29.06.2014 Views

Bachat Lamp Yojana - Bureau of Energy Efficiency

Bachat Lamp Yojana - Bureau of Energy Efficiency

Bachat Lamp Yojana - Bureau of Energy Efficiency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CDM based CFL<br />

Lighting Scheme<br />

“<strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong>”<br />

Initiated by


Introduction to BEE<br />

• <strong>Energy</strong> Conservation Act, 2001, overcomes some<br />

market barriers by enabling:<br />

– Setting <strong>of</strong> minimum energy standards for, and<br />

affixing energy-consumption labels on<br />

appliances and equipment<br />

– Promulgation <strong>of</strong> <strong>Energy</strong> Conservation Building<br />

Codes<br />

– <strong>Energy</strong> use monitoring, verification and<br />

reporting by large energy users, and the<br />

establishment <strong>of</strong> energy consumption norms for<br />

these consumers<br />

2


Introduction to BEE<br />

• BEE and SDAs set up to promote:<br />

– Demand-side management by distribution<br />

companies<br />

– Enhancing energy conservation in existing<br />

buildings, especially through <strong>Energy</strong> Service<br />

Companies (ESCOs)<br />

– Outreach and awareness programmes<br />

3


National Mission for Enhanced <strong>Energy</strong> <strong>Efficiency</strong>- 4<br />

New Initiatives<br />

‣ A market based mechanism to enhance cost<br />

effec­tiveness <strong>of</strong> improvements in energy<br />

efficiency in energy-intensive large industries and<br />

facilities, through certification <strong>of</strong> energy savings<br />

that could be traded. (Perform Achieve and Trade)<br />

‣ Accelerating the shift to energy efficient appliances<br />

in designated sectors through innovative measures<br />

to make the products more affordable. (Market<br />

Transformation for <strong>Energy</strong> <strong>Efficiency</strong>))<br />

4


National Mission for Enhanced <strong>Energy</strong> <strong>Efficiency</strong>- 4<br />

New Initiatives<br />

‣ Creation <strong>of</strong> mechanisms that would help finance<br />

demand side management programmes in all<br />

sectors by capturing future energy savings. (<strong>Energy</strong><br />

<strong>Efficiency</strong> Financing Platform (EEFP))<br />

‣ Developing fiscal instruments to promote energy<br />

efficiency namely Framework for <strong>Energy</strong> Efficient<br />

Economic Development (FEEED)<br />

5


<strong>Energy</strong> <strong>Efficiency</strong>– Action Plan - DSM Initiatives<br />

‣ <strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong> to promote energy efficient<br />

and high quality CFLs as replacement for<br />

incandescent bulbs in households.<br />

‣ Standards & Labeling Scheme targets high energy<br />

end use equipment and appliances to lay down<br />

minimum energy performance standards.<br />

‣ <strong>Energy</strong> Conservation Building Code (ECBC) sets<br />

minimum energy performance standards for new<br />

commercial buildings.<br />

.<br />

6


.<br />

<strong>Energy</strong> <strong>Efficiency</strong> – Action Plan<br />

DSM Initiatives<br />

‣ Agricultural and Municipal DSM targeting<br />

replacement <strong>of</strong> inefficient pumpsets, street<br />

lighting, etc.<br />

‣ Operationalising EC Act by Strengthening<br />

Institutional Capacity <strong>of</strong> State Designated Agencies<br />

(SDAs) : The scheme seeks to build institutional<br />

capacity <strong>of</strong> the newly created SDAs to perform their<br />

regulatory, enforcement and facilitative functions<br />

in the respective States.<br />

‣ <strong>Energy</strong> <strong>Efficiency</strong> Improvement in Small and<br />

Medium Enterprises (SMEs): To stimulate energy<br />

efficiency measures in 25 high energy consuming<br />

small and medium enterprise clusters.<br />

7


<strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong><br />

• Replace inefficient incandescent bulbs with CFLs for<br />

households only<br />

• Reduce price <strong>of</strong> CFL to that <strong>of</strong> incandescent bulbproject<br />

