01.07.2014 Views

PRT CTRL Integrated Controller Reference Manual

PRT CTRL Integrated Controller Reference Manual

PRT CTRL Integrated Controller Reference Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Disabled the period will not operate on Friday.<br />

Option 6 - Saturday<br />

Enabled the period will operate on Saturday.<br />

Disabled the period will not operate on Saturday.<br />

Option 7 - Sunday<br />

Enabled the period will operate on Sunday.<br />

Disabled the period will not operate on Sunday.<br />

Option 8 - Reserved<br />

Reserved.<br />

Reserved.<br />

It is recommended not to enable/disable or modify the settings of reserved options.<br />

Period One Holiday Group<br />

There are eight holiday groups that can be assigned to a schedule. A holiday when active will<br />

have a holiday group(s) associated with it. If the period does not have any holiday group<br />

settings then it will not function on the day that the holiday is valid. The process is an and<br />

process, that is if any of the holiday group options are valid and any of the period holiday<br />

group settings are in common with the programmed value the schedule will operate. Each<br />

option select value selects the appropriate holiday group.<br />

SC001 P1 Hols<br />

[--------]<br />

To modify options, use the keypad as explained in section Entering Data Options on Page 409.<br />

Option 1 - Holiday Group One<br />

Enabled the period will operate if a holiday is valid and has the group one<br />

option set.<br />

Disabled the period will not operate if the holiday group one is active.<br />

Option 2 - Holiday Group Two<br />

Enabled the period will operate if a holiday is valid and has the group two<br />

option set.<br />

Disabled the period will not operate if the holiday group two is active.<br />

Option 3 - Holiday Group Three<br />

Enabled the period will operate if a holiday is valid and has the group three<br />

option set.<br />

Disabled the period will not operate if the holiday group three is active.<br />

Protégé <strong>Integrated</strong> System <strong>Controller</strong> <strong>Reference</strong> <strong>Manual</strong><br />

348

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!