Selby District Submission Draft Core Strategy – May 2011 ___________________________________________________________________ CC. In Tadcaster, due to the potential land availability constraint on delivery, the Site Allocation DPD will allocate land to accommodate the quantum of development set out in Policy CP2 in three phases as follows: Phase 1: the preferred sites in/on the edge of Tadcaster which may include Green Belt releases in accordance with Policy CPXX. Phase 1 will be released on adoption of the SADPD. Phase 2: a second choice of preferred sites in/on the edge of Tadcaster which may include Green Belt releases in accordance with Policy CPXX. Phase 2 will only be released in the event that Phase 1 is not at least one third completed after 5 years following the release of Phase 1. Phase 3: a range of sites in/on the edge of settlements in accordance with the hierarchy in Policy CP1 and which may include Green Belt releases in accordance with Policy CPXX. Phase 3 will only be released after 3 years following release of Phase 2 and only in the event that the combined delivery of Phase 1 and Phase 2 is less than 50% of the target yield (PC6.51) C/E In the event of a shortfall in the cumulative target (identified in Policy CP1) for the provision of housing on previously developed land being identified, or anticipated, the Council will take remedial action wherever opportunities can be identified to do so. (PC6.51) D In advance of the SADPD being adopted, those allocated sites identified in saved Policy H2 of the Selby District Local Plan will contribute to housing land supply. (PC5.37 incorporating PC4.9, PC4.10 and PC4.11) 5.53 5.56 Meeting the Previously Developed Land Target Indicator Previously developed land (PDL) is a resource whose availability cannot be manufactured – only facilitated. The rate at which previously developed land is being utilised will be monitored and the likelihood of the cumulative average percentage for PDL usage falling below the 40% target will be identified as early as possible. against an indicator of 40%. (PC6.47) Details of the PDL Trajectory are provided in Appendix 1. 5.54 In this event the Council will consider taking one or more of the following actions: • Facilitating land assembly by finding alternative sites for existing users or by compulsory purchase where no other alternative exists. • Restricting planning permissions on greenfield sites provided these are not required to meet overall housing delivery. - 62 -

Selby District Submission Draft Core Strategy – May 2011 ___________________________________________________________________ • Reviewing the Allocations DPD with the specific aim of investigating further PDL sites. (PC6.48) 5.55 No action is required in the case of the previously developed land target being exceeded. (PC6.49) 5.29 5.57 5.30 5.58 5.31 5.59 5.32 5.60 5.33 5.61 5.34 5.62 Olympia Park Strategic Development Site It is intended that the majority of new employment opportunities and about 40% of the Selby housing target will be provided through a large scale, mixed use development on land to the east of Selby, as delineated on the accompanying proposals map (Map 6) Proposals Map and Map 6 (PC1.27). This will include about 1,000 new dwellings and 23 ha of employment land in the period up to 2026 2027 (PC5.27), including B1offices, B1 and B2 industrial units, B8 storage and distribution premises, higher value uses, local convenience retail facilities and a public house. About 10 hectares of land is also reserved for longer term use. The ‘Olympia Park’ site covers an area of approximately 90 hectares, including around 18 hectares of previously developed land, extending from Barlby Bridge Community Primary School on its western boundary to the Selby Bypass in the east and which is contained by the A19 Barlby Road, the Leeds – Hull railway, the River Ouse and the A63 Selby Bypass. Existing land uses comprise a mixture of employment uses, redundant industrial buildings and former operational land, and greenfield land in the form of allotments, playing fields, woodland and agricultural land. Parts of the site were previously allocated for employment growth in the Selby District Local Plan, or safeguarded for the expansion of freight handling and storage activities associated with an existing freight transfer depot and railhead which bisects the central part of the site. It is envisaged that the Olympia Park proposals will enable the continued expansion of freight handling and warehousing. The site is well related to the existing built up area, with good connectivity to the existing highway network and public transport, and pedestrian access to a wide range of facilities and services in Selby town centre. It provides the opportunity for a sustainable urban extension combined with the regeneration of an extensive area of former industrial land and premises. The residential element of the scheme will be expected to create an inclusive community including a target of 40% affordable housing over the lifetime of the scheme, in accordance with the Councils’ policy. Provision will also be made for the relocation and improvement of the existing allotments and playing fields, creation of new green infrastructure and enhancement of the river frontage. The scheme will be expected to contribute to national and local targets for reducing greenhouse emissions for example by promoting non car means of transport, and securing energy from renewable sources including micro generation on site and utilisation of biomass, - 63 -