developer (CFL Manufacturer/ DISCOM)<br />

provides initial investment<br />

• Use CDM to recover balance cost<br />

• Monitor energy consumption reduction in a project<br />

area as outlined in AMS-II.J <strong>of</strong> CDM-EB<br />

• CERs generated after monitoring, validation and<br />

oversight <strong>of</strong> CDM Executive Board (CDM-EB) sold in<br />

international markets<br />

• Potential reduction in power consumption~6,000 -<br />

10,000 MW – XI plan target 4000 MW<br />

8


BLY Uses pCDM Approach<br />

The programme itself does<br />

not achieve the reductions,<br />

but provides the framework<br />

for emission reductions to<br />

occur through certified project<br />

activities<br />

9


BLY pCDM Process<br />

Plus<br />

Multiplication<br />

as short as<br />

3months.<br />

Minus<br />

Liability Risk<br />

in case <strong>of</strong><br />

failure<br />

Source: Tech. paper 120/07,ESMAP, World Bank, 2007<br />

10


Benefits <strong>of</strong> BLY<br />

Uses CDM Programme <strong>of</strong> Activities approach to<br />

‣Lower transaction costs<br />

‣Reduce time<br />

‣Capture an activity otherwise difficult /<br />

expensive under CDM<br />

‣Reduce risk to investors<br />

‣Simple monitoring without compromising CFL<br />

usage hours<br />

11


28 th May 2007–<br />

Announcement in<br />

chief ministers<br />

meeting chaired by<br />

Prime Minister<br />

BLY Chronology<br />

Aug to Dec 2007–<br />

Development <strong>of</strong> PoA<br />

DD based on<br />

AMS 046<br />

Mid 2008 PoA DD<br />

shifts to AMS IIC<br />

August 2008 BLY<br />

revised as per new<br />

CDM methodology<br />

AMS IIJ<br />

May June 2009<br />

PoA revised as per<br />

AMS IIJ DoE<br />

appointed for<br />

validation<br />

March 2009<br />

National<br />

Stakeholder<br />

Consultation<br />

February 2009–<br />

Official Launch <strong>of</strong> BLY<br />

PoA scheme<br />

12


BLY Role Players<br />

UNFCCC<br />

PoA<br />

SSC-CPA<br />

Supportin<br />

g Agency<br />

CDM-EB<br />

Registration &<br />

CER issuance<br />

BEE<br />

BLY PoA<br />

Managing<br />

Entity<br />

DISCOM<br />

assists investor<br />

in a BLY<br />

project<br />

e.g. Sample<br />

Survey Agency<br />

DOE<br />

Validation &<br />

Verification<br />

Investor<br />

invests into a<br />

BLY project<br />

13


Buyer in Annex I<br />

Country<br />

BLY Schematic<br />

PoA -Manager<br />

CDM EB<br />

Communication<br />

Validation /<br />

Verification<br />

Payment for CERs<br />

CERs sold<br />

Technically develops BLY<br />

scheme methodology and<br />

documents<br />

PoA<br />

approval<br />

DNA<br />

Annex I<br />

& II<br />

Safe<br />

disposal <strong>of</strong><br />

returned<br />

CFL<br />

CFL INVESTOR<br />

Fused CFL’s returned<br />

HOUSEHOLD<br />

Pays Rs 15 for new CFL<br />

Safe<br />

keeping <strong>of</strong><br />

replaced<br />

ICL lamp<br />

for<br />

inspection<br />

DISCOM<br />

Replaced ICL lamp<br />

•Procures long-life CFLs and distributes to<br />

households<br />

•Day-to-day monitoring; Verification<br />

survey to assess lamp failure rate<br />

Provides access to the<br />

households for installing CFLs<br />

Each BLY project ~ 600,000 CFLs,<br />

upto 4 CFLs per household<br />

400 million ICLs / annum replaceable,<br />

annually saving ~ 6000 MW<br />

CFL = Compact Florescent <strong>Lamp</strong><br />

ICL = Incandescent lamps<br />

BEE = <strong>Bureau</strong> <strong>of</strong> <strong>Energy</strong> <strong>Efficiency</strong><br />

DISCOM = Distribution Company<br />

DNA = Designated National<br />

Authority<br />

EB = Executive Board<br />

14


Role <strong>of</strong> BEE<br />

• Acts as overall PoA co-ordinator<br />

• Technically develops and shares the<br />

development <strong>of</strong> CDM methodology<br />

• Awareness and information<br />

• Inclusion <strong>of</strong> CPA-DDs under the PoA after<br />

validation<br />

• Facilitate verification <strong>of</strong> CERs and<br />

recommend their allocation to the investors<br />

15


Role <strong>of</strong> CFL Investor<br />

• Procures and distributes CFLs at a price comparable<br />

to GLS lamps.<br />

• Preparing CDM Programme Activity Design<br />

Documents (CPA-DDs) for CDM project and<br />

submitting them to BEE.<br />

• Collection <strong>of</strong> end-<strong>of</strong>-life CFLs and arranging for<br />

