26.06.2014 Views

Asset optimisation Services - Schneider Electric

Asset optimisation Services - Schneider Electric

Asset optimisation Services - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Asset</strong> <strong>optimisation</strong>:<br />

guarantee your peace of mind!<br />

June 10, 2008


We commit all over you’re the lifecycle of<br />

your installation for your peace of mind!<br />

<strong>Asset</strong> <strong>optimisation</strong> services<br />

June 10, 2008<br />

2


Which asset <strong>optimisation</strong> option suits you?<br />

Your needs Our offers Your benefits<br />

• Have a global view of the installation<br />

• Schedule interventions<br />

• Build an investment plan<br />

• Focus on your core business<br />

• Maximise uptime<br />

• Optimise your asset management cost<br />

• Have visibility of your asset management<br />

• Control your budget<br />

Installation assessment<br />

MP4<br />

<strong>Asset</strong> management<br />

program<br />

Prevent services contracts<br />

• Best availability and quality<br />

• Roadmap for operating and maintenance<br />

• Prioritisation of investments<br />

• Peace of mind<br />

• Long term customised program<br />

• Preventive & corrective maintenance<br />

• Expertise of the manufacturer<br />

• Reactivity commitment in case of failure<br />

• Reduce downtime and restart time<br />

• Set up maintenance best practices<br />

• Ensure compliance & safety<br />

On-demand maintenance<br />

Start-up / After-sales parts /<br />

Maintenance & diagnosis // Repairs<br />

• Preventive & curative maintenance<br />

• Manufacturer maintenance<br />

• Expert recommendations<br />

• Extend equipment life time<br />

• Modernise your installation<br />

• Optimise modernisation costs<br />

Modernisation<br />

Refurbishment<br />

Retrofit<br />

Replacement<br />

• Ensuring and anticipating maintainability<br />

• Competitive costs<br />

• Benefiting from technological advances<br />

• Modernising without disrupting the business<br />

• New equipment + manufacturer start-up<br />

• Manage WEEE<br />

• Respect legal regulation<br />

End-of-life<br />

Treatment & recycling<br />

• Costs <strong>optimisation</strong><br />

• Legal documents<br />

<strong>Asset</strong> <strong>optimisation</strong> services<br />

June 10, 2008<br />

3


June 10, 2008<br />

4


Installation assessment: shed light<br />

on your installation<br />

●Are you:<br />

● Acquiring or extending a site?<br />

● Facing repetitive failures?<br />

● Struggling with increasing<br />

maintenance costs?<br />

●Then, you may be questioning:<br />

● The quality and reliability of your newly acquired or existing<br />

installation<br />

● Your priorities in maintenance operation and modernisation<br />

investments<br />

Our <strong>Services</strong> solution: MP4 audit<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

5


MP4 at a glance<br />

●Value proposition:<br />

A plant-wide electrical installation<br />

assessment to define an improvement<br />

and risk management program<br />

Customer benefits:<br />

Improve installation<br />

availability and quality<br />

●Delivery:<br />

4 plans:<br />

● Maintenance<br />

● Modernisation<br />

● Monitoring<br />

● Management<br />

●Scope:<br />

From main supply to low voltage<br />

main switchboard<br />

Provide a roadmap for<br />

operations and maintenance<br />

activities<br />

Prioritise electrical<br />

investments to optimise<br />

CAPEX<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

6


MP4<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●A plant-wide electrical installation<br />

assessment to define an<br />

improvement and risk<br />

management program<br />

Delivery<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

7


MP4 value proposition<br />

●MP4 audit: a plant-wide electrical network assessment to define an<br />

improvement and risk management program<br />

● ensure quality and reliability<br />

● have a resilient installation at all times<br />

● optimise investments and guarantee a long-lasting installation<br />

● Identify energy savings potential<br />

●Strengths of this offer:<br />

● technical audit and recommendations delivered by the worldwide<br />

leader of ED: <strong>Schneider</strong> <strong>Electric</strong><br />

● fully customised to your needs & critical points of your process<br />

● structured methodology guaranteeing continuous quality<br />

and enabling worldwide replication<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

