<br />

- IntelliDrive<br />

Data<br />

Fusion<br />

Performance<br />

Measurements<br />

Strategy Assessment<br />

and<br />

Recommendations<br />

Standard<br />

Location<br />

Referencing<br />

Future Decision<br />

Support Tools<br />

Existing Products<br />

· MOVE<br />

· SSAM<br />

· SHRP2<br />

· Safety Analyst<br />

· IHSDM


Questions/Comments<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!