PROJECT PROFILE<br />

• The <strong>Project</strong> is a multi-purpose water supply<br />

and power project;<br />

• The second major source of water for Metro<br />

Manila, after Angat <strong>Dam</strong>.<br />

• Provides 1,900 MLD of water & 25 MW power.<br />

• A 113-meter high dam on <strong>the</strong> Kaliwa River in<br />

Tanay, Rizal.<br />

• Situated east of Metro Manila on a<br />

mountainous watershed of about 28,000<br />

hectares in <strong>the</strong> Sierra Madre Mountains.


Angat <strong>Dam</strong><br />

Kanan <strong>Dam</strong><br />

La Mesa <strong>Dam</strong><br />

To Distribution System<br />

Cogeo Reservoir<br />

<strong>Laiban</strong> <strong>Dam</strong><br />

Pantay WTP<br />

Laguna de Bay<br />

PROJECT LAY-OUT


PROJECT COMPONENTS<br />

Pantay<br />

2400MLD<br />

WTP<br />

Resettlement Site<br />

Taytay Res =<br />

120 ML<br />

Antipolo<br />

Res= 20ML<br />

25 MW<br />

HEP<br />

<strong>Dam</strong><br />

PS<br />

Tunnel<br />

Conveyance<br />

line<br />

The <strong>Project</strong>:<br />

• 1,900 MLD additional supply<br />

• <strong>Dam</strong> height: 113M<br />

• Affected Families: 4,413<br />

• <strong>Project</strong> cost – P 48B


MAJOR WORKS UNDERTAKEN<br />

• FS and detailed engineering for <strong>the</strong> <strong>Project</strong> were already<br />

completed in 1980’s including <strong>the</strong> construction of <strong>the</strong><br />

diversion tunnels<br />

• Some of <strong>the</strong> affected families were already compensated of<br />

<strong>the</strong>ir above-ground improvements and several titled<br />

properties have also been acquired<br />

• The <strong>Project</strong> including <strong>the</strong> supposed relocation was<br />

deferred in 1989 in lieu of an equally important projects,<br />

<strong>the</strong> Angat Water Supply Optimization <strong>Project</strong> (AWSOP)<br />

and <strong>the</strong> Umiray-Angat Transbasin <strong>Project</strong> (UATP)<br />

• Several reviews & updating were conducted to prepare <strong>the</strong><br />

<strong>Project</strong> for tendering and eventually for funding ei<strong>the</strong>r<br />

thru Build-Operate-Transfer (BOT) or o<strong>the</strong>r financing<br />

scheme.


ENVIRONMENTAL CONDITION<br />

• Kaliwa watershed area<br />

is 28,000 has., of<br />

which 70% is in Tanay


ENVIRONMENTAL CONDITION<br />

THE VALLEY OF LENATIN RIVER,<br />

WHICH FORMS THE WESTERN SIDE<br />

OF THE CATCHMENT, IS<br />

CHARACTERIZED BY SPARSE<br />

VEGETATION CONSISTING OF<br />

BUSHES AND SCATTERED TREES.<br />

LIMUTAN WATERSHED HAS<br />

MODERATE TO INTENSIVE<br />

FOREST COVER AND VIRTUALLY<br />

INACCESSIBLE


ENVIRONMENTAL CONDITION<br />

• Reduction of forest cover due to small scale<br />

logging, grazing and kaingin have continued in<br />

various parts of <strong>the</strong> catchment basin<br />

• Population has increased and new houses and<br />

government structures are existing and being<br />

built within <strong>the</strong> watershed<br />

Residential Structures<br />

Barangay Centers<br />

2-storey School Bldg.


