Agenda with Maps and Applications (21Mb) - pdf - Selby District ...
Agenda with Maps and Applications (21Mb) - pdf - Selby District ... Agenda with Maps and Applications (21Mb) - pdf - Selby District ...
04. The site shall be developed with separate systems of drainage for foul and surface water on and off site. Reason: In the interest of satisfactory and sustainable drainage 05. No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall for surface water have been completed in accordance with details to be submitted to and approved by the local planning authority before development commences. Reason: To ensure that the site is properly drained and surface water is not discharged to the foul sewerage system which will prevent overloading 06. There shall be no excavation or other groundworks, except for investigative works, or the depositing of material on the site until the access(es) to the site have been set out and constructed in accordance with the published Specification of the Highway Authority and the following requirements: (i)(a) The access shall be formed to give a minimum carriageway width of 3.2 metres, and that part of the access road extending 6 metres into the site shall be constructed in accordance with Standard Detail number E6. (ii) Any gates or barriers shall be erected a minimum distance of 6 metres back from the carriageway of the existing highway and shall not be able to swing over the existing or proposed highway. (iii) Provision shall be made to prevent surface water from the site/plot discharging onto the existing or proposed highway in accordance with the Specification of the Local Highway Authority. All works shall accord with the approved details. Reason: In accordance with policy number and to ensure a satisfactory means of access to the site from the public highway in the interests of vehicle and pedestrian safety and convenience. INFORMATIVE You are advised that a separate licence will be required from the Highway Authority in order to allow any works in the adopted highway to be carried out. The ‘Specification for Housing and Industrial Estate Roads and Private Street Works’ published by North Yorkshire County Council, the Highway Authority, is available at the County Council’s offices. The local office of the Highway Authority will also be pleased to provide the detailed constructional specification referred to in this condition. 07. There shall be no access or egress by any vehicles between the highway and the application site (except for the purposes of constructing the initial site 326
access) until splays are provided giving clear visibility of 70 metres measured along both channel lines of the major road (Back Lane) from a point measured 2.4 metres down the centre line of the access road. Once created, these visibility areas shall be maintained clear of any obstruction and retained for their intended purpose at all times. Reason In accordance with policy number and in the interests of road safety. INFORMATIVE An explanation of the terms used above is available from the Highway Authority. 08. No part of the development shall be brought into use until the approved vehicle access, parking, manoeuvring and turning areas approved under condition number: (i) Have been constructed in accordance with the submitted drawing (YEW- 277-001-02A) Once created these areas shall be maintained clear of any obstruction and retained for their intended purpose at all times. Reason In accordance with policy number and to provide for appropriate on-site vehicle facilities in the interests of highway safety and the general amenity of the development. 09. The development hereby permitted shall be carried out in accordance with the plans/drawings listed below: 3.1 Legal Issues ELPR - Elevations as Proposed – 277-001-02B- received 06.03.2012 LOC - Location Plan - 277-001-03A – received 25.01.2012 LAY - Planning Layout - 277-001-04A – received 09.02.2012 ELV - Elevations as Existing - 277-001-01A – received 09.02.2012 Reason: For the avoidance of doubt 3.1.1 Planning Acts This application has been determined in accordance with the relevant planning acts. 3.1.2 Human Rights Act 1998 It is considered that a decision made in accordance with this recommendation would not result in a any breach of convention rights. 3.1.3 Equality Act 2010 This application has been determined with regard to the Council’s duties and obligations under the Equality Act 2010. However it is considered that the recommendation made in this report is proportionate taking into account the 327
- Page 275 and 276: 2.7.1 Selby District Local Plan Pol
- Page 277 and 278: 2.8.6 The rear elevation of the dwe
- Page 279 and 280: 1. The development for which permis
- Page 281 and 282: 4 Conclusion As stated in the main
- Page 283 and 284: 283
- Page 285 and 286: This planning application is recomm
- Page 287 and 288: Please see note at start of agenda
- Page 289 and 290: 2.6.3 Local Plan policy H6 identifi
- Page 291 and 292: should be attached to these policie
- Page 293 and 294: 2.12.2 Having assessed the proposal
- Page 295 and 296: 3.1.2 Human Rights Act 1998 It is c
