Tracked Version of Core Strategy, November 2012 - Selby District ...
Tracked Version of Core Strategy, November 2012 - Selby District ...
Tracked Version of Core Strategy, November 2012 - Selby District ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Selby</strong> <strong>District</strong> Submission Draft <strong>Core</strong> <strong>Strategy</strong> – May 2011<br />
___________________________________________________________________<br />
these are not required to meet overall housing delivery.<br />
• Reviewing the Allocations DPD with the specific aim <strong>of</strong><br />
investigating further PDL sites.<br />
5.44f No action is required in the case <strong>of</strong> the previously developed land<br />
target being exceeded. 14<br />
5.44n<br />
Moved<br />
from end<br />
<strong>of</strong><br />
section<br />
5.44<br />
PC7.20<br />
5.44o<br />
PC7.20<br />
Interim arrangements for maintaining the housing land supply<br />
Prior to the adoption <strong>of</strong> the Site Allocations DPD Local Plan, the 5-<br />
year housing land supply Supply Period will be maintained by<br />
drawing on Phase 2 allocations identified in Policy H2 <strong>of</strong> the <strong>Selby</strong><br />
<strong>District</strong> Local Plan, which have been released by the Council under<br />
the provisions <strong>of</strong> saved SDLP Policy H2A. Those policies Policy H2 is<br />
are saved until superseded by the Site Allocations Local Plan DPD.<br />
The Council’s monitoring process will identify any shortfall which<br />
occurs, or is considered highly likely to occur within the subsequent<br />
year, in the housing land Supply Period <strong>of</strong> deliverable sites, and may<br />
take action to facilitate delivery. (PC5.36)<br />
5.44g<br />
5.45<br />
5.44h<br />
5.46<br />
Maintaining delivery <strong>of</strong> housing in the Plan period<br />
Policy CP2 (and reasoned justification) above sets out how sites are<br />
allocated to deliver the housing needs and the trajectory describes<br />
the expected delivery pattern. Appendix x provide further background<br />
to the delivery scenarios including the contributions from windfalls.<br />
The Council will monitor the delivery <strong>of</strong> housing across the <strong>District</strong><br />
and ensure that the quantum <strong>of</strong> housing as well as the spatial<br />
distribution <strong>of</strong> housing is consistent with the <strong>Core</strong> <strong>Strategy</strong>.<br />
Ultimately, ‘delivery’ is the quantum <strong>of</strong> homes built. The Council will<br />
seek to ensure delivery, by providing sufficient housing land (through<br />
allocating enough deliverable sites in the Site Allocations Local Plan<br />
and maintaining a 5-year supply) and keep a check on actual delivery<br />
by homebuilders through monitoring <strong>of</strong> completions in the AMR.<br />
Where delivery is failing or weak, the Council will investigate the<br />
causes <strong>of</strong> the under performance and take appropriate remedial<br />
action in accordance with Policy CP3; which defines underperformance<br />
as:<br />
1. Delivery which falls short <strong>of</strong> the quantum expected in the<br />
annual target over a continuous 3 year period; or<br />
2. Where there is less than a 5 year housing land supply<br />
14 [Additional Modification] 5.44c – 5.44f deleted above as it repeats paragraphs 5.53 – 5.55. (Corrects<br />
a previous error)<br />
- 58 -