phase 5: northwest campus<br />
development<br />
5b<br />
site 5a:<br />
Remove the existing commuter lot to<br />
the north of the Agricultural Heritage<br />
Museum to support the development<br />
of an upper-division and graduate<br />
student neighborhood.<br />
5e<br />
5b<br />
5d<br />
5c<br />
site 5b:<br />
Pave the existing gravel lots<br />
northwest of the football stadium for<br />
use as commuter parking.<br />
site 5c:<br />
Construct a new asphalt surfaced<br />
commuter parking lot north of<br />
Couglin-Alumni Stadium and west of<br />
the softball field.<br />
5a<br />
site 5d:<br />
Redesignate the Coughlin-Alumni<br />
Stadium parking lot to commuter<br />
parking.<br />
site 5e:<br />
Construct new gravel lot for free<br />
parking north of the Animal Science<br />
Complex.<br />
figure 3.18: parking implementation phase 5<br />
35