two years from the final approval of the reserved matters or, in the<br />

case of approval on different dates, the final approval of the last<br />

such matter to be approved.<br />

Reason: In order to comply <strong>with</strong> the provisions of Section 51 of the<br />

Planning <strong>and</strong> Compulsory Purchase Act 2004.<br />

2. Approval of the details of the (a) appearance, (b) l<strong>and</strong>scaping, (c)<br />

layout <strong>and</strong> (d) scale (hereinafter called 'the reserved matters') shall<br />

be obtained from the Local Planning Authority in writing before any<br />

development is commenced.<br />

Reason: This is an outline permission <strong>and</strong> these matters have been<br />

reserved for the subsequent approval of the Local Planning<br />

Authority, <strong>and</strong> as required by Section 92 of the Town <strong>and</strong> Country<br />

Planning Act 1990.<br />

3. No development shall commence until details of the materials to be<br />

used in the construction of the exterior walls <strong>and</strong> roof(s) of the<br />

development hereby approved; have been submitted to <strong>and</strong><br />

approved in writing by the Local Planning Authority, <strong>and</strong> only the<br />

approved materials shall be utilised.<br />

Reason: In the interests of visual amenity <strong>and</strong> in order to comply<br />

<strong>with</strong> Policies ENV1 of the <strong>Selby</strong> <strong>District</strong> Local Plan.<br />

4. Prior to the demolition, site preparation <strong>and</strong> construction work<br />

commencing, a scheme to minimise the impact of noise, vibration,<br />

dust <strong>and</strong> dirt on residential properties <strong>with</strong>in close proximity to the<br />

site, shall be submitted to <strong>and</strong> approved in writing by the Local<br />

Planning Authority. The agreed scheme shall be employed during<br />

the demolition, site preparation <strong>and</strong> construction phases of the<br />

development.<br />

Reason: To protect the amenity of the area, the environment <strong>and</strong><br />

local residents from noise pollution in accordance <strong>with</strong> Policies<br />

ENV1 <strong>and</strong> ENV2 of the <strong>Selby</strong> <strong>District</strong> Local Plan <strong>and</strong> the NPPF.<br />

5. Unless otherwise approved in writing by the Local Planning<br />

Authority the development permitted by this planning permission<br />

shall be carried out in complete accordance <strong>with</strong> the<br />

recommendations set out in the Flood Risk Assessment dated April<br />

2012 by JBA Consulting <strong>and</strong> should follow the measures as<br />

detailed in the Flood Risk Assessment by Dacres Commercial<br />

dated April 2012 (Chapter 9 of the Environmental Statement) <strong>and</strong><br />

the following mitigation measures detailed <strong>with</strong>in the FRA:<br />

- Finished floor levels (FFL) are set no lower than 8.35m<br />

above Ordnance Datum (AOD). Finished Floor Levels of<br />

160