Reason: To ensure that the links through to the Carousel Walk/Fairfield Link development can be achieved in order to achieve connectivity and comprehensive development of the Phase 2 site in accordance with Policy SHB/1B. 20. Applications for the approval of the Reserved Matters referred to in Condition No 2 shall include a scheme of landscaping and tree planting for the site, indicating inter alia the number, species, heights on planting and positions of all trees, shrubs and bushes. The approved scheme shall thereafter be carried out in its entirety within the period of twelve months beginning with the date on which development is commenced, or within such longer period as may be agreed in writing with the Local Planning Authority. All trees, shrubs and bushes shall be adequately maintained for the period of five years beginning with the date of completion of the scheme and during that period all losses shall be made good as and when necessary. INFORMATIVE: The landscaping plan should give regard to the following: a) a 5m buffer should be retained for both sides of all hedgerows; b) no hedgerows should be incorporated into individual gardens; c) hedgerows should be managed in perpetuity; d) Existing hedgerows should be gapped up with native species (70-80% prickly species such as holly, hawthorn, dog rose and blackthorn; e) Hedgerow management should be considered. Reason: To safeguard to the rights of control by the Local Planning Authority in the interests of amenity, biodiversity and to enhance and protect existing wildlife in order to comply with Policies ENV1 (1) and SHB/1B of the Selby District Local Plan, and the National Planning Policy Framework (NPPF). 21. The development permitted by this planning permission shall be carried out in complete accordance with the recommendations set out in the Geoenvironmental Appraisal of Land at Sherburn in Elmet Report No: 2741/2 prepared by AIG Consultants Limited dated July 2002. Reason: To secure the satisfactory implementation of the proposal, having had regard to Policy ENV2 of the Selby District Local Plan and the NPPF. 22. The development hereby approved shall be carried out in accordance with the design parameters set out in the Design and Access Statement other than: 90
No dwellings shall be constructed within Flood Zone 3 as shown on the Flood Map reference RFI/2011/20481 included at Appendix C of the Flood Risk Assessment Report No. 800/174r2 dated April 2012 by ARP Associates. Reason: To ensure that the proposal is carried out in accordance with the design parameters on which the outline application has been assessed and in the interests of flood risk. 23. Applications for the approval of the Reserved Matters referred to in Condition No 2 shall include a noise assessment having regard to recommended noise levels defined by The World Health Organisation (WHO), detailing noise monitoring at appropriate locations adjacent to the noise sources and detailing a sound insulation scheme designed to protect the amenity of occupants of the residential properties from traffic noise from Low Street and the A162 to demonstrate that WHO levels can be achieved both inside the dwellings and in the garden space. The sound insulation scheme shall thereafter be completed in its entirety and those works shall be retained thereafter. Reason: In the interests of amenity of the occupiers of residential properties and to accord with the requirements of policies ENV1, ENV2 and SHB1/1B of the Selby District Local Plan and the NPPF. 24. At least 10% of the energy supply of the development shall be secured from decentralised and renewable or low-carbon energy sources. Details and a timetable of how this is to be achieved, including details of physical works on site, shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented in accordance with the approved timetable and retained as operational thereafter unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interest of sustainability, to minimise the development’s impact inline with Policy ENV5 of the Regional Spatial Strategy. 25. Notwithstanding the provisions of conditions 5, 6 and 7 applications for the approval of the Reserved Matters referred to in Condition No 2 shall include details the existing and finished site levels relating to Ordnance Survey Datum together with details of finished floor levels of each dwelling, together with corresponding finished ground levels and of surface and land drainage associated with any works. The development shall be carried out only in accordance with the details so approved and no dwelling shall be occupied until the works relating to that property have been completed. These shall be so retained for the lifetime of the development, unless otherwise approved in writing by the Local Planning Authority. 91
- Page 39 and 40: een carried out. Although it would
- Page 41 and 42: character of surrounding dwellings
- Page 43 and 44: • It would appear that the develo
- Page 45 and 46: problems for local residents who, f
- Page 47 and 48: 2. The Report allow a further 8 yea
- Page 49 and 50: Taking these in turn. vi) Provision
- Page 51 and 52: 2.8.11 The Regional Spatial Strateg
- Page 53 and 54: compliance of the proposals with th
- Page 55 and 56: • Vehicular site access arrangeme
- Page 57 and 58: vehicles; and consider the needs of
- Page 59 and 60: 2.9.33 NYCC Highways have confirmed
- Page 61 and 62: 2.10.5 At a regional level the RSS