8


MP4<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

●Improve OPEX by increasing<br />

installation availability and quality<br />

●Provide a roadmap for operations<br />

and maintenance activities<br />

●Prioritise electrical investments to<br />

optimise CAPEX<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

9


MP4 customers benefits<br />

4 improvement plans enable you to:<br />

Improve OPEX by improving installation<br />

availability and quality<br />

Provide a roadmap to optimise<br />

operations and maintenance<br />

Prioritise electrical installation<br />

investments to optimise CAPEX<br />

1 week analysis on your site to<br />

deliver a 3 to 5-year plan<br />

<strong>Electric</strong>ity is the first cause of<br />

fire in industrial sites: 22% of<br />

fires are due to an electrical<br />

equipment failure<br />

Increase safety and enable better<br />

prevention of electrical risks<br />

Replicate some or all<br />

Recommendations in multi-sites<br />

Predict failures & act before they<br />

happen<br />

Source: <strong>Schneider</strong> <strong>Electric</strong> expertise<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

10


MP4<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

● Detailed report describing :<br />

> safety critical issues<br />

> 4 improvement plans<br />

● Work realised in a partnership mode<br />

> on site<br />

Scope<br />

> findings shared during conclusions<br />

meeting<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

11


MP4 delivery<br />

●A 4-step methodology:<br />

Process<br />

understanding<br />

& risk analysis<br />

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7<br />

●Deliverables :<br />

Equipment status<br />

assessment<br />

& reliability analysis<br />

Criticality index &<br />

competency evaluation<br />

Plans creation<br />

& conclusion<br />

meeting<br />

-A synthesis of critical issues<br />

related to safety<br />

-4 improvement plans to guarantee<br />

installation reliability & scheduled<br />

interventions<br />

Monitoring<br />

Management<br />

Maintenance<br />

Modernisation<br />

June 10, 2008<br />

12


MP4<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●From main supply to low voltage<br />

main switchboard<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

13


MP4 scope<br />

●Any industrial processes or large infrastructure sensitive to electrical<br />

shut down, with installed power > 2/3MVA<br />

●<strong>Electric</strong>al distribution: from main medium voltage supply<br />

to low voltage main distribution switchboard<br />

●Installation more than 5 years old fitted with any brand of products<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Installation assessment<br />

