Bachat Lamp Yojana - Bureau of Energy Efficiency
Bachat Lamp Yojana - Bureau of Energy Efficiency
Bachat Lamp Yojana - Bureau of Energy Efficiency
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CDM based CFL<br />
Lighting Scheme<br />
“<strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong>”<br />
Initiated by
Introduction to BEE<br />
• <strong>Energy</strong> Conservation Act, 2001, overcomes some<br />
market barriers by enabling:<br />
– Setting <strong>of</strong> minimum energy standards for, and<br />
affixing energy-consumption labels on<br />
appliances and equipment<br />
– Promulgation <strong>of</strong> <strong>Energy</strong> Conservation Building<br />
Codes<br />
– <strong>Energy</strong> use monitoring, verification and<br />
reporting by large energy users, and the<br />
establishment <strong>of</strong> energy consumption norms for<br />
these consumers<br />
2
Introduction to BEE<br />
• BEE and SDAs set up to promote:<br />
– Demand-side management by distribution<br />
companies<br />
– Enhancing energy conservation in existing<br />
buildings, especially through <strong>Energy</strong> Service<br />
Companies (ESCOs)<br />
– Outreach and awareness programmes<br />
3
National Mission for Enhanced <strong>Energy</strong> <strong>Efficiency</strong>- 4<br />
New Initiatives<br />
‣ A market based mechanism to enhance cost<br />
effectiveness <strong>of</strong> improvements in energy<br />
efficiency in energy-intensive large industries and<br />
facilities, through certification <strong>of</strong> energy savings<br />
that could be traded. (Perform Achieve and Trade)<br />
‣ Accelerating the shift to energy efficient appliances<br />
in designated sectors through innovative measures<br />
to make the products more affordable. (Market<br />
Transformation for <strong>Energy</strong> <strong>Efficiency</strong>))<br />
4
National Mission for Enhanced <strong>Energy</strong> <strong>Efficiency</strong>- 4<br />
New Initiatives<br />
‣ Creation <strong>of</strong> mechanisms that would help finance<br />
demand side management programmes in all<br />
sectors by capturing future energy savings. (<strong>Energy</strong><br />
<strong>Efficiency</strong> Financing Platform (EEFP))<br />
‣ Developing fiscal instruments to promote energy<br />
efficiency namely Framework for <strong>Energy</strong> Efficient<br />
Economic Development (FEEED)<br />
5
<strong>Energy</strong> <strong>Efficiency</strong>– Action Plan - DSM Initiatives<br />
‣ <strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong> to promote energy efficient<br />
and high quality CFLs as replacement for<br />
incandescent bulbs in households.<br />
‣ Standards & Labeling Scheme targets high energy<br />
end use equipment and appliances to lay down<br />
minimum energy performance standards.<br />
‣ <strong>Energy</strong> Conservation Building Code (ECBC) sets<br />
minimum energy performance standards for new<br />
commercial buildings.<br />
.<br />
6
.<br />
<strong>Energy</strong> <strong>Efficiency</strong> – Action Plan<br />
DSM Initiatives<br />
‣ Agricultural and Municipal DSM targeting<br />
replacement <strong>of</strong> inefficient pumpsets, street<br />
lighting, etc.<br />
‣ Operationalising EC Act by Strengthening<br />
Institutional Capacity <strong>of</strong> State Designated Agencies<br />
(SDAs) : The scheme seeks to build institutional<br />
capacity <strong>of</strong> the newly created SDAs to perform their<br />
regulatory, enforcement and facilitative functions<br />
in the respective States.<br />
‣ <strong>Energy</strong> <strong>Efficiency</strong> Improvement in Small and<br />
Medium Enterprises (SMEs): To stimulate energy<br />
efficiency measures in 25 high energy consuming<br />
small and medium enterprise clusters.<br />
7
<strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong><br />
• Replace inefficient incandescent bulbs with CFLs for<br />
households only<br />
• Reduce price <strong>of</strong> CFL to that <strong>of</strong> incandescent bulbproject<br />
developer (CFL Manufacturer/ DISCOM)<br />
provides initial investment<br />
• Use CDM to recover balance cost<br />
