02.07.2014 Views

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

Agenda with Maps and Applications (21Mb) - pdf - Selby District ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.25.1 A series of other matters have been raised through the consultation<br />

process, these are summarised <strong>and</strong> assessed in the following section.<br />

2.25.2 Phasing <strong>and</strong> Construction time<br />

Objectors have raised concerns relating to the length of the build. The<br />

application includes a Phasing plan for the 100 unit <strong>and</strong> 498 unit<br />

schemes <strong>and</strong> states that Phase 1A would be the western section of the<br />

site <strong>with</strong> Phase 1B being the 100 unit site, then Phases 2, 3 <strong>and</strong> 4<br />

would be built across from west to east until they met up <strong>with</strong> the 100<br />

unit scheme. The developers have indicated that it is anticipated to<br />

commence on site May 2013. The proposed build rate would be<br />

anticipated to be approximately 50 dwellings per year per developer<br />

therefore the development should be completed by 2020. The phasing<br />

plan can be conditioned.<br />

2.25.3 Developer Behaviour<br />

Objectors have raised concerns in terms of the potential for the Phase<br />

2 site to be left dormant, as was the case on the Phase 1 site, as a<br />

result of changes in the economic climate <strong>and</strong> have asked that an 18<br />

month completion date be put on the development.<br />

Officers note that the recent recession led to many sites being dormant<br />

for periods <strong>and</strong> the housing market <strong>and</strong> economic conditions both of<br />

which are out of the Council’s or the developers direct control would<br />

dictate the speed in which the development would be built out <strong>and</strong> it<br />

would be unreasonable <strong>and</strong> unnecessary to put an 18 month<br />

completion date on the development.<br />

2.25.4 Housing need/Affordable housing<br />

In summary objectors have questioned the need for more housing in<br />

the village in terms of the needs of those who live there now, in the<br />

context of a large number of properties already on the market in the<br />

village <strong>and</strong> given that there are so many houses under construction<br />

already. However the housing market operates as part of the wider<br />

economy <strong>and</strong> as such housing requirements are a result of population<br />

changes, economic patterns <strong>and</strong> market forces. The level of housing<br />

required to be provided, the identification of the allocations <strong>with</strong>in the<br />

2005 Local Plan, the release <strong>and</strong> extent of units identified as a result of<br />

the release of the Phase 2 sites <strong>with</strong>in the <strong>District</strong> has been part of<br />

consideration through the Local Plan, the RSS <strong>and</strong> consideration of a<br />

detailed evidence base. As such the case for the level of development<br />

has been assessed <strong>with</strong>in earlier sections of this Report. Objectors<br />

have raised the need for affordable housing <strong>and</strong> the fact that<br />

Broadacres (RSL) who have taken on affordable housing <strong>with</strong>in the<br />

<strong>District</strong> are not based locally, as mentioned in the main body of the<br />

report <strong>and</strong> through Policy Officers responses there is evidence of a<br />

housing need in the district <strong>and</strong> for affordable housing provision <strong>and</strong><br />

the proposed development would assist in meeting this need on a site<br />

156

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!