- Page 63 and 64: 2.11.5 The report concludes that th
- Page 65 and 66: 10) An appropriate flood risk asses
- Page 67 and 68: ii. and a site-specific flood risk
- Page 69 and 70: carried out in accordance with the
- Page 71 and 72: earlier in this Report seeking use
- Page 73 and 74: 2.17.8 In conclusion, it is conside
- Page 75 and 76: The indicative plans submitted demo
- Page 77 and 78: infrastructure) and came into force
- Page 79 and 80: 2.22.9 As such the scheme is consid
- Page 81 and 82: 2.23 Climate Change, Energy Efficie
- Page 83 and 84: have raised the need for affordable
- Page 85 and 86: ii) affordable housing provision, r
- Page 87 and 88: climate change flood event. Details
- Page 89: The agreed drawings must be approve
- Page 95 and 96: Public Session Report Reference Num
- Page 97 and 98: Low Street to the south of the vill
- Page 99 and 100: Reason for Refusal 1 The proposal b
- Page 101 and 102: • The increase in numbers of resi
- Page 103 and 104: of adoption an indicative capacity
- Page 105 and 106: • Types and Sizes - Affordable Ho
- Page 107 and 108: and that further clarification/evid
- Page 109 and 110: ecording a condition should be appe
- Page 111 and 112: • The provision of well designed
- Page 113 and 114: presented as an Appendix within the
- Page 115 and 116: We support the proposed preservatio
- Page 117 and 118: - When travelling around Leeds and
- Page 119 and 120: - The traffic projections are woefu
- Page 121 and 122: - The Sherburn village centre is al
- Page 123 and 124: determination must be made in accor
- Page 125 and 126: xvi) xvii) xviii) Climate Change, E
- Page 127 and 128: the Regional Spatial Strategy Polic
- Page 129 and 130: 2.9.1 Policy ENV1 (2) states that i
- Page 131 and 132: 2.9.10 In addition the report confi
- Page 133 and 134: 2.9.19 The Travel Plan Framework se
- Page 135 and 136: Phase 1 development on Moor Lane, w
- Page 137 and 138: 2.10.6 In addition, Paragraph 58 of
- Page 139 and 140: is no reason why the likely landsca
No dwellings shall be constructed <strong>with</strong>in Flood Zone 3 as shown on<br />
the Flood Map reference RFI/2011/20481 included at Appendix C of<br />
the Flood Risk Assessment Report No. 800/174r2 dated April 2012<br />
by ARP Associates.<br />
Reason: To ensure that the proposal is carried out in accordance<br />
<strong>with</strong> the design parameters on which the outline application has<br />
been assessed <strong>and</strong> in the interests of flood risk.<br />
23. <strong>Applications</strong> for the approval of the Reserved Matters referred to in<br />
Condition No 2 shall include a noise assessment having regard to<br />
recommended noise levels defined by The World Health<br />
Organisation (WHO), detailing noise monitoring at appropriate<br />
locations adjacent to the noise sources <strong>and</strong> detailing a sound<br />
insulation scheme designed to protect the amenity of occupants of<br />
the residential properties from traffic noise from Low Street <strong>and</strong> the<br />
A162 to demonstrate that WHO levels can be achieved both inside<br />
the dwellings <strong>and</strong> in the garden space. The sound insulation<br />
scheme shall thereafter be completed in its entirety <strong>and</strong> those<br />
works shall be retained thereafter.<br />
Reason: In the interests of amenity of the occupiers of residential<br />
properties <strong>and</strong> to accord <strong>with</strong> the requirements of policies ENV1,<br />
ENV2 <strong>and</strong> SHB1/1B of the <strong>Selby</strong> <strong>District</strong> Local Plan <strong>and</strong> the NPPF.<br />
24. At least 10% of the energy supply of the development shall be<br />
secured from decentralised <strong>and</strong> renewable or low-carbon energy<br />
sources. Details <strong>and</strong> a timetable of how this is to be achieved,<br />
including details of physical works on site, shall be submitted to <strong>and</strong><br />
approved in writing by the Local Planning Authority. The approved<br />
details shall be implemented in accordance <strong>with</strong> the approved<br />
timetable <strong>and</strong> retained as operational thereafter unless otherwise<br />
agreed in writing by the Local Planning Authority.<br />
Reason: In the interest of sustainability, to minimise the<br />
development’s impact inline <strong>with</strong> Policy ENV5 of the Regional<br />
Spatial Strategy.<br />
25. Not<strong>with</strong>st<strong>and</strong>ing the provisions of conditions 5, 6 <strong>and</strong> 7 applications<br />
for the approval of the Reserved Matters referred to in Condition No<br />
2 shall include details the existing <strong>and</strong> finished site levels relating to<br />
Ordnance Survey Datum together <strong>with</strong> details of finished floor levels<br />
of each dwelling, together <strong>with</strong> corresponding finished ground levels<br />
<strong>and</strong> of surface <strong>and</strong> l<strong>and</strong> drainage associated <strong>with</strong> any works. The<br />
development shall be carried out only in accordance <strong>with</strong> the details<br />
so approved <strong>and</strong> no dwelling shall be occupied until the works<br />
relating to that property have been completed. These shall be so<br />
retained for the lifetime of the development, unless otherwise<br />
approved in writing by the Local Planning Authority.<br />