• Monitor energy consumption reduction in a project<br />
area as outlined in AMS-II.J <strong>of</strong> CDM-EB<br />
• CERs generated after monitoring, validation and<br />
oversight <strong>of</strong> CDM Executive Board (CDM-EB) sold in<br />
international markets<br />
• Potential reduction in power consumption~6,000 -<br />
10,000 MW – XI plan target 4000 MW<br />
8
BLY Uses pCDM Approach<br />
The programme itself does<br />
not achieve the reductions,<br />
but provides the framework<br />
for emission reductions to<br />
occur through certified project<br />
activities<br />
9
BLY pCDM Process<br />
Plus<br />
Multiplication<br />
as short as<br />
3months.<br />
Minus<br />
Liability Risk<br />
in case <strong>of</strong><br />
failure<br />
Source: Tech. paper 120/07,ESMAP, World Bank, 2007<br />
10
Benefits <strong>of</strong> BLY<br />
Uses CDM Programme <strong>of</strong> Activities approach to<br />
‣Lower transaction costs<br />
‣Reduce time<br />
‣Capture an activity otherwise difficult /<br />
expensive under CDM<br />
‣Reduce risk to investors<br />
‣Simple monitoring without compromising CFL<br />
usage hours<br />
11
28 th May 2007–<br />
Announcement in<br />
chief ministers<br />
meeting chaired by<br />
Prime Minister<br />
BLY Chronology<br />
Aug to Dec 2007–<br />
Development <strong>of</strong> PoA<br />
DD based on<br />
AMS 046<br />
Mid 2008 PoA DD<br />
shifts to AMS IIC<br />
August 2008 BLY<br />
revised as per new<br />
CDM methodology<br />
AMS IIJ<br />
May June 2009<br />
PoA revised as per<br />
AMS IIJ DoE<br />
appointed for<br />
validation<br />
March 2009<br />
National<br />
Stakeholder<br />
Consultation<br />
February 2009–<br />
Official Launch <strong>of</strong> BLY<br />
PoA scheme<br />
12
BLY Role Players<br />
UNFCCC<br />
PoA<br />
SSC-CPA<br />
Supportin<br />
g Agency<br />
CDM-EB<br />
Registration &<br />
CER issuance<br />
BEE<br />
BLY PoA<br />
Managing<br />
Entity<br />
DISCOM<br />
assists investor<br />
in a BLY<br />
project<br />
e.g. Sample<br />
Survey Agency<br />
DOE<br />
Validation &<br />
Verification<br />
Investor<br />
invests into a<br />
BLY project<br />
13
Buyer in Annex I<br />
Country<br />
BLY Schematic<br />
PoA -Manager<br />
CDM EB<br />
Communication<br />
Validation /<br />
Verification<br />
Payment for CERs<br />
CERs sold<br />
Technically develops BLY<br />
scheme methodology and<br />
documents<br />
PoA<br />
approval<br />
DNA<br />
Annex I<br />
& II<br />
Safe<br />
disposal <strong>of</strong><br />
returned<br />
CFL<br />
CFL INVESTOR<br />
Fused CFL’s returned<br />
HOUSEHOLD<br />
Pays Rs 15 for new CFL<br />
Safe<br />
keeping <strong>of</strong><br />
replaced<br />
ICL lamp<br />
for<br />
inspection<br />
DISCOM<br />
Replaced ICL lamp<br />
•Procures long-life CFLs and distributes to<br />
households<br />
•Day-to-day monitoring; Verification<br />
survey to assess lamp failure rate<br />
Provides access to the<br />
households for installing CFLs<br />
Each BLY project ~ 600,000 CFLs,<br />
upto 4 CFLs per household<br />
400 million ICLs / annum replaceable,<br />
annually saving ~ 6000 MW<br />
CFL = Compact Florescent <strong>Lamp</strong><br />
ICL = Incandescent lamps<br />
BEE = <strong>Bureau</strong> <strong>of</strong> <strong>Energy</strong> <strong>Efficiency</strong><br />
DISCOM = Distribution Company<br />
DNA = Designated National<br />
Authority<br />
EB = Executive Board<br />
14
Role <strong>of</strong> BEE<br />
• Acts as overall PoA co-ordinator<br />
• Technically develops and shares the<br />
development <strong>of</strong> CDM methodology<br />
• Awareness and information<br />
• Inclusion <strong>of</strong> CPA-DDs under the PoA after<br />
validation<br />
• Facilitate verification <strong>of</strong> CERs and<br />
recommend their allocation to the investors<br />
15
Role <strong>of</strong> CFL Investor<br />
• Procures and distributes CFLs at a price comparable<br />
to GLS lamps.<br />
• Preparing CDM Programme Activity Design<br />
Documents (CPA-DDs) for CDM project and<br />
submitting them to BEE.<br />
