Alarms for bitumen tanks<br />

Midland Quarry Products > 01530 230530<br />

manual handling & storage: 61<br />

Midland Quarry Products has improved upon the already high standards of its bitumen tank alarms. The<br />

tanks were fitted with integral level indicators with audible and/or visual high and low level alarms.<br />

However, as the Refined Bitumen Association re<strong>com</strong>mends, high-level alarms independent of level<br />

indicators are also in place for a fail-safe system. This eliminates any overfilling.<br />

To further enhance the system, and ensure that all members of staff can be made aware of an incident, a<br />

separate alarm has been installed within the PC control systems.<br />

><br />

Admixture addition on concrete plant<br />

Huntsmans Quarries > Naunton Quarry, Gloucestershire > 01451 850555<br />

This Gloucestershire quarry has a ready-mix plant with a pan mixer and<br />

a dry leg. When conducting specialised mixes with unusual additives,<br />

the heavy drums in use have to be carried upstairs for addition by hand.<br />

To improve safety, the <strong>com</strong>pany created a lockable gate that only<br />

opens inwards on the mezzanine level, so that drums could be lifted up<br />

by telehoist. This eliminated the need for a separate storage area on<br />

the ground to protect from frost.<br />

In the event of a leak, the leakage would be onto the mixing bay of the<br />

concrete plant which is totally contained, removing the potential for<br />

pollution.<br />

><br />

Reducing the risks from manually-fed<br />

additives<br />

Lafarge Aggregates > Aldermaston Readymix Plant, Berkshire > 07803 953990<br />

The value-added materials produced at the Aldermaston Readymix Plant require the plant supervisor to<br />

add materials during the mixing process by hand, often at height in a dusty environment. The pan mixer<br />

has to be opened to add the fibres, which used to require the plant to be locked off for each load.<br />

To improve safety, the <strong>com</strong>pany added a slot to the aggregate intake chute of the pan mixer. This now<br />

allows bags of fibres to be hand added from a designated safe working platform without the supervisor<br />

needing to access the pan mixer or to halt the mixing process.<br />

The design of the slot incorporates a mechanism to prevent dust being blown back into the working area<br />

through the addition of a simple sliding draw. In addition, hand added materials can now also be delivered<br />

directly to the correct height by a fork lift truck.<br />

><br />

Transfer of steel fibres into concrete plant<br />

Tarmac > Gawsworth, near Macclesfield > 01260 223477<br />

The introduction of steel fibres into concrete at the mixing stage can be a strenuous and repetitive task.<br />

Tarmac Area 3 Concrete, at Gawsworth, near Macclesfield, has produced a safe system of work that<br />

includes the use of a forklift truck to move pallets to a 110 volt conveyor.<br />

Manual handling of the bags was the subject of discussion with site personnel, with the out<strong>com</strong>e being an<br />

agreed frequency of work rotation.