2025 Design & Master Plan - South Dakota State University
2025 Design & Master Plan - South Dakota State University
2025 Design & Master Plan - South Dakota State University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
phase 1: academic core expansion<br />
site 1a:<br />
Redesignate parking lot west of the<br />
Seed House to commuter parking.<br />
site 1b:<br />
Resurface and expand the parking<br />
lots between Alfred Dairy Science Hall<br />
and the Animal Science Complex for<br />
reserved parking.<br />
site 1c:<br />
Remove parking lot between Berg<br />
Agricultural Hall and the Intramural<br />
Building to accommodate a new<br />
facility.<br />
1a<br />
1b<br />
1b<br />
1d<br />
site 1d:<br />
Redesignate a portion of the<br />
Coughlin-Alumni Stadium lot to<br />
commuter parking.<br />
site 1e:<br />
Convert parking lot east of the<br />
<strong>University</strong> Student Union to pay<br />
lot for visitor parking.<br />
1c<br />
1e<br />
figure 3.14: parking implementation phase 1<br />
31