June 10, 2008<br />

14


MP4 references<br />

Automotive<br />

Toyota, Michelin, Denso,<br />

Faurecia<br />

Health &<br />

Pharmaceutical<br />

Sanofi-Aventis, Merck,<br />

GSK<br />

Food & Beverage<br />

Danone, Nestle, Cargill,<br />

Procter& Gamble<br />

Oil & Gas<br />

Total<br />

Mining, Minerals,<br />

Metal<br />

Siam City (Holcim),<br />

Lafarge, Alcoa, Saint-<br />

Gobain<br />

Infrastructures<br />

Airports, water plants<br />

June 10, 2008<br />

15


MP4 references: Water segment<br />

Customer needs<br />

● Get a professional argumentation for top<br />

management to prove the need of an electrical<br />

maintenance budget<br />

● Obtain a clear vision of each electrical asset<br />

status<br />

Our services solution<br />

● A complete audit on-site including:<br />

● The assessment of the electrical<br />

distribution system performance<br />

● The recommendations about 4<br />

plans: modernisation,<br />

maintenance, management and<br />

monitoring<br />

Customer benefits<br />

●Technical Experts on-site for answering questions<br />

●A plan for necessary maintenance operations to be carried out<br />

●A long-term investment plan<br />

June 10, 2008<br />

16


MP4 references: Food & Beverage<br />

Customer needs<br />

● Master its electrical risk in term of fire &<br />

damages, and losses of production<br />

● Achieve this on 5 different sites to identify<br />

“structural” weaknesses of their network<br />

● Have a structured methodology replicable on<br />

multi-sites.<br />

Our services solution<br />

● A complete audit on-site including:<br />

● The assessment of the electrical<br />

distribution system performance and<br />

level of risk.<br />

● A list of safety critical issues +<br />

recommendations included in<br />

4 plans: maintenance, modernisation,<br />

monitoring and management<br />

Customer benefits<br />

●Highlights of the major safety critical issues<br />

●Transversal Executive Summary pointing out common weaknesses<br />

●Improvement plans and follow-up set up for each site.<br />

June 10, 2008<br />

17


MP4 references: Building Public sector -<br />

France<br />

Customer needs<br />

● Renovate his old installed base and obtain a<br />

clear vision of each other electrical asset<br />

Our services solution<br />

● A complete audit on-site including:<br />

● The assessment of the electrical<br />

distribution system performance<br />

● The recommendations about<br />

4 plans: modernisation,<br />

maintenance, management and<br />

monitoring<br />

Customer benefits<br />

● Partnership with a Professional electrical solutions provider<br />

● An investment plan for a 5 years period<br />

June 10, 2008<br />

18


June May 10, 23, 2008<br />

19


<strong>Asset</strong> management program: optimise<br />

the availability of your facilities<br />

●Are you facing significant financial losses<br />

because of unwanted downtime?<br />

●Do you know that your losses are<br />

amplified because of:<br />

● Lost time to identify & repair faulty<br />

equipment<br />

● Performance of repaired equipment<br />

inevitably deteriorates<br />

Our services solution : “Prevent” services contracts<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

20


<strong>Asset</strong> management program: optimise<br />

the availability of your facilities<br />

Examples of hourly cost of site downtime (€)<br />

● Stock market transactions over 1 000 000<br />

● Oil & gas 100 000<br />

● Airline reservation 90 000<br />

● Mobile telephone systems 40 000<br />

● Pharmaceutical 30 000<br />

● Automotive 30 000<br />

● Food & beverage 20 000<br />

● Cement 15 000<br />

Source: Leonardo Power Quality Initiative<br />

(European Copper Institute)<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

21


Prevent services contracts at a glance<br />

●Value proposition:<br />

A customised long term services<br />

program to:<br />

● maximise your uptime<br />

● optimise your asset management<br />

●Delivery:<br />

On-site services with 3 commitment<br />

levels:<br />

● “Prevent” : priority customer<br />

● “Prevent +”: budget control<br />

● “Prevent ++”: total budget control<br />

●Scope:<br />

The entire electrical installation<br />

of a site from 250 kVA, 10 MVA<br />

Customer benefits:<br />

Total peace of mind:<br />

manufacturer experts take<br />

care of your assets<br />

Visibility of the status<br />

of the installation through<br />

exclusive tools<br />

Budget control of<br />

installation based<br />

investment<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

22


Prevent services contracts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●A customised long term services<br />

program to:<br />

● maximise your uptime<br />

● optimise your asset<br />

management<br />

Delivery<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

23


Prevent services contracts value<br />

proposition<br />

A solution tailored to your exact needs:<br />

●A customised maintenance plan according to your<br />

process and installation:<br />

● defined and scheduled with you<br />

● executed by <strong>Schneider</strong> <strong>Electric</strong> technicians<br />

●Responsiveness of call-out teams:<br />

● 24/7 direct access to online assistance<br />

● contractual commitment to delivery times of<br />

replacement parts and expert call-out to the site<br />

in the event of a failure<br />

●Budget control of different levels according to the<br />

selected options<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

24


Prevent services contracts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Total peace of mind:<br />

manufacturer experts take care of<br />

your assets<br />

●Visibility of the status<br />

of the installation through<br />

exclusive tools<br />

●Budget control of installation<br />

based investment<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

25


Prevent services contracts customer<br />

benefits<br />

Total peace of mind thanks to manufacturer‘s commitment<br />

● Minimise your unplanned down-times by:<br />

● Scheduling preventive maintenance<br />

● Anticipating failures & acting before they happen<br />

● Benefiting from a high responsiveness level in case of down time<br />

● Optimising the performance thanks to our experts’ recommendations<br />

Perfect, real-time visibility of installation status through exclusive<br />

software: IB Suite and Zen<br />

Better management of installation-related investments<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

26


Prevent services contracts customer<br />

benefits<br />

Compare the cost & performance differences between 2 maintenance<br />

strategies<br />

No preventive maintenance<br />

With preventive maintenance<br />

Source: <strong>Schneider</strong> <strong>Electric</strong> expertise<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

27


Prevent services contracts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

●On-site services with 3<br />

commitment levels:<br />

● “Prevent” :<br />

● “Prevent +”:<br />

priority customer<br />

budget control<br />

● “Prevent ++”: total budget control<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

