23.06.2014 Views

DC SERVO SYSTEMS - sanyo denki web catalogue

DC SERVO SYSTEMS - sanyo denki web catalogue

DC SERVO SYSTEMS - sanyo denki web catalogue

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Characteristics of overload duty cycle<br />

When repeatedly driving "SANMOTION T"<br />

under an overload as illustrated in the righthand<br />

figure, calculate the operable time tR<br />

on the basis of the characteristic curve of<br />

overload duty cycle.<br />

tR<br />

tF<br />

TSContinuous stall torque<br />

TLLoad torque<br />

tRLoad time (minutes)<br />

tFRest time (minutes)<br />

Features and<br />

Functions<br />

Model Number<br />

Nomencalture<br />

TL<br />

Armature current<br />

Load factor 100 100<br />

Stall armature current<br />

TS<br />

tR<br />

Load time factor, %ED100<br />

tRtF<br />

<br />

100<br />

Rest time tFtR I<br />

%ED<br />

Typical calculationsV850-012<br />

Supposing that the load factor is 150% and the<br />

percentage of ED is 40%, the load time tR = 3 (minutes),<br />

from the characteristic curve of overload duty cycle.<br />

Therefore,<br />

100 100<br />

Rest time tFtR I3<br />

I 4.5(minutes)<br />

%ED 40<br />

This means that, if you run the system at an overload of<br />

150% with regard to the continuous stall torque for three<br />

minutes, you need a rest time of 4.5 minutes.<br />

System<br />

Configuration<br />

Standard<br />

Specifications<br />

Load factor(%)<br />

300<br />

T402<br />

10% duty<br />

250<br />

20%<br />

200<br />

30%<br />

40%<br />

150 50%<br />

60%<br />

100<br />

0.1 0.5 1 5 10 50 100<br />

Load time tR (min.)<br />

T406<br />

Load factor(%)<br />

300<br />

T404,T506<br />

10% duty<br />

250<br />

20%<br />

200<br />

30%<br />

40%<br />

150 50%<br />

60%<br />

100<br />

0.1 0.5 1 5 10 50 100<br />

Load time tR (min.)<br />

T511,T720,T730,T840<br />

Dimensions External Wiring<br />

Diagram<br />

Setup Software<br />

Optional<br />

Equipment<br />

Load factor(%)<br />

300<br />

10% duty<br />

250<br />

20%<br />

Load factor(%)<br />

300<br />

250<br />

10% duty<br />

20%<br />

200<br />

30%<br />

200<br />

30%<br />

150<br />

40%<br />

50%<br />

150<br />

40%<br />

50%<br />

60%<br />

100<br />

0.1 0.5 1 5 10 50 100<br />

Load time tR (min.)<br />

60%<br />

100<br />

0.1 0.5 1 5 10 50 100<br />

Load time tR (min.)<br />

T850<br />

Load factor(%)<br />

10% duty<br />

300<br />

250<br />

20%<br />

200<br />

150<br />

30%<br />

40%<br />

50%<br />

60%<br />

100<br />

0.1 0.5 1 5 10 50 100<br />

Load time tR (min.)<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!