Reason: To ensure that the links through to the Carousel Walk/Fairfield Link development can be achieved in order to achieve connectivity and comprehensive development of the Phase 2 site in accordance with Policy SHB/1B. 20. Applications for the approval of the Reserved Matters referred to in Condition No 2 shall include a scheme of landscaping and tree planting for the site, indicating inter alia the number, species, heights on planting and positions of all trees, shrubs and bushes. The approved scheme shall thereafter be carried out in its entirety within the period of twelve months beginning with the date on which development is commenced, or within such longer period as may be agreed in writing with the Local Planning Authority. All trees, shrubs and bushes shall be adequately maintained for the period of five years beginning with the date of completion of the scheme and during that period all losses shall be made good as and when necessary. INFORMATIVE: The landscaping plan should give regard to the following: a) a 5m buffer should be retained for both sides of all hedgerows; b) no hedgerows should be incorporated into individual gardens; c) hedgerows should be managed in perpetuity; d) Existing hedgerows should be gapped up with native species (70-80% prickly species such as holly, hawthorn, dog rose and blackthorn; e) Hedgerow management should be considered. Reason: To safeguard to the rights of control by the Local Planning Authority in the interests of amenity, biodiversity and to enhance and protect existing wildlife in order to comply with Policies ENV1 (1) and SHB/1B of the Selby District Local Plan, and the National Planning Policy Framework (NPPF). 21. The development permitted by this planning permission shall be carried out in complete accordance with the recommendations set out in the Geoenvironmental Appraisal of Land at Sherburn in Elmet Report No: 2741/2 prepared by AIG Consultants Limited dated July 2002. Reason: To secure the satisfactory implementation of the proposal, having had regard to Policy ENV2 of the Selby District Local Plan and the NPPF. 22. The development hereby approved shall be carried out in accordance with the design parameters set out in the Design and Access Statement other than: 90

No dwellings shall be constructed within Flood Zone 3 as shown on the Flood Map reference RFI/2011/20481 included at Appendix C of the Flood Risk Assessment Report No. 800/174r2 dated April 2012 by ARP Associates. Reason: To ensure that the proposal is carried out in accordance with the design parameters on which the outline application has been assessed and in the interests of flood risk. 23. Applications for the approval of the Reserved Matters referred to in Condition No 2 shall include a noise assessment having regard to recommended noise levels defined by The World Health Organisation (WHO), detailing noise monitoring at appropriate locations adjacent to the noise sources and detailing a sound insulation scheme designed to protect the amenity of occupants of the residential properties from traffic noise from Low Street and the A162 to demonstrate that WHO levels can be achieved both inside the dwellings and in the garden space. The sound insulation scheme shall thereafter be completed in its entirety and those works shall be retained thereafter. Reason: In the interests of amenity of the occupiers of residential properties and to accord with the requirements of policies ENV1, ENV2 and SHB1/1B of the Selby District Local Plan and the NPPF. 24. At least 10% of the energy supply of the development shall be secured from decentralised and renewable or low-carbon energy sources. Details and a timetable of how this is to be achieved, including details of physical works on site, shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented in accordance with the approved timetable and retained as operational thereafter unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interest of sustainability, to minimise the development’s impact inline with Policy ENV5 of the Regional Spatial Strategy. 25. Notwithstanding the provisions of conditions 5, 6 and 7 applications for the approval of the Reserved Matters referred to in Condition No 2 shall include details the existing and finished site levels relating to Ordnance Survey Datum together with details of finished floor levels of each dwelling, together with corresponding finished ground levels and of surface and land drainage associated with any works. The development shall be carried out only in accordance with the details so approved and no dwelling shall be occupied until the works relating to that property have been completed. These shall be so retained for the lifetime of the development, unless otherwise approved in writing by the Local Planning Authority. 91

No dwellings shall be constructed <strong>with</strong>in Flood Zone 3 as shown on<br />

the Flood Map reference RFI/2011/20481 included at Appendix C of<br />

the Flood Risk Assessment Report No. 800/174r2 dated April 2012<br />

by ARP Associates.<br />

Reason: To ensure that the proposal is carried out in accordance<br />

<strong>with</strong> the design parameters on which the outline application has<br />

been assessed <strong>and</strong> in the interests of flood risk.<br />

23. <strong>Applications</strong> for the approval of the Reserved Matters referred to in<br />

Condition No 2 shall include a noise assessment having regard to<br />

recommended noise levels defined by The World Health<br />

Organisation (WHO), detailing noise monitoring at appropriate<br />

locations adjacent to the noise sources <strong>and</strong> detailing a sound<br />

insulation scheme designed to protect the amenity of occupants of<br />

the residential properties from traffic noise from Low Street <strong>and</strong> the<br />

A162 to demonstrate that WHO levels can be achieved both inside<br />

the dwellings <strong>and</strong> in the garden space. The sound insulation<br />

scheme shall thereafter be completed in its entirety <strong>and</strong> those<br />

works shall be retained thereafter.<br />

Reason: In the interests of amenity of the occupiers of residential<br />

properties <strong>and</strong> to accord <strong>with</strong> the requirements of policies ENV1,<br />

ENV2 <strong>and</strong> SHB1/1B of the <strong>Selby</strong> <strong>District</strong> Local Plan <strong>and</strong> the NPPF.<br />

24. At least 10% of the energy supply of the development shall be<br />

secured from decentralised <strong>and</strong> renewable or low-carbon energy<br />

sources. Details <strong>and</strong> a timetable of how this is to be achieved,<br />

including details of physical works on site, shall be submitted to <strong>and</strong><br />

approved in writing by the Local Planning Authority. The approved<br />

details shall be implemented in accordance <strong>with</strong> the approved<br />

timetable <strong>and</strong> retained as operational thereafter unless otherwise<br />

agreed in writing by the Local Planning Authority.<br />

Reason: In the interest of sustainability, to minimise the<br />

development’s impact inline <strong>with</strong> Policy ENV5 of the Regional<br />

Spatial Strategy.<br />

25. Not<strong>with</strong>st<strong>and</strong>ing the provisions of conditions 5, 6 <strong>and</strong> 7 applications<br />

for the approval of the Reserved Matters referred to in Condition No<br />

2 shall include details the existing <strong>and</strong> finished site levels relating to<br />

Ordnance Survey Datum together <strong>with</strong> details of finished floor levels<br />

of each dwelling, together <strong>with</strong> corresponding finished ground levels<br />

<strong>and</strong> of surface <strong>and</strong> l<strong>and</strong> drainage associated <strong>with</strong> any works. The<br />

development shall be carried out only in accordance <strong>with</strong> the details<br />

so approved <strong>and</strong> no dwelling shall be occupied until the works<br />

relating to that property have been completed. These shall be so<br />

retained for the lifetime of the development, unless otherwise<br />

approved in writing by the Local Planning Authority.<br />