28


Prevent services contracts delivery<br />

3 contract levels with options to answer your exact needs<br />

Prevent<br />

contract<br />

Prevent +<br />

contract<br />

Prevent ++<br />

contract<br />

Preventive maintenance (levels 1 to 4)<br />

24/7 support<br />

Emergency on-site intervention 8 business hours<br />

Emergency parts’ delivery 8 business hours<br />

Delivery of full equipment within 48 hours<br />

Access to maintenance data<br />

Free support / Extra benefit versus 24/7<br />

Free equipment and parts<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

29


Prevent services contracts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●The entire electrical installation<br />

of a site from 250 kVA, 10 MVA<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

30


Prevent services contracts scope<br />

IBSuite: software suite dedicated<br />

to maintenance<br />

Zen: a repository to manage<br />

the assets all along their life span<br />

●Complete factory or building electrical installation<br />

●With <strong>Schneider</strong> <strong>Electric</strong> and non <strong>Schneider</strong> <strong>Electric</strong> brands<br />

●Operation executed with exclusive software<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

31


Prevent services contracts references<br />

Automotive<br />

Faurecia, Valeo, Bosch,<br />

General Motors<br />

Mining, Minerals, Metal<br />

Lafarge, Alcan, Saint-Gobain<br />

Food & Beverage<br />

Nestlé, Procter &<br />

Gamble, Unilever<br />

Micro-electronics<br />

Atmel, IBM<br />

Oil & Gas<br />

Total, BP<br />

Infrastructure<br />

Veolia<br />

Health &<br />

Pharmaceutical<br />

Sanofi-Aventis, GSK<br />

Building<br />

Auchan<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

32


Maintenance contracts reference in baby<br />

care products<br />

Customer needs<br />

● Compensate for the lack of internal maintenance<br />

program and associated competencies<br />

● Obtain high availability<br />

● Limit shut-down time of electrical assets<br />

Our services solution<br />

● A long term contract including:<br />

● Manufacturer preventive<br />

maintenance according to a<br />

predefined program<br />

● Hotline 24/7 support with highly<br />

qualified specialists<br />

● Commitment on agreed lead time<br />

for labour and spare parts<br />

Customer benefits<br />

●Minimisation of electrical assets downtime<br />

●Peace of mind regarding any technical issue<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

33


Maintenance contracts reference in<br />

building industry<br />

Customer needs<br />

● Carry-out manufacturer maintenance on MV<br />

assets<br />

● Manage the maintenance budget<br />

● Obtain high availability<br />

● Limit shut-down time of electrical assets<br />

Our services solution<br />

● A long term contract including:<br />

● Manufacturer preventive<br />

maintenance according to a<br />

predefined program<br />

● Hotline 24/7 support with highly<br />

qualified specialists<br />

● Commitment on agreed lead time<br />

for labour and spare parts<br />

● Costs of corrective maintenance<br />

Customer benefits<br />

●Minimisation of electrical assets downtime<br />

●Budget control regarding electrical assets maintenance<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

34


Customer benefits<br />

● Minimisation of electrical<br />

assets downtime<br />

● Budget control regarding<br />

electrical assets maintenance<br />

June 10, 2008<br />

35


Maintenance contracts reference in<br />

automotive industry<br />

Customer needs<br />

● Delegate maintenance on electrical assets<br />

● Predict electrical failures<br />

● Limit shut-down time of electrical assets<br />

● Follow-up of asset life cycle<br />

Our services solution<br />

● A long term contract including:<br />

● 24/7 Workforce on site<br />

● Preventive and Predictive<br />

maintenance according to a<br />

predefined program<br />

● Corrective maintenance<br />

● Annual and regular review of asset<br />

status<br />

Customer benefits<br />

● Optimisation of electrical assets downtime<br />

● Responsibility transfer regarding assets maintenance<br />

● CAPEX forecast regarding electrical assets<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