- Page 297 and 298: 297
- Page 299 and 300: This planning application is recomm
- Page 301 and 302: • The proposal places a property
- Page 303 and 304: 2.6.1 Policies YH1 and H1 of the Re
- Page 305 and 306: therefore considered that in respec
- Page 307 and 308: 2.11.3 The application site is loca
- Page 309 and 310: is proportionate, taking into accou
- Page 311 and 312: 311
- Page 313 and 314: Policies YH1, YH2, YH7, YH8, YH9, E
- Page 315 and 316: damage the environment (flora and f
- Page 317 and 318: 3. The principle of a dwelling in t
- Page 319 and 320: new buildings as inappropriate in G
- Page 321 and 322: have detrimental adverse affect on
- Page 323 and 324: 2.15.2 The NPPF paragraph 94 states
- Page 325: 2.21.2 The proposed developed is th
- Page 329 and 330: 329
- Page 331 and 332: Report Reference Number 2012/0479/F
- Page 333 and 334: 1.3.5 An application for conservati
- Page 335 and 336: 8. Nature conservation and protecte
- Page 337 and 338: 2.9.7 NPPF, Paragraph 200, states p
- Page 339 and 340: 2.12.2 The NPPF paragraph 94 states
- Page 341 and 342: the demolition and construction pha
- Page 343 and 344: INFORMATIVE: An explanation of the
- Page 345 and 346: 3.1.2 Human Rights Act 1998 It is c
- Page 347 and 348: Report Reference Number 2012/0443/F
- Page 349 and 350: edrooms in the care home accommodat
- Page 351 and 352: 1.4.8 Yorkshire Wildlife Trust The
- Page 353 and 354: 2.8.3 The Local Planning Authority
- Page 355 and 356: It is therefore concluded that the
- Page 357 and 358: uildings shall be occupied or broug
- Page 359 and 360: APPENDIX 1 The Town and Country Pla
- Page 361 and 362: Sustainability Given that the propo
- Page 363 and 364: covering being artificial slate. Th
- Page 365 and 366: COUNTY ECOLOGIST It is recommended
- Page 367 and 368: ASSESSMENT The principal issues to
- Page 369 and 370: continually deteriorating building.
- Page 371 and 372: The proposed development would invo
- Page 373 and 374: The Landscape Assessment of the dis
- Page 375 and 376: The submitted bat report states tha
04. The site shall be developed <strong>with</strong> separate systems of drainage for foul <strong>and</strong><br />
surface water on <strong>and</strong> off site.<br />
Reason:<br />
In the interest of satisfactory <strong>and</strong> sustainable drainage<br />
05. No piped discharge of surface water from the application site shall take place<br />
until works to provide a satisfactory outfall for surface water have been<br />
completed in accordance <strong>with</strong> details to be submitted to <strong>and</strong> approved by the<br />
local planning authority before development commences.<br />
Reason:<br />
To ensure that the site is properly drained <strong>and</strong> surface water is not<br />
discharged to the foul sewerage system which will prevent overloading<br />
06. There shall be no excavation or other groundworks, except for investigative<br />
works, or the depositing of material on the site until the access(es) to the site<br />
have been set out <strong>and</strong> constructed in accordance <strong>with</strong> the published<br />
Specification of the Highway Authority <strong>and</strong> the following requirements:<br />
(i)(a) The access shall be formed to give a minimum carriageway width of<br />
3.2 metres, <strong>and</strong> that part of the access road extending 6 metres into the site<br />
shall be constructed in accordance <strong>with</strong> St<strong>and</strong>ard Detail number E6.<br />
(ii) Any gates or barriers shall be erected a minimum distance of 6 metres<br />
back from the carriageway of the existing highway <strong>and</strong> shall not be able to<br />
swing over the existing or proposed highway.<br />
(iii) Provision shall be made to prevent surface water from the site/plot<br />
discharging onto the existing or proposed highway in accordance <strong>with</strong> the<br />
Specification of the Local Highway Authority.<br />
All works shall accord <strong>with</strong> the approved details.<br />
Reason:<br />
In accordance <strong>with</strong> policy number <strong>and</strong> to ensure a satisfactory means of<br />
access to the site from the public highway in the interests of vehicle <strong>and</strong><br />
pedestrian safety <strong>and</strong> convenience.<br />
INFORMATIVE<br />
You are advised that a separate licence will be required from the Highway<br />
Authority in order to allow any works in the adopted highway to be carried<br />
out. The ‘Specification for Housing <strong>and</strong> Industrial Estate Roads <strong>and</strong> Private<br />
Street Works’ published by North Yorkshire County Council, the Highway<br />
Authority, is available at the County Council’s offices. The local office of the<br />
Highway Authority will also be pleased to provide the detailed constructional<br />
specification referred to in this condition.<br />
07. There shall be no access or egress by any vehicles between the highway<br />
<strong>and</strong> the application site (except for the purposes of constructing the initial site<br />
326