Mitigating Measures on<br />

Environmental Impacts:<br />

• Organize a Multi-Partite Monitoring Team<br />

(MMT) that will monitor progress of work<br />

and compliance with ECC and<br />

Environmental Management Plan<br />

• Allocate an Environmental Guarantee Fund<br />

• Implementation of a Watershed<br />

Management Plan with active participation<br />

of <strong>the</strong> local communities


BGY. STA. INES<br />

AF=474<br />

PROJECT IMPACT<br />

FLOODING OF 7 BGYS. IN<br />

TANAY, 1 IN GENERAL<br />

NAKAR, PANTAY WTP &<br />

SAN YSIRO RELOC SITE<br />

(4,413 affected families)<br />

BGY. MAMUYAO<br />

AF=323<br />

BGY. LIMUTAN<br />

AF=390<br />

BGY. TINUKAN<br />

AF=290<br />

BGY. CAYABU<br />

AF=175<br />

BGY. STO. NINO<br />

AF=318<br />

BGY. LAIBAN<br />

AF=720<br />

BGY. SAN ANDRES<br />

AF=423<br />

BGY. DARAITAN<br />

AF = 591<br />

Source: DENR


PROJECT IMPACT<br />

• Erosion of sediments<br />

• Irreversible loss of agricultural resources<br />

and scenic spots (Sta. Ines Falls, Sangab<br />

Cave)<br />

• Destruction or interference with habitats<br />

• Impairment of cultural areas/monuments<br />

and ancestral domains of indigenous<br />

people (IPs)<br />

• Relocation of settlers


Indicative <strong>Project</strong> Schedule<br />

ACTIVITY<br />

2007 2008 2009<br />

1 2 3 4 1 2 3 4 1 2 3 4<br />

2010<br />

1 2 3 4<br />

2011<br />

1 2 3 4<br />

2012<br />

1 2 3 4<br />

2013<br />

1 2 3 4<br />

2014<br />

1 2 3 4<br />

2015<br />

1 2 3 4<br />

Pre-Construction Activities<br />

(LARP, ECC, LGU endorsement, etc)<br />

Fund Sourcing (BOT)<br />

Contracting Phase<br />

Land Acquisition & Resettlement<br />

(including livelihood assistance)<br />

Construction<br />

Commissioning<br />

NEDA-ICC Approved <strong>Project</strong> Cost = PhP 47.93B


Current Status (as of 15 June 2008)<br />

• Since this <strong>Project</strong> was cancelled under <strong>the</strong> China Loan, <strong>MWSS</strong> is<br />

now pursuing o<strong>the</strong>r mode of procurement ei<strong>the</strong>r solicited or<br />

unsolicited proposals. In fact, Memoranda of Understanding<br />

(MOUs) were already signed by <strong>MWSS</strong> with several interested<br />

proponents for <strong>the</strong> conduct of due diligence on <strong>the</strong> <strong>Project</strong>. At<br />

present, an American firm, CalEnergy International, is presently<br />

doing due diligence and soon to submit its proposal.<br />

• Meantime, <strong>the</strong> following pre-construction activities is in progress:<br />

- Processing of <strong>the</strong> new ECC of <strong>the</strong> <strong>Project</strong>;<br />

- Processing of <strong>the</strong> Free and Prior Inform Consent (FPIC)<br />

clearance from <strong>the</strong> National Commission on Indigenous People<br />

(NCIP); and<br />

- Continuing dialogue/meeting with <strong>the</strong> LGU particularly <strong>the</strong><br />

municipality of Tanay, Rizal and <strong>the</strong> affected barangays relative<br />

to <strong>the</strong> LGU’s endorsement of <strong>the</strong> <strong>Project</strong>.


NEDA-ICC Approved <strong>Project</strong> Cost Estimate<br />

<strong>Project</strong> Components<br />

Headworks (dams, tunnels etc.)<br />

Treatment Plant<br />

Distribution System<br />

Environmental & Watershed<br />

Management<br />

Resettlement<br />

Right-of-way<br />

Indirect Costs (Eng’g., Taxes,<br />

Contingencies, etc)<br />

IDC and front-end fee<br />

TOTAL<br />

Cost (PhP M)<br />

13,060.00<br />

3,254.00<br />

9,951.00<br />

90.00<br />

7,417.00<br />

2,651.00<br />

6,306.00<br />

5,560.00<br />

47,929.00


Parcel 1<br />

Proposed Resettlement<br />

Site in San Ysiro, Antipolo<br />

City as proclaimed under<br />

Proclamation No. 2480<br />

Issued on Jan 26, 1986<br />

Area<br />

(hectares)<br />

Parcel 4<br />

Parcel 2<br />

<strong>MWSS</strong><br />

Property<br />

1,507<br />

<strong>MWSS</strong> Titled Property<br />

Lot 1 = 232 hectares<br />

Lot 2 = 1,275 hectares<br />

Total = 1,507 hectares<br />

Parcel 1<br />

Parcel 2<br />

Parcel 3<br />

Parcel 4<br />

887<br />

360<br />

379<br />

1,291<br />

Parcel 3<br />

Total<br />

4,424


PROJECT LOCATION<br />

PROJECT LOCATION<br />

<strong>Laiban</strong> <strong>Dam</strong> Site<br />

(about 70 kms road<br />

distance from <strong>MWSS</strong>)


