Agenda with Maps and Applications (21Mb) - pdf - Selby District ...
Agenda with Maps and Applications (21Mb) - pdf - Selby District ... Agenda with Maps and Applications (21Mb) - pdf - Selby District ...
Reason: In order to comply with the provisions of Section 51 of the Planning and Compulsory Purchase Act 2004. 02. Prior to the commencement of the development hereby approved, a scheme for the disposal of foul and surface waters within the site shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved scheme. Reason: To prevent groundwater pollution and to reduce the risk of flooding from overland flows in accordance with policy ENV2 (A) of the Selby District Local Plan 03. Prior to the commencement of the development hereby approved, details of the materials to be used in the construction of the exterior walls and roof(s) of the development shall be submitted to and approved in writing by the Local Planning Authority, and only the approved materials shall be utilised. Reason: In the interests of visual amenity and in order to comply with Policy ENV1 of the Selby District Local Plan. 04. The development hereby permitted shall be carried out in accordance with drawing numbers 2067/1, 2067/2, 2067/3 and 2067/4. Reason: For the avoidance of doubt and in the interests of proper planning. 3. Legal/Financial Controls and other Policy matters 3.1 Legal Issues 3.1.1 Planning Acts This application has been determined in accordance with the relevant planning acts. 3.1.2 Human Rights Act 1998 It is considered that a decision made in accordance with this recommendation would not result in a any breach of convention rights. 3.1.3 Equality Act 2010 This application has been determined with regard to the Council’s duties and obligations under the Equality Act 2010. However it is considered that the recommendation made in this report is proportionate taking into account the conflicting matters of the public and private interest so that there is no violation of those rights. 3.2 Financial Issues 3.2.1 Financial issues are not material to the determination of this application. 4. Conclusion 4.1 As stated in the main body of the report. 5. Background Documents 236
5.1 Planning Application file reference 2012/0401/FUL and associated documents. Contact Officer: Joe O’Sullivan (Acting Lead Officer Planning) Appendices: None 237
- Page 185 and 186: countryside. The authority will nee
- Page 187 and 188: 1.4.20 Ramblers' Association No res
- Page 189 and 190: - Carousel Walk being opened up int
- Page 191 and 192: - Time frame for development up to
- Page 193 and 194: 2.7 Key Issues • Village Design S
- Page 195 and 196: 2.8.10 Policy H2A was clear that th
- Page 197 and 198: Elmet as being one of the most sust
- Page 199 and 200: an assessment of the cumulative imp
- Page 201 and 202: • Adequate facilities are provide
- Page 203 and 204: 2.9.31 As such the scheme is consid
- Page 205 and 206: • A linear belt of green space re
- Page 207 and 208: The proposals are therefore conside
- Page 209 and 210: watercourses. Furthermore flow atte
- Page 211 and 212: granted subject to conditions to pr
- Page 213 and 214: is in “outline” form details of
- Page 215 and 216: protected during the construction s
- Page 217 and 218: In light of the above, Officers wou
- Page 219 and 220: 2.22.13 The scheme does not include
- Page 221 and 222: Objectors have raised concerns rela
- Page 223 and 224: would provide financial contributio
- Page 225 and 226: 225
- Page 227 and 228: Report Reference Number: 2012/0401/
- Page 229 and 230: land adjacent to units 11-14 on the
- Page 231 and 232: 2.5.1 Please see note at start of a
- Page 233 and 234: 2.8.2 Policy EMP9 of the local plan
- Page 235: contamination or other environmenta
- Page 239 and 240: 239
- Page 241 and 242: Having reviewed the revised scheme
- Page 243 and 244: 1.4 Consultations 1.4.1 Yorkshire W
- Page 245 and 246: Policy H6: Policy ENV1: Policy ENV2
- Page 247 and 248: ungalow to the south. To the east o
- Page 249 and 250: that shall first be submitted to an
- Page 251 and 252: 251
- Page 253 and 254: Report Reference Number: 2011/1049/
- Page 255 and 256: 1.4.6 Yorkshire Wildlife Trust - No
- Page 257 and 258: 2.6.1 Policies Y1, YH5, H1, H2 and
- Page 259 and 260: 2.7.9 Consequently, subject to the
- Page 261 and 262: acceptable in highway safety terms
- Page 263 and 264: uilding 4 or more units being requi
- Page 265 and 266: The part of the access extending 6
- Page 267 and 268: 4. Conclusion 4.1 As stated in the
- Page 269 and 270: 269
- Page 271 and 272: This planning application is recomm
- Page 273 and 274: • Policy YH1: Overall approach an
- Page 275 and 276: 2.7.1 Selby District Local Plan Pol
- Page 277 and 278: 2.8.6 The rear elevation of the dwe
- Page 279 and 280: 1. The development for which permis
- Page 281 and 282: 4 Conclusion As stated in the main
- Page 283 and 284: 283
- Page 285 and 286: This planning application is recomm
5.1 Planning Application file reference 2012/0401/FUL <strong>and</strong> associated documents.<br />
Contact Officer: Joe O’Sullivan (Acting Lead Officer Planning)<br />
Appendices: None<br />
237