<strong>Selby</strong> <strong>District</strong> Submission Draft <strong>Core</strong> <strong>Strategy</strong> – May 2011<br />

___________________________________________________________________<br />

negotiation.<br />

5.87 The indication from the Council’s Economic Viability Assessment is<br />

that in good market conditions a proportion <strong>of</strong> 40% affordable housing<br />

should be achievable on a high proportion <strong>of</strong> sites and this figure is<br />

therefore included as an upper target level.<br />

b) Thresholds<br />

5.88 PPS 3 indicates the Local Planning Authorities have the flexibility to<br />

set the minimum site size limits for which an affordable housing<br />

contribution may be required. Given that <strong>Selby</strong> <strong>District</strong> is basically<br />

rural in character and has a high affordable housing need, 60% <strong>of</strong><br />

which arises outside <strong>Selby</strong>, there is justification for operating lower<br />

thresholds than the national indicative site size threshold <strong>of</strong> 15<br />

dwellings, subject to compatibility with levels <strong>of</strong> viability.<br />

5.89 Supplementary work on the relative viability <strong>of</strong> varying threshold levels<br />

has been undertaken, which has established that a site size <strong>of</strong> 10 units<br />

is the minimum which makes the provision <strong>of</strong> affordable units<br />

sufficiently viable 22 .<br />

c) Commuted Sums<br />

On Sites <strong>of</strong> 10 dwellings or more<br />

5.90 In exceptional circumstances commuted sums may be acceptable on<br />

sites <strong>of</strong> 10 dwellings or more where there are clear benefits in relocating<br />

all or part <strong>of</strong> (PC1.32) the affordable dwellings.<br />

On Sites <strong>of</strong> 1-9 dwellings<br />

5.91 A threshold <strong>of</strong> 10 units will tend to concentrate affordable housing<br />

provision in larger settlements and not necessarily in the smaller<br />

settlements from which the significant rural area need arises.<br />

Consequently, the Council remains committed to securing opportunities<br />

for providing affordable housing <strong>of</strong> an appropriate scale within all<br />

settlements to meet their identified local need.<br />

5.92 In addition in circumstances where high reliance is placed on private<br />

developments to meet the high level <strong>of</strong> affordable need, there is a<br />

strong case for all developments to make a limited contribution<br />

towards affordable housing provision, subject to viability<br />

considerations. Therefore, on small sites below the 10 unit threshold,<br />

a financial contribution will be sought in the form <strong>of</strong> a commuted sum.<br />

The basis for the calculation <strong>of</strong> any commuted sum will be set out in a<br />

Supplementary Planning Document. The contribution will be used to<br />

assist the provision <strong>of</strong> more affordable housing to meet local need<br />

across the <strong>District</strong>.<br />

c) Tenure<br />

5.93 In accordance with the evidence from the Strategic Housing Market<br />

Assessment an overall target <strong>of</strong> 40% 30-50% (PC3.9) intermediate<br />

housing and 60% 50-70%(PC3.9) for social renting will be sought<br />

through new affordable housing provision.<br />

Evidence from the SHMA establishes an overall target <strong>of</strong> 30-50%<br />

22 Affordable Housing Small Sites Threshold Testing – DTZ October 2010<br />