<strong>Explor<strong>in</strong>g</strong> <strong>the</strong> <strong>Unknown</strong> 609<br />

Mueller’s approach was strongly resisted by both <strong>the</strong> Marshall Space Flight Center and <strong>the</strong><br />

Manned Spacecraft Center, but Mueller, who soon after this memorandum was written<br />

became Associate Adm<strong>in</strong>istrator for Manned Space Flight, was a strong-willed <strong>in</strong>dividual<br />

whose views eventually prevailed. <strong>The</strong> “all-up” decision is regarded by many as key to <strong>the</strong><br />

United States be<strong>in</strong>g able to reach <strong>the</strong> Moon “before this decade is out.”<br />

Document II-36<br />

APOLLO SCHEDULE AND COST EVALUATION<br />

OBJECTIVES<br />

• PROVIDE A REALISTIC ESTIMATE WITH MODERATE CONFIDENCE<br />

(~50%) OF THE EARLIEST DATE FOR THE FIRST LUNAR LANDING<br />

ATTEMPT<br />

• PROVIDE A CORRESPONDING PROGRAM COST ESTIMATE<br />

• ASSESS TIME AND COST INCREASES REQUIRED TO RAISE<br />

CONFIDENCE TO A HIGH LEVEL (~90%)<br />

• ESTIMATE ADDITIONAL COSTS OF WORK WHICH COULD<br />

INCREASE CONFIDENCE LEVEL OF EARLIEST DATE<br />

APOLLO SCHEDULE AND COST EVALUATION GROUND RULES<br />

• NO BASIC CHANGE IN TECHNICAL CONCEPT OR APPROACH<br />

• PERSONNEL CEILING FIXED AT FY 65 LEVEL<br />

• FY 64 AND FY 65 FUNDING AT GUIDLINE LEVELS<br />

• FY 66 AND SUBSEQUENT R&D FUNDING CEILING OF $3.00 BILLION<br />

PER YEAR (INCLUDES ADVANCED PROGRAM)<br />

• CONTINUATION OF DX PRIORITY<br />

• NORMAL PROCUREMENT LEAD TIMES<br />

• TWO SCHEDULED FLIGHTS REQUIRED FOR ACCOMPLISHMENT<br />

OF EACH FLIGHT MISSION<br />

• MAXIMUM FREQUENCY FOR MANNED FLIGHTS OF FOUR PER YEAR<br />

• INFLATION FACTORS NOT CONSIDERED<br />

CONCLUSIONS AND RECOMMENDATIONS<br />

• If fund<strong>in</strong>g constra<strong>in</strong>ts assumed here<strong>in</strong> prevail, lunar land<strong>in</strong>g cannot likely<br />

be atta<strong>in</strong>ed with<strong>in</strong> <strong>the</strong> decade with acceptable risk.<br />

• First attempt to land men on moon is likely about late 1971 under study<br />

guidel<strong>in</strong>e fund<strong>in</strong>g and constra<strong>in</strong>ts.<br />

• Program cost through <strong>in</strong>itial lunar land<strong>in</strong>g attempt will approximate 24<br />

billion dollars (R&D Direct only)<br />

• Progress on program <strong>in</strong>adequate to provide schedule associated with<br />

90% confidence.<br />

• Projection of lunar land<strong>in</strong>g attempt on early manned Saturn V unrealistic<br />

<strong>in</strong> terms of probable technical problems.