Download PDF (2.3MB) - Safequarry.com
Download PDF (2.3MB) - Safequarry.com
Download PDF (2.3MB) - Safequarry.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Traffic management upgrades<br />
Tarmac Northern > Coxhoe Quarry, County Durham > 0191 3770611<br />
transport – site design: 13<br />
Coxhoe Quarry has taken strides in three key areas over recent years:<br />
External quarry traffic – a new entrance road is<br />
now well established. The previous road has been<br />
upgraded to a bridleway, interlinking with a local<br />
village network of bridleways.<br />
Internal quarry traffic – to reduce vehicle movements:<br />
all stock shovels now operate with digital bucket<br />
weighers, which have been linked in with a numerical<br />
stockpile system, the main stock grounds have<br />
been reduced in size and a haulier safety policy has<br />
been introduced, through which the traffic route<br />
programme has been trialled.<br />
In addition, quarry vehicles are fitted with safety<br />
systems, such as Vehicle Motion Sensors (VMS) and,<br />
in order to ensure that seat belts are in operation, indicator lights have been fitted to windscreens. The<br />
main haul road access has been reduced from a five-bench system to four, to allow for new haul road<br />
ramps. Consultation with staff was vital, as was the use of 3d modelling to forecast effect of the planned<br />
changes.<br />
Parking facilities – parking areas are now centralised and sectionalised into key areas, all of which operate<br />
a ‘reverse-in’ policy.<br />
><br />
Safe deployment of lab sampling<br />
platform<br />
Aggregate Industries > Peterborough Coated, Peterborough > 01733 563081<br />
><br />
Aggregate Industries’ Peterborough Coated plant has a “drawbridge” type lateral extension to an access<br />
gantry, to permit access for testing and sample taking. It was recognised that the tipper driver might<br />
possibly pull away unaware that the drawbridge was down and that the laboratory technician was<br />
testing the load. As a consequence, an automatic system has been installed whereby deployment of the<br />
drawbridge causes a barrier to be lowered in front of the tipper, a traffic light to show red and an audible<br />
alarm to sound.<br />
Car park design improvements<br />
Johnsons Wellfield Quarries > Crosland Hill, West Yorkshire > 01484 652311<br />
Johnsons Wellfield Quarries has introduced a series of improvements to on-site car parking, with the aim<br />
of improving safety for <strong>com</strong>pany personnel, visitors and contractors.<br />
The car park has been redesigned to encourage drivers into reverse parking via a one-way system.<br />
Additional signage has been erected, along with security lighting and CCTV management equipment.<br />
The second phase of the project will see final landscaping and grassing of surrounding areas,<br />
<strong>com</strong>plemented by selective tree and shrub planting. A vintage derrick crane and sand-producing pan roller<br />
mill will also be sited to provide visitor attraction and seating areas.