<strong>Selby</strong> <strong>District</strong> Submission Draft <strong>Core</strong> <strong>Strategy</strong> – May 2011<br />

___________________________________________________________________<br />

• Reviewing the Allocations DPD with the specific aim <strong>of</strong><br />

investigating further PDL sites. (PC6.48)<br />

5.55 No action is required in the case <strong>of</strong> the previously developed land<br />

target being exceeded. (PC6.49)<br />

5.29<br />

5.57<br />

5.30<br />

5.58<br />

5.31<br />

5.59<br />

5.32<br />

5.60<br />

5.33<br />

5.61<br />

5.34<br />

5.62<br />

Olympia Park Strategic Development Site<br />

It is intended that the majority <strong>of</strong> new employment opportunities and<br />

about 40% <strong>of</strong> the <strong>Selby</strong> housing target will be provided through a<br />

large scale, mixed use development on land to the east <strong>of</strong> <strong>Selby</strong>, as<br />

delineated on the accompanying proposals map (Map 6) Proposals<br />

Map and Map 6 (PC1.27). This will include about 1,000 new<br />

dwellings and 23 ha <strong>of</strong> employment land in the period up to 2026<br />

2027 (PC5.27), including B1<strong>of</strong>fices, B1 and B2 industrial units, B8<br />

storage and distribution premises, higher value uses, local<br />

convenience retail facilities and a public house. About 10 hectares <strong>of</strong><br />

land is also reserved for longer term use.<br />

The ‘Olympia Park’ site covers an area <strong>of</strong> approximately 90 hectares,<br />

including around 18 hectares <strong>of</strong> previously developed land,<br />

extending from Barlby Bridge Community Primary School on its<br />

western boundary to the <strong>Selby</strong> Bypass in the east and which is<br />

contained by the A19 Barlby Road, the Leeds – Hull railway, the<br />

River Ouse and the A63 <strong>Selby</strong> Bypass. Existing land uses comprise<br />

a mixture <strong>of</strong> employment uses, redundant industrial buildings and<br />

former operational land, and greenfield land in the form <strong>of</strong> allotments,<br />

playing fields, woodland and agricultural land.<br />

Parts <strong>of</strong> the site were previously allocated for employment growth in<br />

the <strong>Selby</strong> <strong>District</strong> Local Plan, or safeguarded for the expansion <strong>of</strong><br />

freight handling and storage activities associated with an existing<br />

freight transfer depot and railhead which bisects the central part <strong>of</strong><br />

the site. It is envisaged that the Olympia Park proposals will enable<br />

the continued expansion <strong>of</strong> freight handling and warehousing.<br />

The site is well related to the existing built up area, with good<br />

connectivity to the existing highway network and public transport,<br />

and pedestrian access to a wide range <strong>of</strong> facilities and services in<br />

<strong>Selby</strong> town centre. It provides the opportunity for a sustainable urban<br />

extension combined with the regeneration <strong>of</strong> an extensive area <strong>of</strong><br />

former industrial land and premises.<br />

The residential element <strong>of</strong> the scheme will be expected to create an<br />

inclusive community including a target <strong>of</strong> 40% affordable housing<br />

over the lifetime <strong>of</strong> the scheme, in accordance with the Councils’<br />

policy. Provision will also be made for the relocation and<br />

improvement <strong>of</strong> the existing allotments and playing fields, creation <strong>of</strong><br />

new green infrastructure and enhancement <strong>of</strong> the river frontage.<br />

The scheme will be expected to contribute to national and local<br />

targets for reducing greenhouse emissions for example by promoting<br />

non car means <strong>of</strong> transport, and securing energy from renewable<br />

sources including micro generation on site and utilisation <strong>of</strong> biomass,<br />