Manual handling improvements<br />
programme<br />
CEMEX UK > Raynes Quarry, Clwyd > 01492 517378<br />
manual handling & storage: 57<br />
Recognising the hazards that go with manual handling, this quarry near Colwyn Bay in North Wales has<br />
instigated a raft of measures that include:<br />
• purchase of vacuum cleaning system to avoid spadework in restricted spaces in crushing plant<br />
• use of light, wheeled welding screen<br />
• modified engine hoist to remove electric motors from store where there is no fork-lift access<br />
• installed travelling gantry to handle 205-litre oil drums<br />
• charging primary crusher bearing with grease using pumped system.<br />
><br />
Portable goal posts<br />
Bardon Aggregates > Cambusbeg Quarry, Stirlingshire > 01877 331104<br />
The use of goal posts made of barrels filled with ballast and a length of<br />
painted box section is a long-established method of reducing the risk of<br />
on<br />
<strong>com</strong>ing into contact with overhead power lines. However, once filled<br />
video<br />
with ballast, the barrels be<strong>com</strong>e very heavy and need a loading shovel<br />
to move them. Furthermore, if the cross beam is dislodged by high winds,<br />
a cherry picker is required to replace it.<br />
The safety team at Cambusbeg Quarry<br />
have devised an alternative set-up,<br />
using second-hand wagon wheels and<br />
standard drainage pipe. The wheels provide a secure base and<br />
can be easily rolled into a new position. The use of a standard<br />
drainpipe as a cross beam means that the structure is both<br />
lightweight and cheap to construct and repair.<br />
><br />
Manual handling of mixer lids<br />
CEMEX UK Materials > Redruth Readymix Plant, Cornwall > 01209 218550<br />
Redruth Readymix Plant has devised a method to reduce the risks associated with manual handling whilst<br />
lifting the mixer lids for cleaning and maintenance purposes.<br />
Operators were originally required to manually lift and prop up the covers, which were heavy and often<br />
laden with concrete residue from the day’s production.<br />
To improve safety, the team devised a pneumatic control system consisting of individual switches for a<br />
series of pneumatic rams which lift the covers to a fully open position. Safety chains are then attached to<br />
hold the covers up should the rams fail.<br />
><br />
Dust pan and mini-digger<br />
Kennedy Quarries > Kennedy Quarry, Londonderry > 01480 472673<br />
Beneath a cone crusher, between two concrete walls, spillage used to have to be removed manually by<br />
Kennedy Quarries’ personnel within a confined space and subject to inhalation of dust. Now, both ends of<br />
the ‘tunnel’ are enclosed and a dust pan tray placed longitudinally under the product conveyor, allowing<br />
the tray to be removed and cleaned mechanically on a weekly basis by a mini-digger.