• Collection <strong>of</strong> end-<strong>of</strong>-life CFLs and arranging for<br />
their safe disposal as per regulatory norms.<br />
• Operates and manage project on day-to-day basis<br />
16
Role <strong>of</strong> DISCOM<br />
• Provides access to Database <strong>of</strong> households to install<br />
CFLs<br />
• Assists in<br />
1. Selection <strong>of</strong> monitoring survey as required<br />
under AMS-II.J<br />
2. Distribution <strong>of</strong> CFL <strong>Lamp</strong>s in exchange <strong>of</strong><br />
incandescent lamps<br />
3. Safe keeping <strong>of</strong> replaced ICLs for<br />
independent inspection<br />
17
• AMS IIJ- Simplified M&V<br />
1. Deemed savings<br />
approach: 3.5 hours<br />
/ day/ CFL<br />
2. Periodic CFLs survey<br />
Monitoring & Verification<br />
Project area)<br />
Total area serviced by<br />
DISCOM<br />
MS-1<br />
MS-2<br />
MS<br />
= Monitoring Survey<br />
18
CFL Meter<br />
Pluggable meter for easy installation<br />
19
Metering Unit Specifications<br />
• Input: 150 – 300 V<br />
• Parameters measured<br />
– Supply Voltage – Average<br />
– <strong>Lamp</strong> Current – Average<br />
– Burning hours<br />
– <strong>Energy</strong> Consumed<br />
• Record storage interval – One switch on<br />
• Record Content – Time stamp, Volts, Current,<br />
Duration, <strong>Energy</strong><br />
• SMS Sending interval – At every switch on<br />
20
Meter Functioning (I)<br />
OFF ON<br />
When bulb will switch on, meter<br />
Values <strong>of</strong> voltage, current,<br />
will start recording the voltage,<br />
energy and switch on<br />
current,<br />
duration<br />
energy and time till it<br />
will be stored inside<br />
gets<br />
memory<br />
switch <strong>of</strong>f<br />
21
Meter Functioning (II)<br />
OFF ON<br />
As you switch on again, the<br />
recordings <strong>of</strong> previous sessions<br />
will be transmitted to server via<br />
SMS and the current recordings<br />
will start.<br />
22
Meter Functioning (III)<br />
Data from different meters from<br />
different locations is collected<br />
at centralised server / computer<br />
23
Meter Functioning (IV)<br />
V1<br />
I1<br />
V2<br />
I2<br />
…<br />
…<br />
Vn<br />
In<br />
Entire Data <strong>of</strong> every switch on<br />
session can be downloaded with<br />
cable connected to meter &<br />
laptop / hand Held Terminal.<br />
E1<br />
E2<br />
…<br />
En<br />
T1<br />
T2<br />
…<br />
Tn<br />
24
Requirements<br />
• DISCOM identifies BEE empanelled Investor<br />
• Tri-partite Agreement with DISCOM, Investor and<br />
BEE<br />
• Investor identifies long-life IS 15111 certified CFL<br />
supplier<br />
• Develop project as per BLY scheme templates<br />
25
Consumer<br />
Social Impact<br />
• CFLs at price <strong>of</strong> incandescent lamp (INR 15), to all<br />
households<br />
• Reduced peak load-shedding<br />
DISCOMs<br />
• Enhanced customer satisfaction<br />
Manufacturers / Investors<br />
• Creates employment<br />
26
Generating Utility<br />
Environmental Impact<br />
• Reduced GHG emissions<br />
Investor<br />
• Collection <strong>of</strong> Project CFLs at end-<strong>of</strong>-life<br />
• Contain potential mercury exposure,<br />
• Improves recyclability<br />
27
Progress In <strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong><br />
• 1 pilot project registered at UNFCCC on 26th Sept<br />
2008.<br />
• PDDs for Haryana , Andhra Pradesh, Maharashtra<br />
have been submitted to CDM Executive Board for<br />
registration.<br />
• 31 CFL manufacturers/Traders have been<br />
empanelled by BEE<br />
• 14 states have taken up steps towards<br />
implemetation <strong>of</strong> scheme in their respective<br />
DISCOM regions.<br />
28
• Contact Information:<br />
Enable energy efficiency<br />
…using CDM<br />
• <strong>Bureau</strong> <strong>of</strong> <strong>Energy</strong> <strong>Efficiency</strong><br />
(Govt <strong>of</strong> India, Ministry <strong>of</strong> Power)<br />
4 th Floor, Sewa Bhawan,R. K. Puram<br />
New Delhi- 110 066, India.<br />
• Tel: 011- 26179699<br />
• Fax: 011- 26178352<br />
• Email:vthakur@beenet.in<br />
• www.bee.gov.in<br />
29