Sheri L. Moreno of General Electric Company Speaker 15: 5<br />

Phase 1: Findings — Fish<br />

• PCB levels in Upper Hudson Fish increased<br />

— 500% increase in PCB levels in pumpkinseed<br />

and forage fish collected close to dredging<br />

(Thompson Island Pool/Fort Edward)<br />

— 40%-65% increase in PCB levels in<br />

same species 40 miles south of<br />

dredging at Albany<br />

11<br />

The Path Forward: Finding Right Balance<br />

• GE will work with EPA to design an improved Phase 2<br />

• Use Phase 1 data to identify “tipping point” where dredging sends more PCBs downstream than no<br />

dredging<br />

• Set “tipping point” as maximum limit on mass of PCBs that dredging can send downstream<br />

• Calculate mass of sediments and PCBs that can be removed within that limit, assuming the rate of<br />

resuspension experienced during Phase 1<br />

• Prioritize dredging areas to target PCBs available to fish (to obtain maximum benefit)<br />

• Dredge until maximum limit on mass of PCBs is reached<br />

• Reduce inefficient redredging<br />

• Continue to comply with federal drinking water limit<br />

• Complete work in 5 years, as EPA promised, and accelerate river recovery<br />

• Achieve EPA long-term environmental goals and minimize immediate impacts<br />

17<br />

Law Seminars International | Natural Resource Damages | 07/15/10 in <strong>Santa</strong> <strong>Fe</strong>, NM