20.06.2014 Views

Download PDF (2.3MB) - Safequarry.com

Download PDF (2.3MB) - Safequarry.com

Download PDF (2.3MB) - Safequarry.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Traffic management upgrades<br />

Tarmac Northern > Coxhoe Quarry, County Durham > 0191 3770611<br />

transport – site design: 13<br />

Coxhoe Quarry has taken strides in three key areas over recent years:<br />

External quarry traffic – a new entrance road is<br />

now well established. The previous road has been<br />

upgraded to a bridleway, interlinking with a local<br />

village network of bridleways.<br />

Internal quarry traffic – to reduce vehicle movements:<br />

all stock shovels now operate with digital bucket<br />

weighers, which have been linked in with a numerical<br />

stockpile system, the main stock grounds have<br />

been reduced in size and a haulier safety policy has<br />

been introduced, through which the traffic route<br />

programme has been trialled.<br />

In addition, quarry vehicles are fitted with safety<br />

systems, such as Vehicle Motion Sensors (VMS) and,<br />

in order to ensure that seat belts are in operation, indicator lights have been fitted to windscreens. The<br />

main haul road access has been reduced from a five-bench system to four, to allow for new haul road<br />

ramps. Consultation with staff was vital, as was the use of 3d modelling to forecast effect of the planned<br />

changes.<br />

Parking facilities – parking areas are now centralised and sectionalised into key areas, all of which operate<br />

a ‘reverse-in’ policy.<br />

><br />

Safe deployment of lab sampling<br />

platform<br />

Aggregate Industries > Peterborough Coated, Peterborough > 01733 563081<br />

><br />

Aggregate Industries’ Peterborough Coated plant has a “drawbridge” type lateral extension to an access<br />

gantry, to permit access for testing and sample taking. It was recognised that the tipper driver might<br />

possibly pull away unaware that the drawbridge was down and that the laboratory technician was<br />

testing the load. As a consequence, an automatic system has been installed whereby deployment of the<br />

drawbridge causes a barrier to be lowered in front of the tipper, a traffic light to show red and an audible<br />

alarm to sound.<br />

Car park design improvements<br />

Johnsons Wellfield Quarries > Crosland Hill, West Yorkshire > 01484 652311<br />

Johnsons Wellfield Quarries has introduced a series of improvements to on-site car parking, with the aim<br />

of improving safety for <strong>com</strong>pany personnel, visitors and contractors.<br />

The car park has been redesigned to encourage drivers into reverse parking via a one-way system.<br />

Additional signage has been erected, along with security lighting and CCTV management equipment.<br />

The second phase of the project will see final landscaping and grassing of surrounding areas,<br />

<strong>com</strong>plemented by selective tree and shrub planting. A vintage derrick crane and sand-producing pan roller<br />

mill will also be sited to provide visitor attraction and seating areas.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!