30.06.2014 Views

2025 Design & Master Plan - South Dakota State University

2025 Design & Master Plan - South Dakota State University

2025 Design & Master Plan - South Dakota State University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.6 implementation<br />

The implementation phases outlined in this section represent significant<br />

changes to the physical campus structure in support of the immediate and<br />

long-term vision of the university’s <strong>2025</strong> Facility <strong>Master</strong> <strong>Plan</strong>.<br />

Within the improvements outlined, the redistribution of campus parking is the<br />

key driver for initiating the transition to a more pedestrian-oriented campus<br />

environment supported by green spaces and pedestrian corridors. It is<br />

important that in the implementation of these projects, consideration is given<br />

to the incorporation of elements that will result in the creation of a campus<br />

environment that is user-friendly, welcoming, easily navigable, and safe for<br />

visitors, students, faculty and staff. The planning principles outlined earlier in<br />

the document are to be the backbone for the campus development indicated<br />

in these phases.<br />

The timeline for implementation of the master plan can be impacted by a<br />

variety of factors such as funding, enrollment trends and other unforeseen<br />

university needs. The implementation plan lays out a set of phases, likely<br />

occurring over the next 10 to 15 years. The phases of the parking projects<br />

are organized in a sequence that meets the projected parking needs of the<br />

campus community through each development.<br />

figure 3.13: concept view of 13th avenue campus entry<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!