592<br />

Project Apollo: Americans to <strong>the</strong> Moon<br />

first stage would be necessary. (3) Concurrent development would have to be<br />

<strong>in</strong>itiated on alternative components and subsystems to give better assurance that<br />

schedules could be met. (4) <strong>The</strong> current contractor overtime rate and amount of<br />

double and triple shift<strong>in</strong>g would be markedly <strong>in</strong>creased and extensive overtime and<br />

multiple shift <strong>in</strong>g would be necessary. (5) A crash contractor manpower buildup and<br />

heavy NASA effort would be required to reschedule and execute <strong>the</strong> new plan.<br />

<strong>The</strong> runout cost from FY 1965 through FY 1967 for <strong>the</strong> late 1966 target date<br />

is estimated to be 10-15% higher than <strong>the</strong> funds required for a late 1967 date. <strong>The</strong><br />

funds required <strong>in</strong> FY 1963 and FY 1964 to meet this schedule are approximately $900<br />

million and $800 million more respectively than <strong>the</strong> current FY 1963 availability and<br />

FY 1964 budget request. <strong>The</strong> total would be distributed as follows:<br />

(In Billions)<br />

1963 1964<br />

Spacecraft and Flight Missions $1.1 $1.9<br />

Development of Launch Vehicle and Propulsion<br />

Systems<br />

Facilities, Launch Operations, Integration and<br />

Checkout, Systems Eng<strong>in</strong>eer<strong>in</strong>g and Aerospace<br />

Medic<strong>in</strong>e<br />

1.0 1.2<br />

.8 1.1<br />

$2.9 $4.2<br />

Summary<br />

On <strong>the</strong> basis of our current analysis, we believe that we can ma<strong>in</strong>ta<strong>in</strong> <strong>the</strong><br />

late 1967 target date for <strong>the</strong> manned lunar land<strong>in</strong>g with $3.7 billion <strong>in</strong> FY 1963<br />

funds and $6.2 billion <strong>in</strong> FY 1964. A budget <strong>in</strong>crease of $427 million to $4.1 billion<br />

<strong>in</strong> FY 1963 and $6.2 billion <strong>in</strong> FY 1964 is required for a mid-1967 target date; and<br />

total resources of $4.6 billion <strong>in</strong> FY 1963 and $7.0 billion <strong>in</strong> FY 1964 are required<br />

for a late 1966 target date.<br />

Let me emphasize aga<strong>in</strong> <strong>the</strong> prelim<strong>in</strong>ary nature of our conclusion that a<br />

target date of late 1966 could be established for <strong>the</strong> manned lunar land<strong>in</strong>g with <strong>the</strong><br />

<strong>in</strong>dicated fund<strong>in</strong>g levels. This conclusion is not based on detailed programmatic<br />

plans. With this qualification, however, we are prepared to place <strong>the</strong> manned<br />

lunar land<strong>in</strong>g program on an all-out crash basis aimed at <strong>the</strong> 1966 target date if<br />

you should decide this is <strong>in</strong> <strong>the</strong> national <strong>in</strong>terest.<br />

Respectfully yours,<br />

[Signed James E. Webb]<br />

James E. Webb<br />

Adm<strong>in</strong>istrator