Tracked Version of Core Strategy, November 2012 - Selby District ...
Tracked Version of Core Strategy, November 2012 - Selby District ...
Tracked Version of Core Strategy, November 2012 - Selby District ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Selby</strong> <strong>District</strong> Submission Draft <strong>Core</strong> <strong>Strategy</strong> – May 2011<br />
_________________________________________________________________<br />
put at unacceptable risk from, or being adversely<br />
affected by unacceptable levels <strong>of</strong> soil, air, water, light<br />
or noise pollution or land instability.<br />
Unless it can be demonstrated that it is not practicable or<br />
viable, all new housing developments should:<br />
i. Reflect ‘Lifetime Neighbourhood’ principles 24 (PC2.18),<br />
and<br />
ii. Achieve the ‘Very Good’ standard <strong>of</strong> the ‘Building for<br />
Life’ assessment, and<br />
iii. Be constructed to Lifetime Homes Standards in order to<br />
provide adaptable homes, which meet the long term<br />
changing needs <strong>of</strong> occupiers.<br />
Development schemes should seek to reflect the principles <strong>of</strong><br />
nationally recognised design benchmarks to ensure that the<br />
best quality <strong>of</strong> design is achieved. (PC4.42)<br />
(PC6.99)<br />
- 120 -