l<strong>and</strong> adjacent to units 11-14 on the Bypass Industrial Estate) <strong>with</strong>out complying <strong>with</strong><br />

condition 3 which relates to the size of the floor area on the 30 th June 2006.<br />

1.3.3 Application 2007/0983/REM approved the reserved matters for the erection of 3No.<br />

Industrial units (B1, B2 <strong>and</strong> B8) on the l<strong>and</strong> adjacent to units 11-14 on the Bypass<br />

Industrial Estate on the 6 th March 2008.<br />

1.3.4 On the 01.05.2008 application reference 2008/0325/FUL for the erection of a<br />

portakabin for staff welfare use on the l<strong>and</strong> adjacent to units 11-14 on the Bypass<br />

Industrial Estate was approved<br />

1.3.5 On the 12.11.2008 application reference 2008/1032/FUL for the erection of a<br />

portakabin for staff welfare use on the l<strong>and</strong> adjacent to units 11-14 on the Bypass<br />

Industrial Estate was approved<br />

1.4 Consultations<br />

1.4.1 Sherburn In Elmet Parish Council<br />

No objections<br />

1.4.2 <strong>Selby</strong> Area Internal Drainage Board<br />

The site is <strong>with</strong>in the <strong>Selby</strong> Area Internal Drainage Board’s district but not close to<br />

watercourses maintained by them.<br />

Details on the application indicate that surface water is to be directed to an existing<br />

surface water main. The Council will need to be satisfied that the existing main has<br />

sufficient capacity to accommodate all additional flows on completion of the<br />

development. Also the Council will need to be satisfied that all systems downstream<br />

from the main river have sufficient capacity.<br />

In this respect it is further noted the discharge from the mains is via a pumped<br />

system into Mill Dyke. The watercourse is the main river <strong>and</strong> the responsibility of<br />

the Environment Agency.<br />

1.4.3 Highways<br />

No objections<br />

1.4.4 Environment Agency<br />

No objections but provide advice for the applicants relating to the requirement to<br />

obtain permission from the Agency for any works <strong>with</strong>in 8m of Mill Dyke, which is<br />

classified as a main river, the benefits of Sustainable Urban Drainage Systems <strong>and</strong><br />

the desire to maintain an 8m buffer between any development <strong>and</strong> the river bank in<br />

order to provide a wildlife buffer zone. The advice issued by the Environment<br />

Agency on these matters has been added as an informative.<br />

1.4.4 Sherburn In Elmet Aerodrome<br />

No response received to date.<br />

1.5 Publicity<br />