36


Customer benefits<br />

● Optimisation of electrical<br />

assets downtime<br />

● Responsibility transfer<br />

regarding assets maintenance<br />

● CAPEX forecast regarding<br />

electrical assets<br />

June 10, 2008<br />

37


Maintenance contracts reference in oil &<br />

gas industry<br />

Customer needs<br />

● Limit shut-down time of electrical assets<br />

● Modernize old electrical assets<br />

● Maintain investment capacity<br />

Our services solution<br />

● A long term contract including:<br />

● Preventive maintenance according<br />

to a predefined program<br />

● Corrective maintenance<br />

● Hotline 24/7 support with highly<br />

qualified specialists<br />

● Replacement of assets at the end of<br />

contract<br />

● Budget spread over the contract duration<br />

Customer benefits<br />

● Anticipation of electrical assets investments<br />

● Manufacturer insurance regarding assets availability<br />

● CAPEX/OPEX financial transfer<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

<strong>Asset</strong> management program<br />

June 10, 2008<br />

38


Customer benefits<br />

● Anticipation of electrical<br />

assets investments<br />

● Manufacturer insurance<br />

regarding assets availability<br />

● CAPEX/OPEX financial<br />

transfer<br />

June 10, 2008<br />

39


June May 10, 23, 2008<br />

40


On-demand maintenance: maintain your<br />

installation performance level<br />

●Are you<br />

● Facing budgetary constraints<br />

● Lacking competent maintenance<br />

personnel<br />

● Struggling to minimise downtime<br />

●The long term performance of your<br />

electrical distribution installation can easily<br />

be compromised if not properly maintained<br />

Our services solutions: start-up, after sales parts,<br />

maintenance & diagnosis, repairs<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

41


Start-up<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Expertise to start-up technically<br />

complicated electrical networks<br />

thanks to a safe, reliable and<br />

quick approach<br />

Delivery<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

42


Start-up<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Reduce risks of delayed<br />

start-up associated with incorrect<br />

settings, installation errors, etc.<br />

●Reduce risks of premature failure<br />

through undetected installation<br />

settings / errors<br />

●Traceability of <strong>Schneider</strong> <strong>Electric</strong><br />

interventions<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

43


Start-up<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●On-site rigorous testing &<br />

inspection procedures using<br />

proprietary hardware & software<br />

tools<br />

●Engineering expertise in<br />

developing protection settings &<br />

discrimination studies<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

44


Start-up<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●From main supply to low voltage<br />

main switchboard<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

45


Start-up<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●HSBC, Magna, Sun Metal Zinc<br />

Refinery, Chrysler, Wal-Mart…<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

46


Start-up reference in automotive industry<br />

Customer needs<br />

● The most reliable services provider for putting<br />

assets into operation<br />

● Start all your electrical distribution operations on<br />

time<br />

● Take care of assets from the beginning of their<br />

lifecycle, and after each major maintenance<br />

Our services solution<br />

● Commissioning & start up with the<br />

manufacturer’s expertise<br />

● Engineering capability on electrical<br />

distribution networks<br />

● Equipment & intervention records<br />

& traceability<br />

Customer benefits<br />

●Reduce risks of delayed start-up and premature failure<br />

●Total peace of mind regarding any technical issue<br />

●To be ready for total asset management<br />

June 10, 2008<br />

47


Customer benefits<br />

● Reduce risks of delayed<br />

start-up and premature failure<br />

● Total peace of mind regarding<br />

any technical issue<br />

● To be ready for total asset<br />

management<br />

June 10, 2008<br />

48


After-sales parts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Upgrade your installation or<br />

replace wear and tear parts with<br />

original components guaranteed<br />

by the manufacturer<br />

Delivery<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

49


After-sales parts<br />

Value<br />

proposition<br />

●Extend life<br />

Customer<br />

benefits<br />

●Reduce CAPEX<br />

●Protection against counterfeit<br />

risks<br />

Delivery<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

50


After-sales parts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Genuine parts delivered on-time<br />

with the manufacturer’s<br />

guarantee<br />

Delivery<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

51


After-sales parts<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●<strong>Schneider</strong> <strong>Electric</strong>‘s product<br />

range<br />

●Guaranteed parts availability for<br />

3 to 8 years after end of<br />

commercialisation, depending on<br />

each product range<br />

●Over 8 years: upon request<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

