07.07.2014 Views

Barcodescanner CLV62x ... CLV64x mit Schutzgehäuse IP ... - Sick

Barcodescanner CLV62x ... CLV64x mit Schutzgehäuse IP ... - Sick

Barcodescanner CLV62x ... CLV64x mit Schutzgehäuse IP ... - Sick

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WICHTIG!<br />

Das in der Konfigurationssoftware SOPAS ET darstellbare Lesefelddiagramm<br />

des <strong>Barcodescanner</strong>s ist für das Standardgerät gültig<br />

und bildet deshalb nicht reell die Lesebereiche des Sondergerätes<br />

<strong>mit</strong> <strong>Schutzgehäuse</strong> <strong>IP</strong> 69 k ab. Das darstellbare Lesefelddiagramm<br />

ist sowohl direkt im Gerät als auch in der Gerätedatenbank der<br />

Konfigurationssoftware zusammen <strong>mit</strong> den Konfigurationdaten in<br />

identischen Gerätebeschreibungsdateien (sdd-Datei, SOPAS Device<br />

Description) gespeichert.<br />

IMPORTANT!<br />

The reading field diagram of the bar code scanner that can be<br />

displayed in the SOPAS ET configuration software is valid for the<br />

standard device and therefore, does not depict the real reading<br />

ranges of the special device with protective housing <strong>IP</strong> 69k.<br />

The displayable reading field diagram is saved directly in the device<br />

and in the device database of the configuration software together<br />

with the configuration data in identical device description files (sdd<br />

file, SOPAS Device Description).<br />

7. Elektrische Installation<br />

Grundsätzliche Vorgehensweise für Vorbereitung und Ausführung<br />

der Elektroinstallation siehe Kapitel „Elektroinstallation“ in der<br />

entsprechenden Betriebsanleitung des <strong>Barcodescanner</strong>s für<br />

Standardgeräte.<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

Die Elektrische Installation nur durch qualifizierte Elektrofachkraft<br />

durchführen.<br />

Bei Arbeiten in elektrischen Anlagen die gängigen Sicherheitsvorschriften<br />

beachten!<br />

Elektrische Verbindungen nur im spannungsfreien Zustand<br />

herstellen oder lösen.<br />

Bei Anschlussleitungen <strong>mit</strong> offenem Ende darauf achten, dass<br />

sich abisolierte, blanke Aderenden nicht berühren (Kurzschlussgefahr<br />

bei eingeschalteter Versorgungsspannung!).<br />

Adern entsprechend gegeneinander isolieren.<br />

Die kundenseitigen Leitungsquerschnitte für die Versorgungsspannung<br />

und deren Absicherung gemäß gültiger Normen<br />

ausführen.<br />

Die Schirmung der angeschlossenen Leitungen ist <strong>mit</strong> dem<br />

<strong>Schutzgehäuse</strong> leitend verbunden.<br />

7.1 Pinbelegungen am Gerät<br />

7. Electrical Installation<br />

General procedure for preparation and execution of the electrical<br />

installation, see “Electrical installation” chapter in the respective<br />

operating instructions of the bar code scanner for standard<br />

devices.<br />

■ The electrical installation must only be performed by qualified<br />

electricians.<br />

■ The currently applicable safety regulations must be observed<br />

when working in electrical system!<br />

■ Electrical connections may only be made or opened when there<br />

is no power to the system.<br />

■ When using connecting cables with open ends, ensure that bare<br />

wire ends do not come into contact with each other (risk of shortcircuit<br />

when supply voltage is switched on!)<br />

Wires must be appropriately insulated from each other.<br />

■ Wire cross sections of the supply cable from the customer’s<br />

power system should be designed in accordance with the<br />

applicable standards.<br />

■ The cable shielding has a conductive connection to the protective<br />

housing.<br />

7.1 Pin Assignments of the Device<br />

Anschluss / connection “ower/serial data/CAN/I/O”<br />

17-pol. M12-Stecker, A-codiert<br />

17-pin M12 plug, A-coded<br />

Pin Signal Funktion Function<br />

1 GND Ground Ground<br />

2 DC 18 ... 30 V*) Versorgungsspannung Power Supply voltage<br />

3 CAN L CAN-Bus (IN/OUT) CAN-Bus (IN/OUT)<br />

4 CAN H CAN-Bus (IN/OUT) CAN-Bus (IN/OUT)<br />

5 TD+ (RS-422/485) Host-Schnittstelle (Sender) Host interface (trans<strong>mit</strong>ter)<br />

6 TD– (RS-422/485)/TxD (RS-232 Host-Schnittstelle (Sender) Host interface (trans<strong>mit</strong>ter)<br />

7 TxD (RS-232) Aux-Schnittstelle (Sender) Aux interface (trans<strong>mit</strong>ter)<br />

8 RxD (RS-232) Aux-Schnittstelle (Empfänger) Aux interface (receiver)<br />

9 SensGND Gemeinsame Masse der Schalteingänge Common ground of all switching inputs<br />

10 Sensor 1 Digitaler Schalteingang 1 Digital switching input 1<br />

11 RD+ (RS-422/485) Host-Schnittstelle (Empfänger) Host interface (receiver)<br />

12 RD– (RS-422/485)/RxD (RS-232) Host-Schnittstelle (Empfänger) Host interface (receiver)<br />

13 Result 1 Digitaler Schaltausgang 1 Digital switching output 1<br />

14 Result 2 Digitaler Schaltausgang 2 Digital switching output 2<br />

15 Sensor 2 Digitaler Schalteingang 2 Digital switching input 2<br />

16 – nicht verwendet Not used<br />

17 – nicht verwendet Not used<br />

*) <strong>CLV62x</strong>: DC 10 ... 30 V<br />

Tabelle 1/Table 1<br />

8015720/2013-04 © SICK AG · Germany · All rights reserved · Subject to change without notice · Irrtümer und Änderungen vorbehalten<br />

11 # 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!