their safe disposal as per regulatory norms.<br />

• Operates and manage project on day-to-day basis<br />

16


Role <strong>of</strong> DISCOM<br />

• Provides access to Database <strong>of</strong> households to install<br />

CFLs<br />

• Assists in<br />

1. Selection <strong>of</strong> monitoring survey as required<br />

under AMS-II.J<br />

2. Distribution <strong>of</strong> CFL <strong>Lamp</strong>s in exchange <strong>of</strong><br />

incandescent lamps<br />

3. Safe keeping <strong>of</strong> replaced ICLs for<br />

independent inspection<br />

17


• AMS IIJ- Simplified M&V<br />

1. Deemed savings<br />

approach: 3.5 hours<br />

/ day/ CFL<br />

2. Periodic CFLs survey<br />

Monitoring & Verification<br />

Project area)<br />

Total area serviced by<br />

DISCOM<br />

MS-1<br />

MS-2<br />

MS<br />

= Monitoring Survey<br />

18


CFL Meter<br />

Pluggable meter for easy installation<br />

19


Metering Unit Specifications<br />

• Input: 150 – 300 V<br />

• Parameters measured<br />

– Supply Voltage – Average<br />

– <strong>Lamp</strong> Current – Average<br />

– Burning hours<br />

– <strong>Energy</strong> Consumed<br />

• Record storage interval – One switch on<br />

• Record Content – Time stamp, Volts, Current,<br />

Duration, <strong>Energy</strong><br />

• SMS Sending interval – At every switch on<br />

20


Meter Functioning (I)<br />

OFF ON<br />

When bulb will switch on, meter<br />

Values <strong>of</strong> voltage, current,<br />

will start recording the voltage,<br />

energy and switch on<br />

current,<br />

duration<br />

energy and time till it<br />

will be stored inside<br />

gets<br />

memory<br />

switch <strong>of</strong>f<br />

21


Meter Functioning (II)<br />

OFF ON<br />

As you switch on again, the<br />

recordings <strong>of</strong> previous sessions<br />

will be transmitted to server via<br />

SMS and the current recordings<br />

will start.<br />

22


Meter Functioning (III)<br />

Data from different meters from<br />

different locations is collected<br />

at centralised server / computer<br />

23


Meter Functioning (IV)<br />

V1<br />

I1<br />

V2<br />

I2<br />

…<br />

…<br />

Vn<br />

In<br />

Entire Data <strong>of</strong> every switch on<br />

session can be downloaded with<br />

cable connected to meter &<br />

laptop / hand Held Terminal.<br />

E1<br />

E2<br />

…<br />

En<br />

T1<br />

T2<br />

…<br />

Tn<br />

24


Requirements<br />

• DISCOM identifies BEE empanelled Investor<br />

• Tri-partite Agreement with DISCOM, Investor and<br />

BEE<br />

• Investor identifies long-life IS 15111 certified CFL<br />

supplier<br />

• Develop project as per BLY scheme templates<br />

25


Consumer<br />

Social Impact<br />

• CFLs at price <strong>of</strong> incandescent lamp (INR 15), to all<br />

households<br />

• Reduced peak load-shedding<br />

DISCOMs<br />

• Enhanced customer satisfaction<br />

Manufacturers / Investors<br />

• Creates employment<br />

26


Generating Utility<br />

Environmental Impact<br />

• Reduced GHG emissions<br />

Investor<br />

• Collection <strong>of</strong> Project CFLs at end-<strong>of</strong>-life<br />

• Contain potential mercury exposure,<br />

• Improves recyclability<br />

27


Progress In <strong>Bachat</strong> <strong>Lamp</strong> <strong>Yojana</strong><br />

• 1 pilot project registered at UNFCCC on 26th Sept<br />

2008.<br />

• PDDs for Haryana , Andhra Pradesh, Maharashtra<br />

have been submitted to CDM Executive Board for<br />

registration.<br />

• 31 CFL manufacturers/Traders have been<br />

empanelled by BEE<br />

• 14 states have taken up steps towards<br />

implemetation <strong>of</strong> scheme in their respective<br />

DISCOM regions.<br />

28


• Contact Information:<br />

Enable energy efficiency<br />

…using CDM<br />

• <strong>Bureau</strong> <strong>of</strong> <strong>Energy</strong> <strong>Efficiency</strong><br />

(Govt <strong>of</strong> India, Ministry <strong>of</strong> Power)<br />

4 th Floor, Sewa Bhawan,R. K. Puram<br />

New Delhi- 110 066, India.<br />

• Tel: 011- 26179699<br />

• Fax: 011- 26178352<br />

• Email:vthakur@beenet.in<br />

• www.bee.gov.in<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!