52


Maintenance & diagnosis at a glance<br />

●Value proposition:<br />

Expert predictive and preventive<br />

maintenance for compliance with<br />

international standards<br />

and original product / equipment<br />

performance<br />

●Delivery:<br />

● On-site, rigorous predictive &<br />

preventive maintenance performed<br />

● By our experts using proprietary<br />

sofware & hardware tools<br />

●Scope:<br />

From main supply to low voltage<br />

main switchboard<br />

●Reference:<br />

Procter & Gamble, Nestlé, Nissan,<br />

Ford, Hewlett-Packard…<br />

Customer benefits:<br />

Minimise unplanned<br />

downtimes<br />

Extend performance level<br />

Traceability of <strong>Schneider</strong><br />

<strong>Electric</strong> interventions<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

53


Maintenance & diagnosis<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Expert predictive and preventive<br />

maintenance for compliance with<br />

international standards<br />

and original product / equipment<br />

performance<br />

Delivery<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

54


Maintenance & diagnosis<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

●Minimise unplanned downtimes<br />

●Extend performance level<br />

●Traceability of <strong>Schneider</strong> <strong>Electric</strong><br />

interventions<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

55


Maintenance & diagnosis<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

●On-site, rigorous predictive &<br />

preventive maintenance<br />

performed by our experts using<br />

proprietary software & hardware<br />

tools<br />

Scope<br />

● From main supply to low<br />

voltage main switchboard<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

56


Maintenance & diagnosis<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●Procter & Gamble, Nestlé,<br />

Nissan, Ford, Hewlett-Packard…<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

57


Maintenance & diagnosis reference in<br />

baby care products<br />

Customer needs<br />

● The most reliable services provider for your<br />

electrical distribution installed base<br />

● Integrate the electrical distribution maintenance<br />

expertise on your operational programs<br />

● Integrate predictive maintenance on your<br />

operational programs<br />

Our services solution<br />

● Preventive & technical assistance<br />

on electrical distribution<br />

● Direct contact to experts on your<br />

installed base<br />

● Expert predictive interventions<br />

Customer benefits<br />

●Preventive and predictive maintenance in operational programs<br />

●Fast access to technical assistance with knowledge of my IB<br />

●To be ready for total asset management<br />

June 10, 2008<br />

58


Our strengths in maintenance<br />

& diagnosis<br />

More than 20 years<br />

of accumulated data on<br />

reliability, mechanical and<br />

technical durability<br />

More than 3 000<br />

field technicians in 130 countries<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

59


Check the benefits of maintenance<br />

Performance<br />

Optimum<br />

Minimum<br />

End of life with<br />

conditional maintenance<br />

End of life with<br />

routine maintenance<br />

End of life & performance<br />

without maintenance<br />

Time<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

60


Repairs<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Getting faulty equipment repaired<br />

and insured for compliance with<br />

international standards by the<br />

original manufacturer<br />

Delivery<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

61


Repairs<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Reduce CAPEX by extending the<br />

service life of equipment<br />

●Traceability of <strong>Schneider</strong> <strong>Electric</strong><br />

interventions<br />

●Guaranteed repairs by<br />

manufacturer<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

62


Repairs<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

● Rigorous repairs performed by our<br />

experts on-site or in our premises<br />

using proprietary software &<br />

hardware tools<br />

● From main supply to low voltage<br />

main switchboard<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

63


Repairs<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●BBV, Valeo systems, Unilever,<br />

Kimberly Clark, Motorola…<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

On-demand maintenance<br />

June 10, 2008<br />

64


Repairs reference in food industry<br />

Customer needs<br />

● To extend the life cycle of a faulty equipment<br />

● To recover as maximum, the original<br />

performance level in your equipment<br />

Our services solution<br />

● Repairs with the manufacturer’s<br />

expertise and genuine spare parts<br />

● Commissioning & start up with the<br />

manufacturer’s expertise<br />

● Equipment & intervention records<br />

& traceability<br />

Customer benefits<br />

●Equipment life cycle improved (CAPEX optimised)<br />

●Equipment put again in operation<br />

June 10, 2008<br />

65


June 10, 2008<br />

66


Modernisation: improve equipment’s<br />

life cycle at a minimum cost<br />

●Are you<br />

● facing a drop in reliability generating significant corrective costs?<br />

● suffering from an increase in operating and maintenance staff risks?<br />

● enduring difficulty to find replacement parts?<br />

● putting up with a loss of internal technical expertise on equipment?<br />

● struggling to conform with current standards? …<br />

●The challenge: zero-downtime, cost effective obsolescence management<br />

Our <strong>Services</strong> solution: refurbishment, retrofit and<br />

replacement with new equipment<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

