02.07.2014 Views

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13.3 Application: 2012/0342/FUL<br />

Location: Lara Bridge, Lowmoor Road<br />

South Duffield<br />

Proposal: Erection of one wind turbine <strong>and</strong> associated<br />

infrastructure. The proposed turbine is a Vestas<br />

wind turbine <strong>with</strong> a hub height of 31.5m <strong>with</strong> a<br />

horizontal axis, three bladed <strong>with</strong> a rotor<br />

diameter of 29m <strong>and</strong> height to blade tip of 46m.<br />

The Planning Officer presented a report which has been referred to the<br />

Planning Committee due to the number of objections that have been received<br />

in response to the application.<br />

The Planning Officer explained that the application was for the erection of a<br />

single 225kw turbine <strong>and</strong> associated infrastructure.<br />

The Planning Officer outlined the key issues in the determination of the<br />

application. It was explained that having had regard to all relevant policies <strong>and</strong><br />

other material considerations it was considered that the proposal was<br />

considered acceptable.<br />

Within the officers update note, it was explained that the agent had submitted<br />

a location plan amending the site boundary following comments by objectors.<br />

In addition, comments had also been received from the agent in response to<br />

technical questions raised by the objectors about the turbine. The officer’s<br />

update note also contained an amendment to condition nine in the report.<br />

Public Speaker – Amy Souter, Agent<br />

• The applicant owned Westdale Filters.<br />

• Over the last seven years the business has experienced large growth<br />

<strong>and</strong> there are six full time members of staff.<br />

• The company is facing competition from overseas competitors who can<br />

provide lower costs.<br />

• The current energy use for the building is very high.<br />

• In order to offset energy usage, the farm is looking to install a wind<br />

turbine which would contribute to 70% of the energy costs.<br />

• Consideration has been given to planning policy <strong>and</strong> the number of<br />

cumulative effects.<br />

• The proposed site has been chosen to minimise impact.<br />

• The proposed turbine is close to the business than any homes.<br />

• The turbine would not dominantly feature.<br />

• Any cumulative impact would not be significant.<br />

• Letters of support have been received from neighbours.<br />

The Committee debated the application <strong>and</strong> a vote was taken.<br />

RESOLVED:<br />

Planning Committee<br />

25 July 2012 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!