02.07.2014 Views

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

allocated for housing purposes. It has not been determined who the<br />

Registered Social L<strong>and</strong>lord (RSL) would be on this site <strong>and</strong> it is<br />

immaterial whether they are based locally or not.<br />

2.25.5 Site Levels<br />

Concern has been raised regarding the levels on parts of the site being<br />

higher than the existing properties, it can be conditioned that any<br />

subsequent reserved matters application includes full existing <strong>and</strong><br />

proposed site levels <strong>and</strong> finished floor levels related to ordnance datum<br />

<strong>and</strong> that site sections be provided where appropriate so that a full<br />

assessment can be made as to the relationship between existing <strong>and</strong><br />

proposed properties.<br />

2.25.6 High School<br />

Concerns were raised that the high school cannot support more pupils<br />

<strong>and</strong> the school is in need of modernising. North Yorkshire County<br />

Council Education were consulted on the application <strong>and</strong> whilst they<br />

have requested contributions towards the Primary School they have<br />

made no such case for the High School.<br />

2.25.7 Alignment of Planning <strong>Applications</strong> <strong>and</strong> Prematurity<br />

2.24.4 Concerns have been raised regarding the plans being aligned <strong>and</strong> it<br />

should be noted that all three residential schemes for the Phase 2 site<br />

have been referred to the same committee meeting for determination to<br />

allow this. In terms of prematurity The Planning System General<br />

Principles makes it clear that in some circumstances it may be<br />

justifiable to refuse planning permission on grounds of prematurity<br />

where the cumulative effect of development would be so significant that<br />

granting permission could prejudice a Development Plan Document<br />

which is being prepared. This has not been revoked or replaced by the<br />

NPPF <strong>and</strong> as such is still relevant. The NPPF Paragraph 14 states<br />

that where development proposals accord <strong>with</strong> the development plan<br />

they should be granted <strong>with</strong>out delay. If permission is granted it would<br />

determine issues such as scale, location <strong>and</strong> phasing of development<br />

in Sherburn. In this instance the Phase 2 housing site is allocated<br />

under the 2005 Local Plan, has been allocated for housing for a<br />

considerable length of time <strong>and</strong> as such it is inevitable that there will be<br />

housing development on this site. The Site Allocations DPD is at a<br />

very early state <strong>and</strong> the Preferred Options will need to be re-written in<br />

light of the Inspector’s recommendations. Having taken all of these<br />

issues into account refusal on prematurity grounds cannot, therefore,<br />

be justified <strong>and</strong> does not outweigh the need for this development now.<br />

2.25.8 House Prices<br />

Objectors have raised concerns in terms of the application on the<br />

resultant impact on the value of their properties. This is not a material<br />

157

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!