<strong>Project</strong> Affected Families<br />

8 mountain barangays<br />

in Tanay including Brgy<br />

Daraitan<br />

Brgy. Limutan, Gen.<br />

Nakar, Quezon<br />

San Ysiro, Antipolo City<br />

(relocation site)<br />

Pantay Water Treatment<br />

Plant (Antipolo City)<br />

1984 Census<br />

2,372<br />

13<br />

182<br />

-<br />

2006 Census<br />

3,314<br />

390<br />

643<br />

66<br />

Total<br />

2,567<br />

4,413


Parcel 1<br />

Proposed Resettlement<br />

Site in San Ysiro, Antipolo<br />

City as proclaimed under<br />

Proclamation No. 2480<br />

Issued on Jan 26, 1986<br />

Area<br />

(hectares)<br />

Parcel 4<br />

Parcel 2<br />

<strong>MWSS</strong><br />

Property<br />

1,507<br />

<strong>MWSS</strong> Titled Property<br />

Lot 1 = 232 hectares<br />

Lot 2 = 1,275 hectares<br />

Total = 1,507 hectares<br />

Parcel 1<br />

Parcel 2<br />

Parcel 3<br />

Parcel 4<br />

887<br />

360<br />

379<br />

1,291<br />

Parcel 3<br />

Total<br />

4,424


Total Expenditures To Date:<br />

Description<br />

• Before <strong>MWSS</strong> Privatization:<br />

(FS, Detailed Engg., Diversion tunnels,<br />

partial land acquisition, and o<strong>the</strong>r preconstruction<br />

activities)<br />

• After <strong>MWSS</strong> Privatization:<br />

Amt (PhP M)<br />

690.00<br />

65.00<br />

a) (Review/Updating of documents including preliminary<br />

resettlement planning), year 2001 -------------- 36.00M<br />

b) Technical review & assess tender docs for construction,<br />

year 2006-2007 -------------------------------------- 24.00M<br />

c) Fur<strong>the</strong>r geological investigation at damsite<br />

(on-going) -----------------------------------------------5.00M<br />

TOTAL<br />

755.00<br />

NEDA-ICC approved <strong>Project</strong> Cost (2007) = PhP 47.93B


Million Liters Per Day<br />

10000<br />

9000<br />

8000<br />

7000<br />

6000<br />

5000<br />

4000<br />

3000<br />

Water Supply-Demand <strong>Project</strong>ion<br />

Present Water Demand<br />

(2007) = 5,200 MLD<br />

Sumag(188mld)<br />

+ Wawa (50mld)<br />

2005<br />

2006<br />

2007<br />

2008<br />

<strong>Laiban</strong> Phase 1 (1220 mld)<br />

= 538 mld<br />

+ 300mld Treated Bulk Water<br />

2009<br />

2010<br />

2011<br />

2012<br />

2013<br />

2014<br />

2015<br />

2016<br />

<strong>Laiban</strong> Phase 2 (610 mld)<br />

Present Water Supply from Angat = 4,000 MLD<br />

2017<br />

2018<br />

2019<br />

2020<br />

Kanan Phase 1 (1090 mld)<br />

Kanan Phase 2 (1090 mld)<br />

Year<br />

Supply Demand Present Supply (4000 mld)<br />

Kanan Phase 3 (1090 mld)<br />

2021<br />

2022<br />

2023<br />

2024<br />

2025<br />

2027<br />

2029<br />

2031<br />

2034<br />

2036<br />

2038<br />

2040


KALIWA WATERSHED (28,000 has.)<br />

DARAITAN<br />

MADILAY-DILAY<br />

AREA OF WATERSHED = 28,000 HAS<br />

DAM<br />

KALIWA RIVER<br />

Diversion Tunnel<br />

FLOW<br />

MAMUYAO<br />

LIMUTAN RIVER<br />

LENATIN RIVER<br />

LAIBAN<br />

STO.NIÑO<br />

KUYAMBAY<br />

SAN ANDRES<br />

STA. INES<br />

TINUKAN<br />

CAYABU<br />

INTAKE


PROJECT LOCATION<br />

Proposed Relocation Site<br />

San Ysiro, Antipolo City<br />

Special Relocation Site declared<br />

under Proc. #2480 in 1986<br />

Marcos Highway<br />

Proposed <strong>Laiban</strong> <strong>Dam</strong> located about<br />

70 kms road distance from <strong>MWSS</strong>


<strong>Project</strong> Lay-out<br />

San Ysiro Reloc Site<br />

4,400 hectares<br />

Completed<br />

Diversion tunnel