<strong>Board</strong> Meeting <strong>of</strong> <strong>February</strong> 27, <strong>2004</strong><br />

Page Two<br />

• Property Access Agreement for Geotechnical Drilling received <strong>February</strong> 19,<br />

<strong>2004</strong> that will evaluate:<br />

i. Soil Consistency<br />

ii. Environmental Contamination<br />

B. Finance/Legislative Activities<br />

• No action taken during the reporting period.<br />

C. Architectural & Engineering (A&E)<br />

• RNL: Design Phase 35% completed.<br />

• Schematic drawings presented to Staff and Union leadership.<br />

D. Construction Management (CM)<br />

• Reviewed and interviewed 3 proposals and selected a preferred Construction<br />

Management company to be recommended to the <strong>Board</strong> <strong>of</strong> <strong>Directors</strong>.<br />

• Currently checking preferred company references – <strong>Board</strong> consideration<br />

<strong>February</strong> 27 th , <strong>2004</strong><br />

E. Construction<br />

• Goal is to issue Invitation to Bid by Fall.<br />

IV.<br />

FINANCIAL CONSIDERATIONS<br />

No actions have taken place during the reporting period that have changed the financial status <strong>of</strong><br />

the MetroBase project.<br />

V. ATTACHMENTS<br />

Attachment A:<br />

Attachment B:<br />

MetroBase Project Schedule<br />

MetroBase Construction Phasing Schedule