67


Refurbishment<br />

Value<br />

proposition<br />

●Recover the original performance<br />

of obsolete or worn out <strong>Schneider</strong><br />

<strong>Electric</strong> equipment<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

68


Refurbishment<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●<strong>Schneider</strong> <strong>Electric</strong> equipment<br />

back to original performance<br />

●Traceability of <strong>Schneider</strong> <strong>Electric</strong><br />

interventions<br />

●Ease of raising refurbishment<br />

capital as it is an an OPEX and<br />

not a CAPEX<br />

●Improved safety for<br />

plant staff<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

69


Refurbishment<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

● Reconditioning & treatment of your<br />

<strong>Schneider</strong> <strong>Electric</strong> equipment<br />

● <strong>Services</strong> performed in <strong>Schneider</strong><br />

<strong>Electric</strong> workshops using dedicated<br />

professional tools<br />

Scope<br />

● From main supply to low voltage<br />

main switchboard<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

70


Refurbishment<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●Merck Sharp & Dohme,<br />

Pharmacia, Marine Ltd,<br />

Autotransportes, Epson…<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

71


Refurbishment reference in oil & gas<br />

industry<br />

Customer needs<br />

● Recover the original performance of obsolete or<br />

worn out <strong>Schneider</strong> <strong>Electric</strong> Equipment<br />

● To maintain intact the current installed base<br />

Our services solution<br />

● Reconditioning & treatment of key<br />

materials and parts<br />

● Preventive and predictive<br />

maintenance<br />

● Commissioning & start up with the<br />

manufacturer’s expertise<br />

Customer benefits<br />

●Equipment life cycle improved: CAPEX optimised<br />

●Equipment with the original performance level<br />

●Equipment put again in operation<br />

June 10, 2008<br />

72


Customer benefits<br />

● Equipment life cycle improved:<br />

CAPEX optimised<br />

● Equipment with the original<br />

performance level<br />

● Equipment put again<br />

in operation<br />

June 10, 2008<br />

73


Retrofit at a glance<br />

●Value proposition:<br />

Upgrade the performance of your<br />

equipment to the latest technological<br />

levels without replacing it!<br />

●Delivery:<br />

● Engineered replacement of products<br />

inside existing equipment<br />

● Dedicated experts and professional<br />

tools<br />

●Scope:<br />

From main supply to low voltage<br />

main switchboard<br />

●Reference:<br />

Astra Zeneca, Pemex, EDF, General<br />

Motors, Sanofi…<br />

Customer benefits:<br />

Upgrade performance<br />

capability within an<br />

existing switchboard structure<br />

Reduced downtime by<br />

not having to replace<br />

entire switchboards<br />

CAPEX savings > 30%<br />

by partial rather than total<br />

replacement of a switchboard<br />

or Motor Control Center<br />

Traceability of <strong>Schneider</strong><br />

<strong>Electric</strong> interventions<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

74


Retrofit<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Upgrade the performance of your<br />

equipment to the latest<br />

technological levels without<br />

replacing it!<br />

Delivery<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

75


Retrofit<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

● Upgrade performance capability<br />

within an<br />

existing switchboard structure<br />

● Reduced downtime by<br />

not having to replace<br />

entire switchboards<br />

● CAPEX savings > 30%<br />

by partial rather than total<br />

replacement of a switchboard or<br />

MCC<br />

● Traceability of <strong>Schneider</strong> <strong>Electric</strong><br />

interventions<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

76


Retrofit<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Engineered replacement of<br />

products inside existing<br />

equipment<br />

●Dedicated experts and<br />

professional tools<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

77


Retrofit<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●From main supply to low voltage<br />

main switchboard<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

78


Retrofit<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●Astra Zeneca, Pemex, EDF,<br />

