01.07.2014 Views

PRT CTRL Integrated Controller Reference Manual

PRT CTRL Integrated Controller Reference Manual

PRT CTRL Integrated Controller Reference Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FG001 Name<br />

All Floors<br />

To scroll floor groups by name use the [] and [] keys. To modify or enter a new name for<br />

the selected floor group use the keypad as explained in section Entering Text and Names on<br />

Page 406 and press [ENTER].<br />

By default the floor group name will be prefixed by an '*' this indicates that the name is an<br />

editable name in the system.<br />

Operating Schedule<br />

The operating schedule for the floor group determines when the floor group is valid and if it<br />

will use a secondary floor group when the operating schedule is not valid. A schedule is a<br />

series of times and days that can be programmed to prevent the operating of functions based<br />

on a 7 day week and 24 hour clock. For more information on the programming of the<br />

schedule refer to the Schedule Programming section on Page 344.<br />

FG001 Schedule<br />

None<br />

Use the [1] and [3] keys to scroll the schedule selection and press [ENTER] to select the<br />

schedule displayed. For more information about the list control data entry refer to the section<br />

List Control Data Entry on Page 406.<br />

Secondary Floor Group<br />

A secondary floor group can be selected that will be used when the schedule of the floor<br />

group that is programmed is not valid. The schedule of the secondary floor group must be<br />

valid or set to none. The secondary floor group allows very powerful floor group controls to be<br />

placed on users during certain times of the day preventing access to certain doors.<br />

FG001 Secondary<br />

None<br />

Use the [1] and [3] keys to scroll the secondary floor group selection and press [ENTER] to<br />

select the floor group displayed. For more information about the list control data entry refer<br />

to the section List Control Data Entry on Page 406. Programming a secondary floor group that<br />

uses the current area group being edited will perform no function.<br />

Floor Group Assignment Blocks 1 to 16<br />

The floor group assignment blocks assign a floor to the group that is being programmed. Each<br />

block is 8 floor and there 16 floor blocks that can be programmed.<br />

FG001 Block 1<br />

[12345678]<br />

To modify the block setting options, follow the settings as explained in section Entering Data<br />

Options on Page 409. Use the relevant key from 1 to 8 to toggle the state of the option.<br />

Pressing the [ENTER] key will move you to the next block in the floor group until you return<br />

to the floor group selection.<br />

69 Protégé <strong>Integrated</strong> System <strong>Controller</strong> <strong>Reference</strong> <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!