General Motors, Sanofi…<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

79


Retrofit reference in electrical energy<br />

industry<br />

Customer needs<br />

● Upgrade the performance of the equipment to<br />

the latest technological levels<br />

● Reduced modifications are allowed on the<br />

current installed base<br />

● Minimum breaking time<br />

● Be able to current spare parts<br />

Our services solution<br />

● Engineered replacement of products<br />

inside existing equipment<br />

● Commissioning & start up with the<br />

manufacturer expertise<br />

● Limited power down time<br />

Customer benefits<br />

●Equipment life cycle improved: CAPEX optimised<br />

●Equipment with the latest performance level<br />

●Equipment without external physical modifications on the equipment<br />

June 10, 2008<br />

80


Customer benefits<br />

● Equipment life cycle improved:<br />

CAPEX optimised<br />

● Equipment with the latest<br />

performance level<br />

● Equipment without external<br />

physical modifications on the<br />

equipment<br />

June 10, 2008<br />

81


Replacement<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Replacement and installation of<br />

old and non <strong>Schneider</strong> <strong>Electric</strong><br />

equipment using latest<br />

technologies and best practices<br />

Delivery<br />

Scope<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

82


Replacement<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Getting the installation back up<br />

quickly and safely<br />

●Equipment correctly set<br />

and implemented by the<br />

manufacturer<br />

●Traceability of <strong>Schneider</strong> <strong>Electric</strong><br />

interventions<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

83


Replacement<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Engineering, supply and<br />

installation of new equipment<br />

●Dedicated expertise and<br />

professional tools<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

84


Replacement<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●From main supply to low voltage<br />

main switchboard<br />

Reference<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

85


Replacement<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

Reference<br />

●HSBC, Volkswagen, Unilever,<br />

Magna, Wal-Mart, Hewlett-<br />

Packard…<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

Modernisation<br />

June 10, 2008<br />

86


June 10, 2008<br />

87


End-of-life: respect environment<br />

in conformity with legislation<br />

●Increasingly, countries are subject to strict<br />

legislation on waste management:<br />

● Professional electrical and electronic<br />

waste must be collected, sorted,<br />

processed and recycled<br />

● Wastes containing hazardous<br />

substances or special components must<br />

be sorted and processed separately<br />

Our services solution: Treatment and recycling<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

End-of-life<br />

June 10, 2008<br />

88


Treatment and recycling at a glance<br />

●Value proposition:<br />

Commitment to process equipment<br />

according to country legislation without<br />

generating human or environmental<br />

nuisance<br />

Customer benefits:<br />

Complete peace of mind<br />

regarding legislation<br />

●Delivery:<br />

● Legal documents<br />

● Disposal of equipment<br />

●Scope:<br />

Professional electrical and electronic<br />

products or equipment<br />

● Cabinets, transformers, copper,<br />

cables, etc.<br />

● Containing PCB, contaminated oil,<br />

mercury, SF6 gas, very slightly<br />

radioactive components<br />

Optimise administrative<br />

costs<br />

Provide an operational<br />

solution in all cases<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

End-of-life<br />

June 10, 2008<br />

89


Treatment and recycling<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

●Commitment to process<br />

equipment according to country<br />

legislation without generating<br />

human or environmental nuisance<br />

Delivery<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

End-of-life<br />

June 10, 2008<br />

90


Treatment and recycling<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Complete peace of mind<br />

regarding legislation<br />

●Optimise administrative costs<br />

●Provide an operational solution in<br />

all cases<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

End-of-life<br />

June 10, 2008<br />

91


Treatment and recycling<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

●Legal documents<br />

●Disposal of equipment<br />

Scope<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

End-of-life<br />

June 10, 2008<br />

92


Treatment and recycling<br />

Value<br />

proposition<br />

Customer<br />

benefits<br />

Delivery<br />

Scope<br />

●Professional electrical and<br />

electronic products or equipment<br />

● Cabinets, transformers, copper,<br />

cables, etc.<br />

● Containing PCB, contaminated oil,<br />

mercury, SF6 gas, very slightly<br />

radioactive components<br />

<strong>Asset</strong> <strong>optimisation</strong><br />

End-of-life<br />

June 10, 2008<br />

93


Contact your local representative<br />

for more details or to discuss<br />

your specific needs!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!